Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Trenchless Culvert and Pipeline Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Trenchless Culvert and Pipeline Installation involves the specialized installation of reinforced concrete pipes for prime contractors on Caltrans highway projects located in Riverside County. The scope of work includes boring, jacking, and grouting to install culverts, as well as managing subsurface movement to prevent faulting and performing necessary void inspections. The contractor will utilize boring machines, jacking equipment, and monitoring instrumentation to deliver a fully installed and grouted pipeline system. The opportunity is categorized under NAICS code 237990 and is associated with the California Department of Transportation. Interested parties must submit their responses by the deadline of November 10, 2026.

General Info

Subcontract for Caltrans trenchless pipeline installation in Riverside County, due November 10, 2026.

Documents

This scope was carved out of 08-1L8204.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In Riverside County From 0.4 Mile South Of Indian Truck Trail Undercrossing To 1.1 Miles North Of Temescal Canyon Road Undercrossing Bridge

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs trenchless installation of reinforced concrete pipes (RCP) for prime contractors on Caltrans highway projects in Riverside County. Executes boring, jacking, and grouting to install culverts, manages subsurface movement to prevent faulting, and performs void inspection and grouting. Utilizes boring machines, jacking equipment, and monitoring instrumentation. Delivers installed and grouted reinforced concrete pipeline/culvert system.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS