This Solicitation opportunity from Department Of Defense was posted on August 9, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TYAD UTILITIES

Closed
W912BU23R0026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 10 hours ago

DEADLINE

in 20 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Tobyhanna, PA, 18466, USA

Set-Aside

NONE

Documents

8

Amendment 0003 to Solicitation W912BU23R0026

PDF, High priority: read this firstamendment
High

NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0)

PDF, High priority: read this first6 pages · past-performance
High

RFP W912BU23R0026 - Phased Modernization Utilities for Water, Wastewater and Stormwater Systems

PDF, High priority: read this firstrfp
High

Solicitation W912BU23R0026 Amendment 0001

PDF, High priority: read this firstamendment
High

Solicitation W912BU23R0026 - TYAD Utilities

PDF, High priority: read this firstrfp
High

Tobyhanna Army Depot Storm Drainage Calculations - Appendix D

PDF, High priority: read this firstspecifications
High

TYAD Utilities RFI Tracker (28JUN23)

XLSX, High priority: read this firstq-and-a
High

W912BU23R0026 Amendment 0002

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline time changed from 9:00 PM UTC to 10:00 PM UTC on Jul 10, 2023. The notice description changed. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jul 10, 2023 to Aug 9, 2023.

Notice updated

Response deadline time changed from 9:00 PM UTC to 6:00 PM UTC on Aug 9, 2023. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Philadelphia
Contacts2 people available
OfficePHILADELPHIA, PA, 19103-0000, USA
Office AddressPHILADELPHIA, PA, 19103-0000, USA

Full Description

Show more
Amendment 003 cancels the Solicitation, W912BU23R0026, in its entirety. SOLICITATION #: W912BU23R0026 ? TYAD Utilities The scope of work for this project at Tobyhanna Army Depot is to replace the existing sanitary, water and storm systems and repave existing roadways as shown in the design plans and according to the project breakout and phasing as demonstrated in the Design Analysis Report. The new storm system and roadways will only be installed in the Army Depot secured Industrial Area generally defined as the area within First Street to Sixth Street and Gibbs Street to Myer Street and including Electronics Drive. The existing sanitary sewer mains will be removed and replaced generally in place with new PVC mains, and existing manholes will be replaced with precast concrete manholes. Sanitary sewer service lines to adjacent buildings will be replaced to within 5 feet of the building and new cleanouts will be installed. Some existing sanitary manholes and mains will be abandoned in place and filled with flowable fill as depicted in the design plans. The existing water mains, valves and fire hydrants will be replaced generally, in place with new ductile iron mains, valves and fire hydrants and protective bollards. Water and fire connections to the mains will be re-connected to the new mains as depicted in the design plans. Some existing water mains will be abandoned in place and filled with flowable fill as depicted in the design plans. Install new air vacuum valves and vaults as shown in the design plans. Portions of the existing storm system within the Industrial Area will be replaced and supplemented with new RCP pipe and precast concrete inlets. Portions of the existing storm system mains to the outfalls will be lined as depicted in the design plans. Connections to the storm sewer mains from building downspouts will be provided as depicted in the design plans. The paving of the main roadway network within the Industrial Area will be replaced with new paving to enable more efficient and sufficient drainage of storm runoff. Affected sidewalks will be replaced and parking areas will be milled and overlaid as shown in the design plans. New striping for travel way lines, parking areas and crosswalks will be replaced in kind or as otherwise shown on the design plans. Location The work is located at the Tobyhanna Army Depot, Tobyhanna, PA, approximately as indicated. The exact location will be shown by the Government Designated Representative (GDR).OCCUPANCY OF PREMISES Building(s) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area. Ensure there is always proper means of access and egress to/from the building safely through the work site if necessary, in clearly marked and protected pathways. Any building entrance closures must be approved by the GDR. Before work is started, arrange with the GDR a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. EXISTING WORK In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements :a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the GDR. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. c. Remove all temporary construction access/egress elements and return the any alteration made during the construction period to and acceptable finished quality level. LOCATION OF UNDERGROUND UTILITIES Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities. Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work. Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made. Instructions to Offerors (ITO)The US Army Corps of Engineers, Philadelphia District wishes to place a Firm Fixed Price (FFP) Contract for W912BU-23-R-0026 TYAD Utilities. The attached PWS/SOW describes this effort. THIS ITO IS NOT AN AUTHORIZATION TO START WORK.1. Please adhere to the following timelines :If you choose to submit a proposal, it shall be submitted as follows by 10July 2023 by 0500 PM EST :Proposals shall be submitted electronically as specified herein. Mailed in or hand carried proposals will not be considered. All proposals shall be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) website athttps://piee.eb.mil/. Offerors files are limited to 1.9 GB per file, however there is no limit on the number of files that can be uploaded. If an Offeror attempts to transmit a large number of files, recommend that combining or ZIP files before uploading to the PIEE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission. It is Offerors? responsibility to check with PIEE to ensure successful submission. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided. All offerors must request TDY Utilities Plans via email from Deah Gerard-May at deah.l.gerard-may@usace.army.mil . Accordingly, the Philadelphia District will NOT accept proposals by mail, hand-carry, or commercial courier (that is, no physical proposals will be accepted in response to this solicitation). All proposals must be submitted by electronic commerce only (that is, by submission through PIEE, as discussed below).The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided. Electronic Proposal Submission in PIEE: In accordance with FAR 15.203(c), electronic commerce may be used to issue Request for Proposals (RFPs) and to receive proposals, modifications, and revisions when contracting by negotiation. Proposals will be submitted through PIEE (https://piee.eb.mil/) All proposals must be uploaded into PIEE infrastructure not later than the RFP due date stated in Block 13 of the SF1442 or per any subsequent solicitation amendments. Training material and guides for registering and submitting proposals can be found below and is provided to assist in locating the full scope of resources available on the PIEE website:? PIEE Solicitation Module Vendor Access Instructions :https://dodprocurementtoolbox.com/cms/sites/default/files/resources/2021-08/PIEE%20Solicitation%20Module%20Vendor%20Access%20Instructions_0.pdf? For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.? Additional training and PIEE Solicitation Module resources can be found on the PIEE website at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtmlThere are two vendor roles (Proposal Manager and Proposal View Only) for the PIEE Solicitation Module. The Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module. Additionally, please be advised that when using the PIEE Solicitation Module, the user?s e-mail address in PIEE must match the e-mail address on file in SAM.gov. OFFERORS ARE STRONGLY ENCOURAGED TO AVOID WAITING UNTIL THELAST MINUTE TO ATTEMPT TO TRANSMIT THEIR PROPOSALS. TECHNICALISSUES WITH UPLOAD MAY RENDER YOUR PROPOSAL TO BE LATE. Receipt of Submissions For the purposes of establishing whether a proposal submission is considered timely, the Government considers the date and time the submission is completely uploaded in the PIEE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases. The electronic proposal submittal contents shall conform to the details of the solicitation and subsequent amendments. Each volume of the proposal shall be submitted electronically as detailed above. The Government intends for PIEE to serve as the primary means for submitting the proposals. Accordingly, proposals received by email, modifications thereto, or cancellations of proposals will not be accepted unless the Offeror sends an email containing the required proposal documents along with an explanation as to why the proposal was not submitted via PIEE. Emails are to be sent to the Contract Specialist and the Contracting Officer and must be received by the Government electronic infrastructure prior to the exact time set for receipt of proposals. The Offeror will be solely responsible for ensuring that the email and the proposal in its entirety are received timely. The emailed version will then serve as the Offeror?s official submission. Late proposals will be handled in accordance with FAR 15.208.2. Instructions:1. Offers, consisting of Cost/Price as well as Technical and Past Performance information, shall be submitted. Offerors are permitted to provide ONLYONE Offer for consideration; if more than ONE offer is received, the offerors responses may be determined unacceptable and will not be evaluated or considered for award. Alternate quotes that are received as the result of a revised understanding of the requirement as the result of a site visit may be accepted at the proposal submission date. The alternate proposal however is limited to ONE. There is a 75-pagelimitation for the proposal(not including the schedule). Offerors are required to satisfy all requirements of the PWS/SOW that is attached.2. As seen below, Volume II shall be the completed Excel workbook entitled ?Electronic Bid Form TYAD Utilities.xlsx.? The SF1449 along with Representations and Certifications, and any amendment(s) must be Submitted/acknowledged as part of Volume II. Volume II- Cost/PriceThe Summary Workbook shall consist of a breakdown of the following worksheets (as detailed below). Attached is the format for the Summary Workbook entitled ?Electronic Bid Form TYAD Utilities Cost-Price.xlsx.?a. Summaryi. The Offeror shall submit a Microsoft Excel file (workbook- entitled ?Electronic Bid Form TYAD Utilities. xlsx?) that calculates and includes the formulas necessary to develop a summary worksheet (single tab within workbook) which provides the summary of total cost/price for the entire Summary of work. Offeror may also fill out bid schedule on SF1449at the time of submission. b. Worksheet for the Summary of Work i. Each worksheet shall have a summary by cost element. Contractors are required to complete each tab of the worksheet for TYAD Utilities ii. Offerors shall propose any costs associated with Contractor Manpower Reporting, as a separate cost on your summary, or specifically state that this is not separately priced in the pricing methodology (separate worksheet if necessary).Volume I- Past Performance, Management and Small Business Participation Plan Factors Please see Section M below for detailed information on evaluation of Management, Past Performance, Small Business Participation Plan andPrice.1. The contractor shall provide a narrative which addresses all subfactors (A, B, C, D and E) under Volume 1.Offerors will submit separate CPARS report or past performance questionnaires for up to three (3) similar projects completed within the last 5 years as a prime or subcontractor for Factor 1. One such project should total $20M or more and the other 2should total $10M or more. Notes for Volume I and II: This is a Firm Fixed Price Contract type and price must be submitted in accordance with the worksheet provided. Offers submitted by email shall have a subject line in the following format: ?Solicitation Number-Proposal-Contractor Name? (example W912BU-23-R-0026-RFP -Acme Company), failure to submit emails in this format may result in your offer no longer being considered for award. Offers submitted via email as attachments shall be submitted in Adobe Acrobat for Volume I and Excel format for Volume II. There is a 75-page limitation on the entire proposal submission(excluding the schedule).3. IMPORTANT NOTES: This Contract is governed, insofar as applicable, by the procedures set forth in FAR 15.3 Source Selection. FAR 15 (Contracting by Negotiation) procedures shall not apply to this task order, either directly or by analogy, except to the extent required by FAR15.3. FAR and FAR 15.101-1. 15.101-1 (Tradeoff Source Selection Process) will apply to this contract. Submission of a proposal in response to this RFP constitutes the offerors express acknowledgment to that effect. All other procedures are at the sole discretion of the Government as set forth in this RFP. The Government intends to evaluate proposals and award a FFP contract to the offeror that provides the best value to the Government.4. Additional Information4. Additional Information: Please email any questions including technical questions you may have regarding this effort to deah.l.gerard-may@usace.army.mil andcherita.l.williams@usace.army.mil, and the Contracting Officer will coordinate a response. DISCUSSIONSThe PCO may conduct discussions with each offeror for clarification purposes, after the evaluation team has conducted their reviews. However, it should be noted that the PCO reserves the right to award without discussions. If discussions re conducted, after the conclusion of said discussions, any new information received from the offerors will be evaluated. This evaluation will be documented in a supplement to the Initial Evaluation Report (Interim Evaluation Report)and will consist of an update, which addresses each factor and subfactor of the Initial Evaluation Report SITE VISITA site visit is scheduled for Tuesday, June 20th, 2023 at 0900 EST at TDY Army Depot in Tobyhanna, PA. All interested parties must notify Joseph Durkin at joseph.a.durkin@usace.army.mil by 14 June 2023 of said interest as well as complete applicable documentation to be provided by said POC. RFIs All RFIs are to be submitted within 7 calendar days of the Site Visit.

More opportunities from Department Of Defense → W2SD Endist Philadelphia

Same awarding agency

NAICS: 541330
New
Federal
INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT FOR INLAND AND COASTAL VESSELS ENGINEERING SERVICES, NAVAL ARCHITECTURE, AND MARINE ENGINEERING
Solicitation # W912BU26RA036
The Army Corps of Engineers Marine Design Center is soliciting proposals for a small business set-aside Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide naval architecture and marine engineering design services for inland and coastal vessels. This contract, identified as W912BU26RA036, has a total capacity of $20,000,000 over a five-year ordering period estimated to run from Quarter 2 of FY27 through Quarter 3 of FY32. The scope of work includes feasibility studies, stability analyses, and design services for a variety of propelled and non-propelled vessels up to 150 feet in length, such as push boats, tugs, high-speed craft, and vessels with robotics systems. Task orders will be issued as firm fixed price, with an estimated average value of $500,000 and a maximum of $2,000,000. Selection will be based on demonstrated competence and qualifications via the SF 330 form, with a primary focus on specialized experience in inland and coastal vessels, professional qualifications, and the capacity to perform up to $4 million in work annually. Key requirements include compliance with DFARS 252.204-7019 regarding NIST SP 800-171 assessments and adherence to ANSI drawing standards. Proposals must be submitted as searchable PDF files by November 6, 2026, at 12:00 P.M. ET. Evaluation will prioritize recent project experience within the last ten years, with additional consideration given to projects completed within the last five years.
Engineering Services

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
Federal
Detection Sciences Testing and Applied Research (DSTAR)
Solicitation # W912BU26TDSTR
The U.S. Army Corps of Engineers, Philadelphia District, is conducting market research and an Industry Day for the Detection Sciences Testing and Applied Research (DSTAR) Project in Egg Harbor Township, New Jersey. Located within the federally secured FAA William J. Hughes Technical Center and the NJ Pinelands reserve, the project involves the design-build construction of a 40,000 square foot Detection Sciences Testing and Applied Research Center (DSTARC) and a 6,000 square foot Facility for Energetic Materials Research (FEMR). The estimated project magnitude is between 25 million and 75 million dollars, with an anticipated solicitation date in July 2027. The facilities will support the Department of Homeland Security's Transportation Security Laboratory in detecting and mitigating threats from improvised explosive devices. Key technical requirements include the construction of blast-hardened laboratories, with the FEMR capable of withstanding detonations up to two kilograms of explosives and other areas up to five grams. The DSTARC will serve as the campus IT hub and must support the exchange of Top-Secret/Sensitive Compartmented Information (TS/SCI) and include SCIF areas. Specialized infrastructure requirements include independent HVAC systems for the Chemistry Complex meeting ASHRAE 55 standards, enhanced energy performance commissioning, and strict adherence to NJDEP and Pinelands stormwater regulations. The government intends to use a best-value tradeoff process for award, prioritizing contractors with experience in MILCON projects exceeding 50 million dollars, active Secret clearances, and the ability to comply with the Buy American Act for specialized laboratory equipment.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 22 days
View Details
NAICS: 323113
New
Federal
W912BU26QA035 - Responder Uniform 5 year IDC 2026-2031
Solicitation # W912BU26QA035
Solicitation W912BU26QA035 is a request for quotations from the U.S. Army Corps of Engineers, Philadelphia District, to establish a five-year Firm-Fixed Price, Indefinite Delivery Contract for high-quality safety uniforms and screen-printing services. This small business set-aside procurement supports first responders within the Emergency Management Association and includes twelve distinct clothing items, such as Old Glory Red rain gear, insulated jackets, performance polos, and Class 3 safety vests, all featuring specific USACE agency branding and safety markings. The contract period of performance runs from January 6, 2026, through November 5, 2031, with a minimum guarantee of 500 dollars and a delivery point of destination in Philadelphia, Pennsylvania. Award will be based on best value, considering both price reasonableness and a critical pass/fail evaluation of twelve required clothing samples. These samples are assessed for compliance with strict technical specifications regarding design, color, materials, and workmanship. The solicitation has been amended to extend the response deadline to November 9, 2026, to allow vendors adequate time to submit quotes and samples, while the window for RFI questions closed on October 7, 2026. Contractors must adhere to rigorous packaging standards, including specific poly-bagging and corrugated carton requirements, and comply with various Federal Acquisition Regulation clauses, including Buy American and sustainable products certifications.
Commercial Screen Printing

POSTED

5 days ago

DEADLINE

in 20 days
View Details
NAICS: 237130
New
Federal
Power Construction and Services II (PCS II) MATOC
Solicitation # W912BU26RA032
The US Army Corps of Engineers, Philadelphia District, is soliciting proposals for the Power Construction and Services II (PCS II) Multiple Award Task Order Contract (MATOC). This firm-fixed-price Indefinite Delivery/Indefinite Quantity (IDIQ) contract is designed to provide power construction and services in contingency or austere environments. The scope of work supports the United States Government, Coalition Forces, and Host-Nation organizations within the United States Central Command (CENTCOM) and select United States European Command (EUCOM) countries, including Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. The government intends to award between three and seven contracts with a total shared capacity of 249,000,000 dollars. Each award will have a five-year term with a six-month option. The contract encompasses both construction and services for low, medium, and high voltage electrical power systems, with an estimated workload distribution of 60 percent services and 40 percent construction. Proposals are evaluated based on technical approach to sample task orders, past performance regarding recency, relevancy, and quality, and a fair and reasonable price determination. Submissions must be made electronically via the PIEE Solicitation Module by November 3, 2026, at 4:30 P.M. ET. Key requirements include compliance with Host Nation regulations in Turkey, Romania, and Poland, as well as adherence to NFPA 70 and IEEE C2 electrical standards. Performance and payment bonds are required for construction task orders exceeding 150,000 dollars.
Power and Communication Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 14 days
View Details
NAICS: 237110
Federal
Fort Mifflin Sewage Lift Station
Solicitation # W912BU26BA028
Solicitation W912BU26BA028 is a firm fixed-price construction contract issued by the U.S. Army Corps of Engineers, Philadelphia District, for the Fort Mifflin Sewage Lift Station Replacement project in Philadelphia, Pennsylvania. The scope of work involves the removal and decommissioning of the existing sewage lift station, which must be permanently abandoned, filled, and restored for parking lot use, and the construction of a new sewage lift station at a relocated site. The project is a total small business set-aside under NAICS code 237110, with an estimated contract value between $250,000 and $500,000 and a performance period of 90 calendar days. The contract will be awarded to the lowest priced responsive and responsible bidder. Bidders must submit their offers electronically via the Procurement Integrated Enterprise Environment (PIEE) suite in Adobe PDF format. Required submissions include the SF1442, a bid schedule, acknowledged amendments, and a bid guarantee of at least 20 percent of the bid price. Awarded contractors must provide performance and payment bonds equal to 100 percent of the contract price within 10 calendar days. Key requirements include the provision of qualified personnel, such as a Project Engineer and Quality Control Manager, adherence to Davis-Bacon Act certified payrolls, and compliance with Buy American requirements for construction materials.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 1 day
View Details
NAICS: 336611
Federal
3389 Large Class Hopper Dredge (LCHD-ESS)
Solicitation # W912BU26RA031
Solicitation W912BU26RA031 is a request for proposals for the design, construction, testing, and delivery of one Large Class Hopper Dredge (LCHD-ESS) to replace the aging Dredge ESSAYONS for the U.S. Army Corps of Engineers, Portland District. The vessel will support missions across Washington, Oregon, California, Alaska, and Hawaii. Key technical specifications include a 6,500 cubic yard hopper capacity, diesel-electric power, azimuthing thruster propulsion, and a loaded draft of 26 feet or less. The vessel must be Jones Act compliant, meet PANAMAX beam requirements, and adhere to ABS classing. Delivery is FOB destination at U.S. Moorings in Portland, Oregon, with a total period of performance of 1,675 calendar days divided into four phases: Planning and Scheduling, Engineering, Construct and Test, and Sea Trials and Delivery. The government will award a fixed-price commercial supply contract with economic price adjustment based on best overall value. Evaluation factors include Technical Approach, Past Performance, Small Business Participation, and Price, with the combined non-price factors weighted approximately equal to price. Proposals must be submitted electronically via the PIEE Solicitation Module by April 15, 2027. Requirements include a bid guarantee, as well as performance and payment bonds equal to 5% of the original contract price. Additionally, the contractor must maintain CMMC Level 2 (Self) cybersecurity status for systems processing federal contract information. To encourage competition, the government has included a stipend provision of up to $1.5 million for eligible unsuccessful offerors.
Ship Building and Repairing

POSTED

14 days ago

DEADLINE

in 6 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS