Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

UC Berkeley California Memorial Stadium Lighting Retrofit Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

2227 Piedmont Avenue, Berkeley, CA, 94720

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyUniversity of California, Berkeley
Contacts1 person available
OfficeN/A

Full Description

Show more
UC Berkeley proposes a lighting retrofit project that will replace the existing high intensity discharge (HID) lighting fixtures and controls within California Memorial Stadium with new energy efficient light emitting diode (LED) light fixtures (see Figure 1 for location map). The existing lighting cabinets will also be replaced. The project would replace all of the existing 1500 and 2000 watt HID fixtures with 1500 watt LED fixtures. The four existing light poles on the east side of the stadium will be used for new LED light fixtures. As part of the upgrade, the existing HID fixtures above the press box will be removed. Because the new LED fixtures and entertainment components require additional horizontal mounting space, 12 mounting structures will be installed 7 feet above the press box roofline to accommodate the equipment. This project will also include color-changing fixtures to support game day and entertainment features. The existing static HID lighting system allows for three lighting levels. The new lighting system would allow for multiple lighting levels and colors, with the ability to change colors and levels of individual lights, enabling the ability to create light shows. While new lights will also be physically fixed in their mounting positions and pole locations and would have variable (adjustable and controllable) operational performance, lights (and lasers) would always be directed onto the field and not the night sky. The proposed project would involve no expansion of use of existing facilities and would not result in additional use of the stadium or stadium lights, although the new lighting system has the functionality to create light shows that could be employed during existing football games. Among other benefits, the LED lights provide dimming capabilities that will allow the university to reduce the lighting power during evening use when the lights are typically on. Overall, the proposed project would increase the foot candles (the amount of light or brightness of light on the field) by almost 20 percent and provide better uniformity in field coverage over the existing system. However, while the new lighting system is designed to provide improved illumination on the playing surface, the new fixtures are also designed to minimize unwanted light spill and glare in surrounding areas. Modeling for the new lighting system shows that the foot candle measurements at the property line would result in a similar or reduced light impact on surrounding areas in comparison to the existing system. The updated system will also reduce overall energy consumption by an estimated 30 percent as compared with the existing lighting system

More opportunities from University of California, Berkeley

Same awarding agency

NAICS: 238220
New
SLED
RSF Weight Rooms Supplemental Cooling
Solicitation # 16397A
The University of California, Berkeley is soliciting sealed bids for a lump-sum contract to install supplemental cooling systems at the Recreational Sports Facility in Berkeley, California. The base scope of work includes the installation of four 5-ton heat pump systems, each consisting of one heat pump located in the garage and two 2.5-ton fan coils, along with the necessary refrigerant piping and condensate drains. The project also includes two bid alternates: the installation of four large fans in the weight rooms (Alternate 1) and four large fans in the aerobics and martial arts rooms (Alternate 2). The estimated construction cost for the project is $200,000. To be eligible for award, bidders must hold a current California B General Contractor license and be registered with the Department of Industrial Relations. Bidders are required to submit a Special Statement of Experience on company letterhead documenting three to five comparable split system installation projects completed as a prime contractor within the last five years, each with a value of $200,000 or more and located within the nine Bay Area counties. All personnel on site must be paid at least the UC Fair Wage of $15 per hour and prevailing wages. Bids must be submitted via BuildingConnected by December 18, 2026, at 1:00 PM, with the original bid bond delivered to Capital Projects within two business days of the deadline.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS