Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Trenchless Sewer Rehabilitation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Buenaventura is seeking to rehabilitate an aging gravity sewer line using trenchless technology to eliminate structural damage and prevent hydrocarbon infiltration, avoiding the need for traditional open-cut excavation. The work will employ proven methods such as cured-in-place pipe (CIPP) lining or pipe bursting to restore integrity and functionality while minimizing surface disruption and environmental impact. This subcontract opportunity is categorized under NAICS code 237110, which covers sewer and water line construction and rehabilitation services, indicating a focus on infrastructure renewal through advanced, non-invasive techniques. The project is situated in Ventura, California, and is scheduled for procurement with a posting date of July 16, 2026, suggesting planning and prequalification phases are underway ahead of active construction. All work must comply with stringent standards for durability, leak prevention, and public safety, with performance expectations centered on long-term reliability and minimal community disruption during execution.

General Info

San Buenaventura to rehabilitate gravity sewer via trenchless tech like CIPP or pipe bursting, avoiding excavation.

Agency

California → City of San Buenaventura

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Ventura, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Buenaventura
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of San Buenaventura
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Rehabilitation of an existing gravity sewer line using trenchless methods such as CIPP lining or pipe bursting to address structural issues and hydrocarbon infiltration without full excavation.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is forecasting a project to restore the integrity of a 1947 water main located along the Northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. This effort aims to reinforce the aging infrastructure without excavation, leveraging trenchless rehabilitation methods to extend the service life of the water main while minimizing disruption to adjacent transportation corridors. The project is classified under NAICS code 237110, indicating it falls within the water and sewage line and related structures construction category. All work will be performed at the specified location near the Airport Expressway, with no alternative performance sites identified. Moraa Omwega serves as the primary point of contact for inquiries, reachable via phone or email, while Ray Moreno is designated as the Project Manager overseeing execution. The solicitation has been posted for forecast purposes and is not yet open for bidding, with no set-aside type or formal solicitation number assigned at this time. Interested parties should monitor the official Port of Seattle portal for future updates, including formal bidding timelines, technical specifications, and contract award details. The project underscores the Port’s commitment to maintaining critical utility assets supporting airport operations and regional infrastructure resilience.
Aviation Project Management Group

POSTED

about 1 hour ago

DEADLINE

N/A
View Details
NAICS: 237110
New
International
Greater Mandeville Water Supply Improvement Project- Pepper/Goshen Distribution Network- Old Pepper Well to Old Pepper Main Road, Manchester/St. ElizabethThe National Water Commission of Jamaica is soliciting bids for the supply and delivery of 1 kilometer of 250mm nominal diameter ductile iron pipes along with all necessary associated fittings for the Greater Mandeville Water Supply Improvement Project. The work is focused on the Pepper/Goshen Distribution Network, specifically extending from the Old Pepper Well to the Old Pepper Main Road in Manchester and St. Elizabeth. Bidders must ensure compliance with all technical and quality specifications for the pipes and fittings, as the project aims to enhance water infrastructure reliability in the region. The solicitation is open to qualified suppliers and contractors who can meet the required delivery and installation standards. The solicitation, identified by number 1618/1423, was posted on July 24, 2026, and responses must be submitted no later than August 19, 2026, at 4:00 PM. The contract does not specify a set-aside designation and is classified under the government of Jamaica’s broader water infrastructure program. All correspondence and submissions should be directed through the official ePPS portal, with no physical office address or point of contact listed. The place of performance is confined to the designated路段 in Manchester and St. Elizabeth, and bidders are expected to account for logistics, handling, and timely delivery to meet project timelines and operational requirements.
National Water Commission

POSTED

about 8 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Federal
Repair Water Tower B738The solicitation FA303026Q0013 seeks qualified small business contractors to perform repair and repainting work on Water Tower B738 located at Goodfellow Air Force Base, Texas. The project involves comprehensive interior rehabilitation of a 400,000-gallon elevated water storage tank, including surface preparation, removal of existing coatings, application of new protective linings compliant with NSF/ANSI Standard 61 and SSPC specifications, and structural metal fabrication to replace the overflow stub pipe, install a new riser access manway, replace the internal ladder, and add steel safety grating. All work must meet current NFPA and OSHA standards and adhere strictly to the attached specifications, drawings, and quality control requirements. The contract is issued as a Combined Synopsis/Solicitation under FAR Part 12 as a commercial item acquisition, with a firm fixed price structure and a total estimated value between $500,000 and $1,000,000. Performance is expected within 120 calendar days after issuance of the Notice to Proceed, with work required to be completed at the site on Goodfellow AFB under the oversight of the Government’s Contracting Officer and designated representatives. Offers must be submitted electronically as a single PDF not exceeding 20 pages for technical content and must include a completed pricing schedule, legal business name, CAGE code, small business status, and point of contact information. Submission is due no later than 2:00 PM CST on August 24, 2026, to designated government email addresses. A pre-quote site visit is scheduled for July 30, 2026, and applicants must first submit a Base Access Letter by July 27, 2026. Evaluation will follow a Lowest Priced Technically Acceptable (LPTA) methodology, where price is the deciding factor among technically acceptable offers demonstrating acceptable past performance with at least three similar projects valued between $300,000 and $1,000,000 completed since FY2021. Technical acceptability requires strict compliance with specifications, environmental and safety regulations including 40 CFR 261, EM 385-1-1, and GHS hazard communication, and the implementation of a certified Contractor Quality Control plan. Key personnel must include an OSHA-30 certified Project Superintendent, a full-time Site Safety and Health
FA3030 17 Cons Cc

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Z2NE--CON Project 667-22-118, Replacement Underground Water TanksThe contract pertains to the replacement of underground water tanks at a Department of Veterans Affairs facility in Shreveport, Louisiana, under solicitation number 36C25626R0064 and project designation 667-22-118. The scope of work involves comprehensive construction activities including site preparation, excavation, earthwork, backfill, subgrade treatment, paving, drainage structures, and erosion control, with a total estimated value between $2 million and $5 million. Proposals must be submitted as a single consolidated PDF file not exceeding 10 MB, emailed to the Contracting Officer by the extended deadline of July 24, 2026, at 1:00 p.m. CDT. The procurement is conducted as a negotiated RFP with no set-aside or socioeconomic preference indicated, and the evaluation is based on a trade-off analysis balancing four equally weighted factors: technical approach with schedule and quality management, professional qualifications and specialized experience, past performance, and price. The solicitation requires strict adherence to construction standards including ASTM, ASME, NFPA, and ICC codes, along with implementation of a Construction Quality Control Plan and coordination with Special Inspections. The contract incorporates numerous FAR clauses, many with authorized deviations, particularly concerning small business subcontracting, Buy American requirements for construction materials, differing site conditions, wage rates, and inspection procedures. Technical requirements mandate specific labeling and marking protocols for materials and equipment, including bar codes for inventory tracking and engraved valve tags made of brass, and require materials to be stored within a temperature range of 45°F to 85°F prior to use. Performance must occur on-site, with final acceptance conducted by the Government’s authorized designee following Pre-Final and Final Inspections. Key personnel must include a CQC System Manager with five years of experience, an OSHA 30-certified Site Safety and Health Officer, and an independent Special Inspector of Record. All offerors must provide UEI and CAGE codes, certify size status and socioeconomic status through SAM, and disclose any organizational conflicts of interest under FAR clauses. Submission of a wet-signed bid bond with legible notarization via email is mandatory, and all communication and document submission must be conducted electronically with no physical submissions permitted. Payment will be processed exclusively through the VA’s Electronic Invoice Presentment and Payment system, with remittance handled by the VA Financial Services Center in Austin, Texas.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 18 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Federal
USFWS FLINT HILLS NWR, KS - PUMP REPLACEMENThe U.S. Fish and Wildlife Service is soliciting bids under solicitation number 140FGA26Q0048 for the replacement of a pump and associated piping systems at the Flint Hills National Wildlife Refuge located approximately 2.5 miles north of Hartford, Kansas. This procurement is a Total Small Business Set-Aside under FAR 19.502-2, restricted exclusively to small businesses certified under NAICS code 237110 with a size standard of $45.0 million in annual receipts. All offerors must be currently registered in the System for Award Management (SAM) to be eligible, and payments will be processed via Electronic Funds Transfer using information from their SAM records. The contract will be awarded on a Firm Fixed Price basis, with evaluation based on three factors—Technical Approach, Past Performance/Experience, and Price—in order of importance, with award intended to go to the offeror providing the best value through a trade-off approach rather than lowest price technically acceptable. The estimated contract value falls between $100,000 and $350,000, triggering compliance with FAR 36.204 disclosure requirements for construction projects in that range, and the period of performance is anticipated to be 80 to 90 calendar days following issuance of the Notice to Proceed, with no work permitted on weekends or federal holidays without prior authorization. The scope of work requires installation of a 5000 gpm, 30-foot head, three-phase, single-stage submersible pump with a Variable Frequency Drive (VFD), connected to existing plastic piping, along with necessary underground electrical conduit to an onsite tower. All materials must be stainless steel, corrosion-resistant, UV-resistant, and suitable for potable water applications, with systems designed to drain completely to prevent freezing. Flint Hills NWR will provide heavy equipment and earthwork, while the contractor is responsible for all installation, permitting, compliance with federal and state regulations including OSHA, EPA, Kansas DEQ, and the Archaeological Resources Protection Act, site restoration, debris removal, and submission of warranties, permits, certified payrolls, and as-built drawings. Inspection and acceptance occur on-site by the Refuge Manager or designee and require written certification from the contractor that all work meets contract specifications. Key requirements include adherence to ANSI D61 for traffic control, immediate reporting of any fossil or cultural artifact discoveries, and use of only approved components. There are no specified packaging, preservation
Sat Team 1 Fws

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details