Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trimax Upgrade

Closed
FA930226Q0110Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 14 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
Provision of Consulting Services for Regional Basement Flooding Mitigation Program Strategic Plan
Solicitation # P-1353-26
The Region of Halton is soliciting proposals for a consulting firm to conduct a comprehensive review of its existing Basement Flooding Mitigation Program and develop a three-year Strategic Plan. The primary objectives are to reduce basement flooding risks, enhance wastewater system resilience, and decrease wet-weather flows. The project is expected to be completed within nine months of kick-off and includes key deliverables such as a current-state assessment report, a prioritization framework for initiatives, a final strategic plan with an implementation roadmap, and a performance measurement and reporting framework. The selected consultant must provide a Project Manager with PMP certification or equivalent credentials. The contract will be awarded based on a scoring system where the technical proposal accounts for 80 points and the cost proposal accounts for 20 points. Proponents must achieve a minimum technical score of 70% to be considered for award and may be invited to a 30-minute presentation. Mandatory submission requirements include a technical proposal, a signed Vendor Code of Conduct Acknowledgement Form, and a cost proposal submitted via the online bidding system by November 12, 2026. The agreement is governed by a modified Standard Agreement and Supplementary Conditions, requiring the consultant to maintain specific insurance coverages: 5 million dollars for Commercial General Liability, 2 million dollars for Automobile Liability, and 2 million dollars for Professional Liability. Additionally, the consultant must provide a WSIB clearance certificate upon award and with every monthly electronic invoice. All produced materials remain the sole property of the Region of Halton, and deliverables must comply with the Ontario Building Code and the Accessibility for Ontarians with Disabilities Act.
Region of Halton

POSTED

about 16 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
SLED
REQUEST FOR PROPOSAL (RFP) STAR Centre Energy Modernization Project Energy Audit
Solicitation # BPM059233
The City of Havre de Grace is seeking proposals for a comprehensive energy audit of the STAR Centre, the city's largest public building, as the first phase of an Energy Modernization effort. This grant-funded project, supported by the Maryland Energy Administration Local Government Energy Modernization Program Grant 52-600796, requires a contractor to perform an ASHRAE Level 1 walkthrough Energy Audit. The scope includes documenting baseline operating conditions, analyzing utility billing data, evaluating eligibility for utility rebates, and providing a detailed report of energy efficiency measures for lighting, HVAC, and building envelope weatherization. Additionally, the contractor must develop a Monitoring Based Commissioning Plan (MBCx) to support future energy management and continuous performance monitoring. The contract will be awarded based on the best value to the city, considering the technical approach, cost factor, and the bidder's experience. Eligible offerors must be established businesses with at least five years of industry experience and must be in good standing with the State of Maryland, Harford County, and the City of Havre de Grace. Required submission documents include a Maryland Business License, a Certificate of Good Standing, an IRS W-9, and evidence of insurance covering General Liability, Workers' Compensation, and Errors and Omissions. Proposals must be submitted electronically via Beacon Bid by November 23, 2026. The selected vendor must be able to complete the audit and deliverables within a 60-day period, with a final project completion deadline of February 5, 2027. Payment will be made upon the successful completion of services, with the possibility of progress payments based on a satisfactory schedule.
City of Havre de Grace

POSTED

about 16 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

AFTC/PZZG intends to enter into a sole source contract with Trimax Systems, LLC for engineering and system integration services to modernize the Electrical, Gas, and Water control infrastructure at Building 1030, Edwards Air Force Base. The project involves PLC logic development, HMI/SCADA configuration, hardware installation, and comprehensive testing and commissioning. The scope specifically requires the contractor to manage system engineering, panel assembly, on-site implementation, and a seamless system cut-over to ensure continuous utility support. All work must adhere to current Risk Management Framework guidelines for cybersecurity and compliance. Trimax Systems, LLC has been identified as the only responsible source because the existing system relies on their proprietary PLC and HMI source code. Previous market research involving five other vendors determined they were technically unacceptable, as they lack the legal access to the proprietary code required to perform upgrades without a total, costly system replacement. Utilizing an alternative vendor would result in approximately $500,000 in duplicative costs and cause mission-critical delays of six to eight months. This acquisition is not set aside for small businesses, and the estimated period of performance is 30 days with delivery at Building 1030, Edwards Air Force Base. Proposals must be submitted no later than 12 PM PDT on 24 August 2026.

General Info

Sole source contract for Trimax Systems to modernize utility infrastructure at Edwards Air Force Base.

NAICS

541330 - Engineering Services

Place of Performance

Edwards, CA, 93524, USA

Set-Aside

NONE

Documents

5

B1030 Trimax EGW Controls SOW - 9 Jul 2026

PDF, High priority: read this firstsow
High

FA930226Q0110 - Trimax Upgrade Combined Solicitation & Notice of Intent

PDF, High priority: read this firstrfq
High

FA930226Q0110 - Trimax Upgrade EGW Control System

PDF, High priority: read this firstrfp
High

Service Contract Act Wage Determination 2015-5603

PDF, High priority: read this firstwage-determination
High

Determination & Findings - Trimax Upgrade

PDF, Low prioritydetermination-and-findings
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9302 Aftc Pzz
Contacts2 people available
OfficeEDWARDS AFB, CA, 93524-1185, USA
Office AddressEDWARDS AFB, CA, 93524-1185, USA
Contacts
Carmen Barahona
Karla Vazquez

Full Description

Show more

Combined Solicitation & Notice of Intent (SOLE SOURCE)


This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with RFO Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate, written solicitation will not be issued [RFO12.202(b)(1)]


(i) AFTC/PZZG intends to negotiate on a Sole Source basis with Trimax Systems, LLC for engineering and system integration services to modernize B1030’s Electrical, Gas, and Water (EGW) control infrastructure. The existing EGW control system at Building 1030 was originally engineered and programmed by Trimax and relies entirely on their proprietary Programmable Logic Controller (PLC) and Human-Machine Interface (HMI) source code.


Solicitation number FA930226Q0110 is issued as a request for quotation (RFQ).


This acquisition is not set aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.


(ii) SCOPE OF WORK:


  • System Engineering and Programming
    • PLC Logic Development: The contractor shall engineer and program the Programmable Logic Controllers (PLCs) to accurately control the designated facility equipment (e.g., pumps, valves, and generators) in accordance with the approved sequence of operations.
    • HMI/SCADA Configuration: The contractor shall develop and deploy the Human- Machine Interface (HMI) screens. The graphical interface must provide operators with real-time equipment status, historical data trending, and immediate visual/audible alarming for critical system faults.
    • Cybersecurity & Compliance: All software configurations and network integration shall adhere to current Risk Management Framework (RMF) guidelines. The contractor must ensure that default passwords are changed, unnecessary ports are disabled, and role-based access controls are implemented.
  • Installation and Hardware Integration
    • Panel Assembly: The contractor shall assemble, wire, and label all internal components of the control panels prior to site delivery. All wiring must be clearly labeled and correspond directly to the provided schematic drawings.
    • On-Site Implementation: The contractor shall physically install the upgraded components, terminate field wiring, and establish network connectivity without causing uncoordinated disruptions to ongoing facility operations.

  • Testing and Commissioning
    • Site Acceptance Testing (SAT): Following installation, the contractor shall conduct a comprehensive SAT alongside government representatives. This includes point-to-point loop checks, verification of all automated sequences, and simulated fault testing to ensure alarms trigger correctly.
    • System Cut-Over: The contractor shall manage the transition from the legacy system to the new system, ensuring continuous utility support during the cut-over phase

(iii) See attached redacted Sole Source Justification that supports only one source is available to provide these services.


(iv) FOB Destination, Building 1030, Edwards Air Force Base (EAFB). PoP is estimated at 30 days.


(v) See attached SF1449 for a list of solicitation provisions that apply to the acquisition.


(vi) See attached SF1449 for a list of contract clauses that apply to this acquisition.


(vii) If you have any questions, please contact Contract Specialist, Carmen Barahona at carmen.barahona@us.af.mil, or Contracting Officer Karla Vazquez at karla_lizette.vazquez_montes@us.af.mil.


Response times. This letter does not constitute a change order, nor does it grant permission to begin work on the proposed requirements. It is requested that your proposal be submitted as soon as practical, but no later than 12PM PDT on 24 August 2026 to allow for analysis and processing.



NOTICE OF INTENT TO SOLE SOURCE


Justification


Trimax Systems, LLC is the only responsible source capable of fulfilling the 772nd Test Squadron's (772TS/EWOX) requirement because the existing Electrical, Gas, and Water (EGW) control system at Building 1030, Edwards Air Force Base (EAFB), was originally engineered and programmed by Trimax and relies entirely on their proprietary Programmable Logic Controller (PLC) and Human-Machine Interface (HMI) source code. Although the Government received interest from five vendors during the sources sought phase, they were determined technically unacceptable because they do not possess, and cannot legally obtain, the proprietary Trimax PLC/HMI source code required to perform the upgrades without a total system replacement. Utilizing an alternate vendor would require a complete, ground-up reverse-engineering of the entire utility control network, resulting in a duplication of costs up to $500,000 that the Government is not expected to recover through competition. Additionally, this would cause an unacceptable mission delay due to prolonged facility utility shutdowns of 6 to 8 months required to engineer, install, test, and deploy a new system.



Trimax retains proprietary rights and interests in this customized software, programming, configurations, engineering methods, and related intellectual property, except to the extent that specific rights may have been expressly conveyed under an applicable contract or other written agreement. The underlying PLC and HMI manufacturers' software, development environments, firmware, and other third-party components remain subject to the respective manufacturers' intellectual property rights and license terms.



The existing control system incorporates Trimax-developed application code and configurations as well as third-party software and development tools that may be subject to manufacturer licensing requirements. Modification by a third-party integrator would therefore require appropriate software licenses, authorized development tools, access credentials, source files, technical knowledge of the existing Trimax implementation, and explicit authorization to use or modify Trimax proprietary intellectual property.



In addition, modifications to the existing PLC and HMI applications by parties other than Trimax may affect system functionality, operability, cybersecurity, safety, reliability, future support, and Trimax's ability to warrant or assume responsibility for the performance of the modified system.



Therefore, to preserve the system's technical integrity, avoid unnecessary and non-recoverable Government expenditures, and prevent critical mission downtime, Trimax Systems, LLC is the only source that can perform these integration services.



Scope of Work


See attached SOW or Section (ii) above.



Market Research


Contracting posted a Sources Sought on SAM.gov from 13 July 2026 through 16 July 2026 and received 5 timely responses. The responses were sent to Mission Partner but deemed technically unacceptable because they do not possess, and cannot legally obtain, the proprietary Trimax PLC/HMI source code required to perform the upgrades without a total system replacement. Lastly, Contracting obtained documentation from Trimax confirming the proprietary nature of their Programmable Logic Controller (PLC) and Human-Machine Interface (HMI) source code.



Instructions to Interested Parties


This notice of intent is not a request for competitive proposals; however, all responsible sources may submit a capability statement, proposal, or quotation which shall be considered by the agency. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government.


Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.

More opportunities from Department Of Defense → FA9302 Aftc Pzz

Same awarding agency

NAICS: 334220
Federal
URC-300 VHF/UHF Transceiver Assembly and Remote Control Unit (RCU)
Solicitation # ACQ-26-H096
The Department of the Air Force, through the Air Force Test Center (AFTC/PZZF) at Edwards AFB, intends to award a sole-source, Firm-Fixed-Price purchase order to ACG Systems, Inc. under solicitation ACQ-26-H096. This procurement is for one URC-300 VHF/UHF Transceiver Assembly and ten associated auxiliary components, including a Remote Control Unit (RCU), mounting brackets, antennas, and cabling. The equipment is required to expand the capabilities of the Mobile Telemetry Van supporting the B-52 Commercial Engine Replacement Program (CERP) and must integrate with the proprietary CM-350 V2 control protocols. The government has determined that ACG Systems, Inc. is the only responsible source capable of satisfying the requirement because they are the original equipment manufacturer and the hardware must meet mandatory military TEMPEST and EMI shielding standards for classified and unclassified operations. Utilizing non-ACG hardware would result in significant duplication of costs and cause a critical six-to-nine-month delay due to mandatory recertification, which would threaten B-52 engine replacement timelines and operational readiness targets. The award is based on the vendor's unique technical compatibility and the determination that the pricing is fair and reasonable based on historical data from previous contract FA9302-22-F-G596.
Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing

POSTED

about 2 months ago

DEADLINE

in almost 2 years
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS