Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Homeland Security was posted on October 2, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

U.S. Coast Guard - Base Kodiak, AK / Design-Build Construction Services.

Closed
HSCG87-15-R-PJT002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

USCG BASE KODIAK, KODIAK, AK, 99619, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → LOG-9
Contacts1 person available
OfficeNORFOLK, VA, 23510, USA
Office AddressNORFOLK, VA, 23510, USA
Contacts
LeRoy W. RushingContracting Officer

Full Description

Show more
This Sources Sought and is not a request for proposals nor does it constitute a statement of a current government requirement. The anticipated procurement is for a Design-Build Construction Contract that will provide for the Repair and Alteration of a waterline and the demolition and replacement of a bridge located at USCG Base Kodiak, AK. This construction effort is anticipated to be a small business set-aside, but all interested parties are encouraged to submit capability statements. It is anticipated that this acquisition will result in one (1) firm fixed price contract. The anticipated magnitude of the awarded contract is between $5,000,000.00 and $10,000,000.00. The projected contract's period of performance is estimated to be 730 calendar days. The successful offeror will be required to provide all labor, material, supplies, transportation, supervision, and all other necessary items to demolish an existing waterline and bridge and construct a new replacement for this infrastructure as a Design-Build delivery method in accordance with Government provided construction documents and specifications. The project includes design and construction of all site improvements and infrastructure required to replace approximately 9,000 LF of waterline from the Water Treatment Plant to a point immediately downstream of the Buskin River waterline bridge crossing. The Buskin River waterline bridge crossing will be replaced and demolition of an abandoned bridge crossing over the Buskin River. Project Background: Base Kodiak operates and maintains a Public Domestic Water System regulated by the State of Alaska. The Buskin River waterline and the bridge for the waterline crossing the Buskin River were built in the late 1950's by the US Navy. This section of waterline (approximately 8,400 LF of buried 16" ductile iron) and the Buskin River Bridge crossing (steel construction) are the critical components supporting the entire public water distribution system for Base Kodiak. Segregation and management of the water distribution system is problematic. The bridge is not built to seismic standards and structural components are significantly deteriorated. In addition, due to the bridge's low elevation at the river crossing, the bridge and the main distribution waterline attached to the bridge are subject to potential damage from Buskin River flooding events, ice jams and debris from high water events. The age of the pipeline and its critical nature make this a high priority project. Base Kodiak has only 1 to 2 days of water storage downstream of this waterline/bridge infrastructure. In the event of failure, on-island resources do not exist for emergency repairs to this system. Any failure would result in an extended outage, severely impacting operations at Base Kodiak, including quality of life for 406 family housing units. Due to the highly regulated nature of public water systems, construction and maintenance activities require careful coordination, planning, and design. The Annual Water Quality Report 2012 indicates that Base Kodiak's water is in compliance with all of the drinking-water standards; however, vulnerability was assessed as a risk due to potential infiltration of contaminants into the water stream. There are two known contaminated sites located near the project alignment. The Buskin River Bridge #2 presents a public safety threat and has been condemned and is currently scheduled for demolition. The Buskin River Bridge No. 2 was built in 1950 and is approximately 178 feet long and 20 feet wide and is supported approximately 18 feet above the Buskin River. The bridge is constructed of wood decking and rails and is supported with steel beams. It has a total of 10 spans of steel beams and a wooden bulkhead on each side. This bridge is located at latitude 57.7559 north, longitude 152.5017 west and is located adjacent to the Kodiak Airport on an abandoned portion of the Chiniak Highway to the north side of the end of Runway 11. The bridge steel support beams also cause the buildup of debris in the Buskin River. Desired capabilities and qualifications include; - Expertise in Design-Build construction related services. - Experience working in remote locations with harsh seasonal weather conditions. - Evidence demonstrating ability to work on projects of similar size, scope, magnitude, and complexity as the work described above. - Bonding capability up to $7,000,000.00. Interested contractors should respond by registering on the Interested Vendor List for this procurement. This notice is issued for the purpose of market research in accordance with FAR Part 10. All written responses must include a written narrative of capability, including technical information demonstrating the ability to meet the above requirements. The written narrative shall provide evidence of experience of at least 3 projects as a Prime contractor, similar in type and scope, substantially completed within the last 5 years; to include: project description, location, and cost, points of contact and telephone numbers/email addresses. Please also provide if your business currently participates in an existing multiple award contract, or other contract vehicle with the Federal government which could potentially satisfy the requirement, please describe the contract vehicle, and points of contact in your response. The responses must be sufficient to permit agency analysis to establish a bona-fide capability to meet the requirement. Responses are limited to no more than 10 pages. Cover sheets, organization charts, and business size/classification documentation are excluded from the page count. Please provide in your response the firm's business size and classification. A positive statement of the firm's intent to submit a proposal for the anticipated contract solicitation as a prime contractor is requested. Affirmative written responses must be received no later than 15 days after the publication of this notice. All questions regarding this notification shall be submitted in writing to Mr. LeRoy (Roy) Rushing via email at Leroy.w.rushing@uscg.mil. This is not a request for proposals.

More opportunities from Department Of Homeland Security → LOG-9

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS