Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

TTM 17847 Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The TTM 17847 Project in Orange, California, entails the demolition of existing structures and the construction of 30 single-family homes, accompanied by an internal street and sidewalk network, an equestrian trail along the northern and western property boundaries, landscaping, open guest parking, common open space, and a retaining wall. The project is governed by a detailed construction schedule spanning from July 6, 2026, to October 2, 2027, with distinct phases including demolition, site preparation, grading, utility installation, building construction, paving, and architectural coatings. Work must adhere to the City of Orange’s Manual of Grading and Standard Plans and Specifications, geotechnical reports, erosion control plans, and floodplain management standards, with inspections and approvals overseen by the City’s Public Works Department and Water Division. Compliance with ASTM standards for soil compaction, expansion index, and sulfate content, as well as City Water Division Standard No. 113 for utilities, is mandatory, alongside implementation of the Water Quality Management Plan requiring inspection records to be maintained for five years. The contractor is responsible for all construction activities, while the project owner, Milan REI X, LLC, must submit an annual self-certification by June 30 each year to confirm ongoing maintenance of best management practices, certified by a licensed professional engineer. Performance is tied to compliance with municipal engineering codes, CPTED principles for security, wildfire risk mitigation, and access control requirements, including provision of keys to the Water Division. No formal solicitation or contract number is provided; the document is classified as a forecast with no identified federal acquisition regulation clauses, accounting data, invoicing methods, or contract type beyond the forecast designation. The estimated contract value, derived from partial cost entries, is approximately $4,076, though this figure is incomplete and not corroborated by a full pricing schedule. Point of contact for the City of Orange is Senior Planner Monique Schwartz, while Diane Scioli of Milan REI X, LLC serves as Construction Manager and certifying signatory for environmental obligations. Final acceptance requires recordation of the tract map, issuance of a certificate of occupancy, and formal approval by municipal authorities.

General Info

Demolish existing structures, build thirty single-family homes with trails, landscaping, parking, and retaining wall in Orange, CA.

Agency

California → City of Orange

NAICS

236117 - New Housing For-Sale BuildersView NAICS

Place of Performance

East Santiago Canyon Road and North Nicky Way, Orange, CA, 92869

Set-Aside

NONE

Documents

(14)

DTSC Comments on Mitigated Negative Declaration for TTM 17847 Project

PDFcomment-letter

Notice of Completion for TTM 17847 Project

PDFnotice-of-completion

City of Orange Notice of Intent to Adopt Initial Study/Mitigated Negative Declaration 25-0033

PDFspecial-notice

Appendix G - Noise Supporting Information for Orange Residential Project 6224.0003

PDFsupporting-document

Shortened Review Request Form for TTM 17847 Project

PDFshortened-review-request

Summary Form for TTM 17847 Project Environmental Impact

PDFenvironmental-summary

TTM 17847 Initial Study/Mitigated Negative Declaration

PDFinitial-study

Appendix H - Transportation Supporting Information for Arena Site Residential Project

PDFsupporting-document

Appendix D - Preliminary Geotechnical Subsurface Evaluation for Arena Site Residential Development

PDFsow

Appendix C - Cultural Resources Supporting Information for TTM 17847 Project

PDFsupporting-document

Appendix B - Special Status Species Database Search Results

PDFsupporting-document

Appendix F - Hydrology and Water Quality Supporting Information for Tract 17847

PDFwater-quality-management-plan

Appendix A - Air Quality, Energy, and GHG Emissions Supporting Information for Orange Arena Project

PDFsupporting-document

Appendix E - Phase I ESA COMBINED

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Orange
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Orange
Office AddressN/A
Contacts
Monique SchwartzSenior Planner
Diane ScioliConstruction Manager
Cecilia SoAssociate Director

Interested Companies (1)

Show more
FirstCarbon Solutions
Irvine, California

Full Description

Show more
The proposed project would include the demolition of all existing on-site structures and construction of 30 single-family homes. The proposed project would also include an internal street and sidewalk network, an equestrian trail along the northern and western project site boundaries, landscaping, open guest parking, common open space, and a retaining wall.

Similar Contracts

Same NAICS industry code

NAICS: 236117
SLED
9001-9019 Long Beach Boulevard Habitat for Humanity Project
Solicitation # PL26-0191
The project involves the demolition of all existing structures on the site at 9001–9019 Long Beach Boulevard in South Gate, California, followed by the construction of a common interest subdivision featuring 14 attached townhomes across four buildings, totaling 18,656 square feet of building area with a combined footprint of 9,772 square feet. The development will include two- and three-story units designed for affordable housing, with common areas such as guest parking, outdoor seating, and community green space, alongside perimeter and interior landscaping. A Tentative Tract Map has been prepared to facilitate the subdivision and sale of individual units. The project is managed by the City of South Gate, with primary point of contact Joshua Valdez, Associate Planner, and Audrey DeVoe of Habitat for Humanity LA as a key stakeholder. The NAICS code 236117 indicates this is a residential construction project, and the performance location is clearly defined as South Gate, CA 90280. Although the contract is listed as a forecast with no solicitation number or formal award details, the timeline anticipates grading from mid-July to early September 2026 and building construction from mid-July 2026 through late 2027. Environmental compliance is guided by California’s CALGreen Code, Title 24 Energy Standards, SB 100, and the Marine Life Protection Act, with Phase I Environmental Site Assessments following ASTM E1527-13 standards. Sample handling and preservation protocols for environmental testing are strict, requiring proper labeling, chain-of-custody documentation, and temperature control for microbiological samples. The estimated contract value of $192,000 is derived from environmental sampling segments, though the clarity of line-item classification remains uncertain. No formal evaluation factors, payment details, contracting officer designations, or clause implementations such as FAR provisions are fully articulated, and while certain clause indicators like AB14-5 and RB13-1 are marked as included or varied, their exact content and regulatory applicability are unspecified. All submissions must be made through the EPIC-LA portal, but no official deadline or formal contract type has been confirmed.
City of South Gate

POSTED

12 days ago

DEADLINE

N/A
View Details