Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Tree Removal and Stump Grinding

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Laguna Beach has initiated a subcontract for the safe removal of ten hazardous or declining trees located within the 92651 zip code area. This work encompasses the complete extraction of the trees, followed by stump grinding to eliminate remaining root structures and thorough site cleanup to restore the area to a safe and aesthetically acceptable condition. The project falls under NAICS code 238990, which classifies it as other specialty trade contracting, indicating specialized services outside standard construction categories. The contract was posted on June 12, 2026, and though the solicitation number is not provided, the work is tied to a formal project identified through the CEQA Net system, ensuring compliance with environmental review procedures. All activities must be performed in accordance with local safety and environmental standards, and the contractor is responsible for ensuring no damage to surrounding property, infrastructure, or natural features during execution.

General Info

Laguna Beach to remove ten hazardous trees, grind stumps, and clean sites in 92651 zip code.

Agency

California → City of Laguna Beach

Place of Performance

Laguna Beach, CA, 92651

Set-Aside

NONE

Documents

This scope was carved out of 25-0319.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Modification of Design Review 25-0319 and Coastal Development Permit 25-0318 of the Promenade Design Approvals for Tree Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Laguna Beach
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Laguna Beach
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Safe removal of 10 hazardous or declining trees, including stump grinding and site cleanup.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
On-Call Maintenance and Minor Construction Services
Solicitation # RFP-VC-26-008
The Inland Empire Regional Composting Authority is soliciting proposals under RFP-VC-26-008 for licensed general contractors to provide on-call maintenance and minor construction services in California. This Master Services Contract will utilize a time-and-materials structure with work assigned via Task Orders. The scope of work includes millwright work, welding, fire sprinkler system maintenance, general construction such as framing and concrete, and the maintenance of conveyors, hoppers, and heavy equipment. A critical requirement is the ability to respond to site failures within 1.5 hours. The Authority intends to award multiple contracts based on an evaluation of price, payment terms, the nature of any exceptions taken to the RFP, personnel experience, and the quality of the proposed work plan. Proposals must be submitted electronically via PlanetBids by October 29, 2026, at 3:00 p.m. Qualified contractors must be registered with the Department of Industrial Relations and adhere to California Labor Code prevailing wage requirements. Key financial and legal obligations include maintaining commercial general liability insurance of at least $1,000,000 per occurrence and providing performance and payment bonds for any Task Order exceeding $25,000. The contract offers an expedited payment protocol where contractors can receive payment in 10 to 20 days in exchange for a 1% to 5% invoice reduction; otherwise, standard payment terms are 30 days. All work must comply with OSHA safety standards, and the Authority retains ownership of all project-related data and materials.
Inland Empire Utilities Agency

POSTED

about 2 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238990
New
Federal
Watervliet Arsenal (WVA) Perimeter Fence Extension
Solicitation # W911PT27QA005
The Army Contracting Command Watervliet Arsenal is soliciting proposals for a perimeter fence extension project at the Watervliet Arsenal in New York. This total small business set-aside effort requires the contractor to provide all construction management, labor, materials, and equipment to install approximately 327 lineal feet of new fencing. The project focuses on improving the perimeter fence around a civilian structure in the West Campus and extending the fence length at the Gillespie Gate. Technical specifications require 7 foot tall, 2 inch mesh, 9 gauge aluminized chain link fencing with a galvanized industrial grade framework featuring continuous top and bottom rails and top braces with diagonal trusses. The estimated project magnitude is between 25,000 and 100,000 dollars, with 100 percent payment bonds required if the total cost exceeds 35,000 dollars. The period of performance is 30 calendar days from the receipt of the Notice to Proceed. Award will be based on the lowest evaluated offer or best value, provided the offeror meets all material requirements and responsibility criteria under FAR 9.104. Proposals must be submitted electronically via the PIEE Solicitation Module by October 23, 2026. The contract is subject to the Davis-Bacon Act, Buy American-Construction Materials requirements, and strict DoD security and facility access protocols.
W6QK Acc Wva

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS