This Solicitation opportunity from Texas was posted on August 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Trinity River Authority of Texas Denton Creek Regional Wastewater System Treatment Plant Expansion to 24.4 MGD Drum Screen Preselection
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the design, fabrication, assembly, shipment, installation support, testing, training, startup, and warranty of a Drum Screening system intended for fine screening and post coarse screening to safeguard the downstream membrane bioreactor (MBR) at the Denton Creek Regional Wastewater System. The equipment and related systems, including instrumentation and ancillary components, are to be designed, integrated, and supplied as a unified, fully operational system by a single Original Equipment Manufacturer (OEM). Additionally, the contractor will provide design support services during the development phase of the Treatment Plant Expansion project to assist the Engineer in preparing for the bid process. The overall project, which will be competitively bid by general contractors in 2026, includes the requirements specified in the preselection package, with the understanding that the final pricing will be determined at the bid award stage. The solicitation, issued by the Trinity River Authority of Texas, specifies a project value ranging from five to fifteen million dollars and is targeted at a NAICS code related to industrial process machinery. The response deadline was August 1, 2025, with the project posted on August 30, 2025. The primary point of contact for inquiries is Hayden DeLay, reachable via email or phone. The project aims to ensure a cohesive and functional screening system that supports the overall expansion of the wastewater treatment capacity to 24.4 million gallons per day, emphasizing integrated design, manufacturing, and support services to meet the Authority’s operational requirements.
General Info
Agency
Place of Performance
TX, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Design, fabrication, assembly, shipment, installation support, testing, training, startup and warranty of a Drum Screening system, to be used as fine screening, post coarse screening, to protect the integrity of the downstream membrane bioreactor (MBR) system at the Denton Creek Regional Wastewater System. The equipment, material, ancillary systems, instrumentation, analyzers and services specified shall be designed, integrated and provided as a cohesive and fully functional system by a single Original Equipment Manufacturer (OEM). Provide design support services to Engineer during the design development phase of the TRA DCRWS Treatment Plant Expansion to 24.4 MGD project for the Owner to bid the project. All requirements of this Preselection Package to be performed by the System Supplier will be included as part of an overall construction project to be competitively bid by general contractors in (2026). The Authority acknowledges that the pricing data provided by Proposers are estimates, and that final pricing will be determined in the bid award to a general contractor.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
