Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on July 16, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Two Floating Docks for BSU Portsmouth

Awarded
HSCG27-10-Q-PCT160Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

Request for Quotation HSCG27-10-Q-PCT160 is a total small business set-aside for a fixed-price contract to provide all materials, equipment, and shipping for the construction of two floating docks at the USCG Base Support Unit in Portsmouth, Virginia. The contractor is responsible for supplying modular, UV-resistant, and recyclable polyethylene dock sections with integrated ballast and fender systems, along with 316 stainless steel or galvanized hardware, mooring cleats, and specific pile guides for Dock A and Dock B. While the contractor provides the materials and assembly instructions, the USCG Base Portsmouth labor force will handle the actual assembly and installation. Quotes are due by June 29, 2010, at 4:00 PM EST and must be submitted via email or fax. Successful bidders must be registered in the Central Contractor Registration database. Work must commence within five days of the notice to proceed and be completed within ten working days of the contract award. The contractor must provide a minimum one-year warranty on all materials and adhere to strict base security and safety regulations, including providing a detailed employee list for security clearance five days prior to starting work.

General Info

Contract Value

$40,779

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

VA, USA

Set-Aside

NONE

Awardee

ERA MARINE

Award Issued Date

Documents

2

RFQ HSCG27-10-Q-PCT160 - Floating Docks for USCG BSU Portsmouth

PDF, High priority: read this firstrfq
High

Scope of Work & Drawing (RFQ HSCG27-10-Q-PCT160)

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → LOG-9
Contacts1 person available
OfficeNORFOLK, VA, 23510, USA
Office AddressNORFOLK, VA, 23510, USA
Contacts
Christina M. GrimsteadContract Specialist

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. A) The Request for Quotation (RFQ) number is HSCG27-10-Q-PCT160. This combined synopsis/solicitation constitutes a Request for Quotation and incorporates the provisions and clauses in effect through the Federal Acquisition Circular 2005-41. B) This is Total Small Business Set Aside. The applicable NAICS code is 237990 and the small business size standard is $33.5. This requirement is for a fixed price contract. C) QUOTE DUE DATE: Quotes are due No Later Than June 29, 2010 at 04:00 PM, EST. All responsible sources may submit a quotation, which if timely received, shall be considered by this agency. D) SEND QUOTES TO: E-Mail to contact@example.gov or Fax to +1 (555) 000-0000. E) TECHNICAL POC: Please contract Mr. Randy Peters at +1 (555) 000-0000 regarding technical questions or to arrange a site visit. F) CCR: Interested parties must be registered in the Central Contractor Registration (CCR) database and must have an active and complete registration status prior to award, during performance and through final payment. Lack of active and complete registration in the CCR database will make a contractor ineligible for award. Contractors may obtain information on registration via the Internet at www.ccr.gov or by calling +1 (555) 000-0000. G) FOB DESTINATION: Place of Delivery/Acceptance is USCG BSU Portsmouth, 4000 Coast Guard Blvd, Portsmouth, VA 23703. The contractor shall commence work NLT five (5) days after notice to proceed and complete the entire work ready for use by ten (10) working days after contract award. H) SCOPE OF WORK (SOW and Drawing will be included as an attachment) GENERAL REQUIREMENTS: The work consists of providing all materials, equipment and shipping only as required to construct two (2) Floating Docks located at US COAST GUARD BASE SUPPORT UNIT, 4000 COAST GUARD BLVD PORTSMOUTH, VA 23703. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT five (5) days after notice to proceed and work diligently to complete the entire work ready for use by ten (10) working days after contract award. SCOPE OF WORK: Provide all materials, special tools/tool kits and shipping costs to construct two floating docks (Dock A & Dock B) as described in attached drawing. The docks will be assembled and installed by USCG Base Portsmouth labor force. The following specifications for all floating dock materials and associated equipment applies to both docks: a). Dock material must be made in the USA, 100 percent recyclable, contain UV inhibitors, resistant to acid, petroleum products, and made of Polyethylene (MDPE) or equivalent. b.) Dock sections must be of modular design and light weight (less than 35lbs. per module) for ease of installation and recovery as may be needed. c.) Dock section/module must contain an integrated ballast system allowing installer control of the freeboard and draft as needed for each dock site. d). Dock system must have an integrated fender system made of similar material and high impact resistant or equivalent attached or installable on the mooring side of both docks. Dock A will require seventy-six (76) feet six (6) inches and dock B will require forty-three (43) feet six (6) inches of fender material. e). All dock installation and accessory hardware must be constructed of 316 stainless steel or mild steel hot dipped galvanized including nuts, bolts, washers, pile guides, etc. f). Dock system must include ten (10) mooring cleats that are integrated and installable as needed on mooring side of dock. g). Dock system must include six (6) 8-inch pile guides for Dock A and four (4) 10-inch pile guides and three (3) 8-inch pile guides for Dock B. h.) Provide assembly instructions for modular dock sections and all associated equipment including pile guides, mooring cleats, fender system. i.) Provide a minimum 1 year warranty on all material against defects and performance. j.) Dock modules must have a non-slip surface for safe footing. SITE VISIT: All bidders are strongly encouraged to visit the site to field verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with Randy Peters at +1 (555) 000-0000. DESIGNATED CONTRACTING OFFICER'S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer's QAE representative and Point of Contact for this project is Randy Peters at +1 (555) 000-0000. Inquiries concerning any phase of the specification before or after award shall be made to Randy Peters. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve offerors from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer's QAE representative of his/her intended start date. The work shall be done in accordance with the specification. ORAL MODIFICATION: No oral statement by any person, other than the Contracting Officer, shall in any manner or degree, modify or otherwise affect the terms of this contract. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station's regular hours, he may submit his request in writing to the Contracting Officer's QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee's full name, date and place of birth, current address and last four (4) of SSN. The USCG BASE SUPPORT UNIT PORTSMOUTH Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor's name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair. SAFETY REQUIREMENTS: The contractor shall conform to all state and local safety requirements and those of Coast Guard BASE SUPPORT UNIT PORTSMOUTH. The contractor and his employees shall become familiar with and obey all base regulations including fire, traffic, and security regulations. There will be no smoking in Coast Guard Buildings. No underage visitors authorized onsite. Employees and suppliers only, no dependants, minors or anyone else not directly associated with the ongoing work. No pets or animals of any kind allowed on worksite. The exception being service animals for the visually or hearing impaired. Documentation will be required for the animal to remain on site. I) QUOTES SHOULD INCLUDE THE FOLLOWING: (1) The Solicitation (RFQ) number; (2) The time specified in the solicitation for receipt of offers; (3) The name, address, and telephone number of the offeror; (4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the RFQ. This may include product literature, or other documents, if necessary; (5) Terms of any express warranty; (6) Price, availability and any discount terms; (7) "Remit to" address, if different than mailing address; (8) A completed copy of the Representations and Certifications at FAR 52.212-3 (see FAR 52.212-3(j) for those Representations and Certifications that the offeror shall complete electronically); (9) Acknowledgment of Solicitation Amendments; (10) Past performance information, when included as an evaluation factor below, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); (11) If the offer is not submitted on the SF-1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration; (12) Company Tax Information Number (TIN) and DUNS Number. J) FAR CLAUSES/ PROVISIONS: The following FAR provisions/clauses apply to this solicitation. Offerors may obtain full text versions of these clauses/provisions electronically at https://www.acquisition.gov/far/. FAR 52.212-1 Instructions to Offerors-Commercial Items (Jun 2008). FAR 52.212-2 Evaluation-Commercial Items (Jan 1999) is incorporated and the evaluation criteria will be pricing and delivery. FAR 52.212-3 Offeror Representations and Certifications-Commercial Items (Aug 2009) / Alternate 1 (Apr 2002); must be completed and included with your offer. FAR 52.212-4 Contract Terms and Conditions-Commercial Items (Mar 2009). FAR 52.212-5 Contract Terms and Conditions Required to Implement Statues or Executive Orders - Commercial Items (Apr 2010). The following clauses listed in FAR 52.212-5 (b) and (c) are incorporated: FAR 52.219-6 Notice of Total Small Business Set-Aside (Jun 2003); FAR 52.219-28 Post Award Small Business Program Representation (Apr 2009); FAR 52.222-3 Convict Labor (Jun 2003); FAR 52.222-19 Child Labor - Cooperation with Authorities and Remedies (Aug 2009); FAR 52.222-21 Prohibition of Segregated Facilities (Feb 1999); FAR 52.222-26 Equal Opportunity (Mar 2007); FAR 52.222-36 Affirmative Action for Workers with Disabilities (Jun 1998); FAR 52.223-15 Energy Efficiency in Energy Consuming Products (Dec 2007); FAR 52.225-1 Buy American Act - Supplies (Feb 2009); FAR 52.225-3 Buy American Act-Free Trade Agreements-Israeli Trade Act (Jun 2009); FAR 52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008); FAR 52.232-33 Payments by Electronic Funds Transfer Central Contractor Registration (Oct 2003).

More opportunities from Department Of Homeland Security → LOG-9

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS