Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on September 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trenchless Installation of Welded Steel Pipe (WSP)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The California Department of Transportation is seeking a subcontractor for the trenchless installation of welded steel pipe. The project requires the use of specialized methods, such as horizontal directional drilling, to install piping beneath a highway corridor while minimizing disruption to the surface. This opportunity was posted on September 30, 2024, and requires responses by November 13, 2024. The work falls under NAICS code 237110, focusing on heavy and civil engineering construction.

Documents

This scope was carved out of 01-0H6404.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

WSP trenchless installation, CSP, and erosion control.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install welded steel pipe using trenchless methods such as horizontal directional drilling beneath a highway corridor to minimize surface disruption.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 236220
New
SLED
Building Construction In Sonoma County In And Near Santa Rosa At 224 Lincoln Street And 3251 Brickway Boulevard
Solicitation # 04-2Q5804
The California Department of Transportation has issued solicitation 04-2Q5804 for building construction projects located at 224 Lincoln Street and 3251 Brickway Boulevard in Santa Rosa, California. The primary scope of work involves the removal of existing electrical service and distribution systems at the Santa Rosa Maintenance Station and the installation of complete, operational electrical systems. Key deliverables include the provision of temporary construction power, heat, and lighting, as well as the execution of testing and commissioning. The contractor is required to maintain as-built drawings and provide comprehensive product data and shop drawings. Technical requirements mandate strict adherence to NFPA 70, ANSI, and IEEE standards, with specific packaging and marking protocols for electrical devices and wood structural panels. Quality assurance involves the use of qualified testing agencies and factory-authorized representatives, with mandatory infrared scanning of switches and circuit breakers after substantial completion. The project also requires compliance with 2008 ADA Standards for Accessibility, Buy America requirements for steel and iron, and specific cybersecurity hardening guides for the system. Administrative requirements include a unit price bid submission with a security deposit of at least 10 percent. Bidders must provide certifications for Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation, with specific deadlines for commitment and confirmation. The contract emphasizes labor compliance through prevailing wage rates as determined by the California Department of Industrial Relations. Performance milestones include the energization of the Battery Energy Storage System within two weeks of delivery to the site.
Commercial and Institutional Building Construction

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS