Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tri Base UK SABER 2.0

Closed
FA558726R0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, project number 7190530, involves upgrading life health safety systems within Hangar 250 at MCAS Cherry Point in Havelock, North Carolina. The scope of work encompasses architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price. Bidders must submit proposals by September 21, 2026, and those exceeding 150,000 dollars are required to provide bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and Buy American requirements. Key deliverables include a facility operating plan and manufacturer-provided training information. Administrative requirements include submitting invoices via Wide Area Workflow and providing a detailed schedule of prices within 15 days of the award. Quality control is heavily emphasized, requiring the Contracting Officer's acceptance of a QC plan before any construction work, other than mobilization and surveying, may begin.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project encompasses the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. To maintain center operations, contractors must utilize a phased sequencing approach, renovating one dormitory at a time. All work must comply with ADA, OSHA, and National Electrical Code standards, and contractors are responsible for the daily off-site disposal of all debris. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, and proof of current Vermont state professional licensing and insurance. The award will not be based solely on the lowest bid, as ETR will evaluate technical alignment with the scope of work to minimize future change orders. Winning bidders must maintain active registration in SAM.gov and provide a Unique Entity ID. The contract incorporates various FAR clauses, including requirements for the Davis-Bacon Act, anti-lobbying certifications, and combating trafficking in persons. Payment terms are net 30 days, contingent upon the submission of a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 11 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The United States Air Force, through the 48 Fighter Wing at RAF Lakenheath in the United Kingdom, is conducting market research to inform the development of a second-generation Simplified Acquisition of Base Engineering Requirements (SABER) contract, to be structured as an Indefinite Delivery/Indefinite Quantity (IDIQ) vehicle with an anticipated eight-year period of performance starting in September 2027. This Request for Information is not a solicitation and does not obligate the government to award a contract; however, it seeks detailed capability statements from firms capable of delivering a broad range of maintenance, repair, alteration, and minor construction services across the Tri-Base Area encompassing RAF Lakenheath, RAF Mildenhall, and RAF Feltwell. Historical data from the current SABER contract, which runs through August 2027, shows annual spending of approximately $4 million to $5 million in FY24 and FY25, excluding anomalies such as a $14 million spike in FY23 due to two large, one-time projects absorbed by the vehicle. Respondents must demonstrate their ability to handle tasks ranging from small office renovations to complex facility upgrades involving plumbing, electrical, structural, and aesthetic finishes, with project values typically between $20,000 and $250,000. The solicitation number is FA558726R0005, and responses must be submitted electronically no later than 1400 GMT on July 31, 2026, via email to designated contracting officers, with submissions limited to 20 pages excluding administrative details and annotated SOW feedback. Prospective offerors must provide comprehensive administrative information, including their Unique Entity Identifier (UEI), NCAGE code (for non-U.S. firms), and confirmation of active SAM registration, which is required for any future contract award but not for responding to this RFI. The government is particularly interested in understanding potential barriers to entry, especially for non-UK firms, including visa and workforce acquisition challenges, supply chain logistics, and local compliance with UK standards such as the Construction Design and Management (CDM) Regulations 2015, and professional accreditations like RICS, CIOB, and NICEIC. Contractors are expected to outline their minimum viable annual volume requirement to justify mobilization and operational costs over the eight-year term and estimate their mobilization timeline. The government is evaluating potential evaluation criteria for the future

General Info

AF seeks qualified firms for eight-year UK base maintenance contract starting 2027, targeting Tri-Base Area with IDIQ vehicle.

Agency

Department Of Defense → FA5587 48 Cons (admin Only No Req)View Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

RAF Lakenheath, GB-SFK, IP27 9PN, GBR

Set-Aside

NONE

Documents

(4)

SABER 2.0 Statement of Work V1 23 July 2026

DOCXsow

RFI for SABER Project Tri-Base Area UK 23July2026

PDFrfi

National Schedule of Rates Building Guidance Notes and Preambles

PDFguidance-notes

National Schedule of Rates - Building Works August 2020-2021

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5587 48 Cons (admin Only No Req)
Contacts2 people available
OfficeAPO, AE, 09461-5120, USA
Organization / Agency
Department Of Defense → FA5587 48 Cons (admin Only No Req)
View Agency Profile
Office AddressAPO, AE, 09461-5120, USA
Contacts
CLAIRE HAMMOND
Rachel Oldfield

Full Description

Show more

REQUEST FOR INFORMATION (RFI)
Project: Simplified Acquisition of Base Engineering Requirements (SABER)
Tri-Base Area, United Kingdom
I. PURPOSE & DISCLAIMERS
The United States Air Force (USAF), 48 Fighter Wing (48 FW), Royal Air Force (RAF) Lakenheath, United Kingdom (UK) is conducting market research to identify firms capable of executing the requirements for our upcoming second-generation Simplified Acquisition of Base Engineering Requirements (SABER) contract. We invite prospective offerors to submit a Capability Statement demonstrating their ability to fulfill these requirements.
This Request for Information (RFI) is for informational purposes only and does not constitute a solicitation, Invitation for Bid (IFB), Request for Proposal (RFP), or Request for Quotation (RFQ). The USAF makes no commitment, express or implied, to buy resources or contract for services based on this publication. No solicitation is currently available; any future solicitation will be formally announced on System for Award Management (SAM), the Government Point of Entry (GPE).
Active registration in the SAM is not required to submit a response to this initial RFI. However, to be eligible for contract award under any subsequent solicitation, prospective offerors must have an active SAM registration both at the time they submit their proposal and at the time of contract award. Because the validation process can take several weeks, respondents are strongly encouraged to initiate or renew their registration immediately. If your firm needs to start this process, step-by-step guidance is provided in Section IV.
No reimbursement will be made for any costs associated with providing information in response to this announcement. No evaluation letters or results will be issued to respondents.
II. BACKGROUND
The 48 FW, RAF Lakenheath, UK, is seeking to establish a second-generation SABER contract. This contract will provide a responsive and flexible method for completing a broad range of maintenance, repair, alteration, and minor construction projects across the Tri-Base Area (RAF Lakenheath, RAF Mildenhall, and RAF Feltwell).
To provide prospective offerors with a clear understanding of the potential scope and scale of this new contract, we are providing a representative sample of projects executed under the current SABER program, alongside historical task order volumes and spend. The data below is outlined by Fiscal Year (FY), which runs from 01 October to 30 September.
The current 48 FW SABER contract, which commenced in August 2022 and concludes in August 2027, has successfully delivered numerous projects, demonstrating a strong partnership between the USAF and our contract awardee.
When analyzing the historical execution patterns of the current vehicle, offerors should keep two critical operational anomalies in mind:
• FY22: The current vehicle was awarded late in August 2022 and the fiscal year concluded in September 2022. As a result, the low task order volume and spending during this period does not reflect a standard annual operational tempo.
• FY23: The high spending in FY23 represents a significant anomaly rather than an expected baseline. During this period, SABER was utilized to absorb two high-value projects, one for $5 million and another for $2 million due to no other contract vehicle available at the time. Excluding these two requirements, the baseline annual spend aligns more closely with the levels observed in FY24 and FY25.
The table below outlines the total SABER spend and task order volume for the first four fiscal years of the current contract (Total FY22–FY25: £17.4M GBP / $23.5M USD):
These projects demonstrate the typical variety, complexity, and magnitude of task orders executed under this vehicle. Complex efforts, such as Facility Upgrades, demand multi-discipline coordination involving plumbing, mechanical integrations, structural fit-outs, and complete aesthetic finishes. This program accommodates highly variable requirements, proving its capacity to deliver everything from small-scale maintenance to major infrastructure modernization.
Project Type
Description
GBP approx. Awarded
USD approx. Conversion
Office Renovation
Construction of a partition wall to create new office space.
£17,000
$22,000
Utility Upgrade
Installation of a new electric supply.
£65,000
$83,000
Facility Upgrades
Installation of plumbing and pipework in building bathrooms. Includes new toilet cubicles, new vanity units, and Integrated Plumbing System (IPS) panels to enclose mechanical services. Complete decoration including new flooring, walls, and ceilings.
£182,000
$228,000
Road Repairs
Modification of a roundabout, line painting, and installation of flashing lights.
£176,000
$207,000
FY
# Task Orders
SABER GBP
SABER USD
22 (1 month)
4
400K
535K
23
27
10M
14M
24
32
4M
5M
25
36
3M
4M

Period of Performance (PoP) and Economic Feasibility:
The Government anticipates a long-term partnership, with an intended PoP of eight (8) years commencing in September 2027.
III. RESPONSE GUIDELINES & SUBMISSION FORMAT
To facilitate a timely and comprehensive review, respondents must adhere to the following submission guidelines:
• Submission Deadline: Responses are due no later than 1400 GMT on 31 July 2026.
• Submission Method: Submit all responses via email attachment to the Points of Contact listed in Section V. Only electronic responses will be accepted. No telephone calls will be accepted requesting a bid package or solicitation.
• File Size & Format: The 48 Contracting Squadron (48 CONS) cannot accept emails over 5MB. If your submission exceeds 5MB, please contact the Points of Contact to request a DoD Safe request.
• Page Limit: Responses are not to exceed 20 pages. (Note: The following items do not count toward this limit: 1) Administrative information in Section IV, Part A, and 2) The Statement of Work (SOW) with tracked changes/comments).
• Prohibited Materials: Do not submit brochures, samples, catalogs, or generic marketing/solicitation information.
• Proprietary Information: Any proprietary information must be clearly marked as “PROPRIETARY INFORMATION”. The Government will handle this data accordingly.
IV. REQUESTED INFORMATION
Part A: Administrative & Vendor Information
Please provide the following administrative details:
1. Company Details: Full vendor name, physical address, and primary point of contact (name, title, email, and phone number).
2. Entity Identifiers: Unique Entity Identifier (UEI) and CAGE (five-character, alphanumeric identifier)/NCAGE (international equivalent of a CAGE code) code.
NOTE: Non-US companies must obtain an NCAGE Code. This is provided free of charge and is obtained through the UK Ministry of Defence (MOD) National Codification Bureau. Visit the MOD National Codification Bureau portal directly at: https://www.ncb.mod.uk to apply.
3. SAM Status: Confirm active registration status in the SAM.
NOTE: Once your NCAGE code is verified in the Defense Logistics Agency (DLA) database, you can create your entity registration in SAM. Visit the official, secure US Government portal: https://sam.gov

Part B: Capability & Market Research Questions
Please provide direct, concise responses to the following questions within your 20-page capability statement limit:
1. Capability & Risk Assessment: After reviewing the draft Statement of Work (SOW), does your company possess the capability and interest to perform the full scope of work? If there are specific risks, ambiguities in the SOW, or operational barriers that would deter you from bidding on a formal solicitation, please detail those constraints here.
2. UK Regulatory, Accreditation, and Insurance Alignment: Are there standard UK commercial construction practices, professional accreditations (e.g., Royal Institution of Chartered Surveyors (RICS), Chartered Institute of Building (CIOB), National Inspection Council for Electrical Installation Contracting(NICEIC)), local certifications, mandatory insurances (such as Professional Indemnity, Public Liability, or Employer's Liability), or statutory licensing requirements necessary for this scope of work that are not currently addressed in the draft SOW?
NOTE: Please specify any UK regulations (such as Construction Design and Management (CDM) 2015) that should be explicitly incorporated to ensure safety and legal compliance.
3. Minimum Viable Annual Volume: Under a single-award SABER Indefinite Delivery Indefinite Quantity (IDIQ) structure, what is the minimum annual project volume (expressed in GBP or USD) your firm would require to make participation and mobilization economically viable over the proposed 8-year Period of Performance?
a. Minimum Annual Value Required: £/________________ (or $________________)
b. Cost Drivers: Briefly describe the primary fixed overhead costs (e.g., local office setup, dedicated staffing, compliance) that dictate this minimum threshold.
c. Mobilization Period: What is your estimated timeline to fully mobilize staff and establish a presence in the Tri-Base Area once the contract is awarded?
4. UK Mobilization Plan & Timeline (For US/Non-UK Firms): If your firm's primary operations are outside the UK, please detail your anticipated approach to establishing and maintaining a presence in the Tri-Base area. Specifically address the following:
a. Personnel & Staffing: What is your strategy for staffing this contract? Describe anticipated challenges and timelines related to obtaining visas/work permits for non-UK personnel versus hiring and training local UK talent.
b. Supply Chain & Logistics: How do you plan to establish your supply chain for materials and equipment? Describe any anticipated challenges with UK sourcing, customs, or logistics.
5. Long-Term Partnership & Evaluation Criteria: What contract mechanisms or evaluation criteria do you recommend the Government utilize to select and retain a highly capable, collaborative partner for this 8-year IDIQ?
6. Acquisition Strategy & Evaluation Criteria: The Government is considering evaluating Past Performance using prior SABER, Multiple Award Task Order Contract (MATOC), or UK Framework Agreement experience.
a. Evaluation Concerns: Do you have any concerns regarding this evaluation approach? Specifically, please identify any barriers this might create for highly qualified local UK firms that may not have direct experience with US Department of War (DoW) contracting processes.
b. UK vs. US Equivalency: What specific UK-equivalent past performance markers (e.g., Joint Contracts Tribunal (JCT) contract execution, Scape/Crown Commercial Service frameworks) should the Government treat as equivalent to US military SABER/MATOC experience?
c. Recommended Capabilities: What alternative or additional criteria (such as supply chain resilience, safety records under CDM 2015, or local subcontractor networks) do you recommend to effectively measure a contractor's capability to execute this specific scope?
7. SOW Clarity, Constructability, & Technical Feedback: The Government requests detailed feedback on the clarity, constructability, and technical feasibility of the draft SOW. Please provide your input using the structure below:
a. Ambiguous or Unclear Requirements: Identify any specific sections, paragraphs, or technical specifications that are unclear or open to misinterpretation.
b. Overly Restrictive Specifications: Please point out any requirements, specified materials, or standards that may be overly restrictive, proprietary, or not aligned with standard UK construction practices.
c. Suggested Revisions: For any issues identified above, please suggest alternative language, UK-equivalent standards, or revised specifications that would improve clarity and promote competition.
V. POINTS OF CONTACT
Please submit a response via email attachment on company letterhead to the points of contact listed below.
• Ms. Rachel Oldfield, Contracting Officer
Email:rachel.oldfield@us.af.mil
• Ms. Claire Hammond, Contract Specialist
Email:claire.hammond.gb@us.af.mil
• Ms. Patsy Hereford-Goesmann, Contract Specialist
Email:patsy.hereford-goesmann.1@us.af.mil
Attachment:
1. Statement of Work

More opportunities from Department Of Defense → FA5587 48 Cons (admin Only No Req)

Same awarding agency

NAICS: 333922
New
Federal
48 LRS/MUNS High Line Docks
Solicitation # FA558726Q0052
Solicitation FA558726Q0052 is a firm-fixed-price requirement for the procurement and installation of heavy-duty rollerized Cargo Highline Docks at RAF Lakenheath for the 48th Logistics Readiness Squadron (48 LRS) and 48th Munitions Squadron (48 MUNS). The base requirement consists of one permanent three-lane integrated highline cargo dock system providing 18 total 463L pallet positions, which includes the dismantling of the legacy dock and subsequent certification. Additionally, the government has included an option for one modular, relocatable single-lane highline cargo dock system providing 6 total 463L pallet positions, designed for relocation via 10K standard military forklifts, with an option exercise window extending through September 30, 2027. The contract will be awarded based on a best value determination, weighing technical capability and total evaluated price, with a 10 percent price evaluation preference applied to HUBZone small business concerns. Offerors must submit a price quotation via the provided quote sheet and technical documentation not exceeding 20 pages by September 16, 2026. Key compliance requirements include active SAM registration, adherence to MIL-STD-130 for unique item identification, and the use of the Wide Area WorkFlow system for invoicing. Due to the overseas location, no specific set-aside is used, though the contractor must coordinate base access and security passes for all personnel performing work on the installation.
Conveyor and Conveying Equipment Manufacturing

POSTED

about 15 hours ago

DEADLINE

in 11 days
View Details
NAICS: 334118
New
Federal
48 OG - OSA Secondary Crash Network
Solicitation # FA558726Q0047
The 48th Contracting Squadron at RAF Lakenheath is soliciting quotes for a firm-fixed-price contract to engineer, furnish, install, test, and implement an Emergency Conferencing System for the Secondary Crash Net (SCN). This system is designed to support 18 emergency response base agencies and must include 30 ports and sessions for alerting and tracking first responders. Key technical requirements include multi-line calling capabilities, visual activation features for tracking takeoff data, noise reduction, and recording capabilities in accordance with AFMAN 13-204 V2 and DAFMAN 13-204 V2. The contractor is also required to provide operator, maintenance, and troubleshooting training for site personnel and 12 months of remote technical support. The government will award the contract based on a best value determination, weighing technical capability and total evaluated price. Vendors must provide detailed technical specifications demonstrating how their products meet the requirements outlined in the statement of work. Due to the overseas location, no set-aside is being used for this procurement. All quotes must be submitted via the provided quote sheet and require an active System for Award Management registration. Following an amendment, the final response deadline for submissions is September 17, 2026. Payment will be processed electronically through the Wide Area WorkFlow system.
Computer Terminal and Other Computer Peripheral Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 337215
New
Federal
48 CMS Fuels Shop Rolling Cabinets
Solicitation # FA558726Q0045
Solicitation FA558726Q0045 is a firm-fixed-price requirement for the Department of Defense to procure and install a complete mobile shelving system for the 48th Component Maintenance Squadron Fuel Systems Section at RAF Lakenheath. The system is designed to provide centralized, secure storage for specialized tools, alternate mission equipment, and personal protective equipment to support F-15 and F-35 maintenance operations. Key technical requirements include tool pass-through capabilities, integrated toolbox drawer options, and strict compliance with AFI 21-101 standards. The contractor is responsible for delivery and installation by certified engineers, with shipping terms set as FOB Contractor Destination. The procurement is conducted under FAR Part 12 for commercial items, with a NAICS code of 337215. Due to the overseas location, no set-aside is applied. Award will be based on the most advantageous offer, considering both price and technical capability, with a preference for prices that are fair, reasonable, and realistic. Offerors must maintain an active SAM registration and provide a CAGE or NCA/GE code. Submissions must include a price quotation on the provided quote sheet and a technical document not exceeding ten pages. Following an amendment, the final response deadline is September 14, 2026. Payment will be processed electronically through the Wide Area Workflow system.
Showcase, Partition, Shelving, and Locker Manufacturing

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS