Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on October 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tree Removal (10 Trees)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
RRUMC 4th Floor Patient Care Reconfiguration – BP 11 – Demolition, Concrete, Framing And Drywall
Solicitation # 907518.01
The Ronald Reagan UCLA Medical Center 4th Floor Patient Care Reconfiguration project, specifically Bid Package 11, focuses on the conversion of Behavioral Health spaces into Medical/Surgical spaces to expand inpatient bed capacity by up to 103 beds. The scope involves renovating approximately 67,400 square feet of the 115,600 square foot fourth floor, with work extending to the third and fifth floors, outdoor decks, and along Charles Young Drive. Key deliverables include complete selective demolition, concrete repair, metal stud framing, and the installation of level 4 drywall. Additionally, the contractor must provide design-build services for modifications to the existing pneumatic tube system and ensure all alterations meet ADA compliance, sustainability, safety, and security standards. The contract is a lump sum base bid awarded to the lowest responsive bidder, with the final sum calculated based on the base bid, unit prices, compensable delay rates, and any included alternates. Performance is subject to strict quality standards, including CBC/CFC and NFPA regulations, with final acceptance requiring a Letter of Completion from the University Representative after successful testing and submission of as-built diagrams. Bidders must be licensed California contractors and provide a UCIP Form 1-B regarding safety qualifications. The project requires adherence to prevailing wage laws, the provision of performance and payment bonds, and participation in a University Controlled Insurance Program. Bids are due by 2:00 p.m. on December 3, 2026.
The Regents of the University of California

POSTED

about 18 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The County of Marin in California is seeking a subcontractor for a tree removal project involving ten trees. The scope of work includes felling, sectioning, and handling the trees, with specific requirements for operations near the roadway and a mandate that stumps be cut no more than 36 inches above the ground. This opportunity was posted on October 4, 2025, and requires responses by October 20, 2025. The project is categorized under NAICS code 238910 for land clearing and site preparation services.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 41EP2314.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

41EP2314 Tomales Petaluma Rd MP 3.80 Tree Removal Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Vallejo Ferry Terminal Reconfiguration ProjectOpen now, due in 4 days
  • Grape ES - Outdoor Learning Environment - Cimarron ES - Outdoor Learning EnvironmentOpen now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → County of Marin
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → County of Marin
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal of 10 trees including felling, sectioning, and handling near roadway, cut no more than 36 inches above ground.

More opportunities from California → County of Marin

Same awarding agency

NAICS: 541330
SLED
Building Permit Plan Review Service
Solicitation # 2911
The County of Marin Community Development Agency, Building and Safety Division, is soliciting proposals for as-needed building permit plan review overflow assistance. The scope of work includes technical plan reviews for single-family and multifamily dwellings, commercial tenant improvements, and new or remodeled commercial buildings. Selected vendors must ensure complex project reviews are completed within fifteen business days and demonstrate the ability to use ProjectDox software for digital reviews. All work must comply with the California Building Standards Code (Title 24, CCR), AB 2234 timelines, and current state and local building codes. The contract is intended for an initial three-year term, with the possibility of two one-year extensions and further extensions if authorized by FEMA through CalOES. Award decisions will be based on the most advantageous proposal, with a 5.0 percent preference for local county businesses and another 5.0 percent for contractors certifying that at least 50 percent of their workforce are Marin County residents, capped at a total of 10.0 percent. Proposals must be submitted by November 27, 2026, via Bid Express or email. Administrative requirements include a pass/fail verification for debarment and suspension, as well as a pass/fail evaluation for interviews and demonstrations. The contractor must maintain a documented quality assurance and quality control program and provide a certificate of liability insurance naming the County of Marin as an additional insured. Invoicing is conducted on a net 30 basis via postal mail, and the County will withhold 7 percent from payments to non-resident California vendors. Final authority regarding code interpretation and document compliance remains with the County Building Official.
Engineering Services

POSTED

13 days ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS