Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

UC Davis Sacramento Campus Long Range Development Plan Update

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of California
Contacts1 person available
OfficeN/A
Organization / Agency
University of California
Office AddressN/A
Contacts
Brian HarringtonDirector of Physical and Environmental Planning

Full Description

Show more
Nonstructural Performance Category -5 (NPC-5) represents the highest level of nonstructural seismic compliance, requiring that all critical systems and utilities needed for patient care and safety remain operational after a major earthquake. This includes external connections to public utilities and verification of system operability under post-earthquake conditions. Pursuant to the California Environmental Quality Act (CEQA), an Addendum to the 2020 LRDP Update Supplemental EIR (2020 LRDP EIR) has been prepared for NPC Emergency Water Storage Project which evaluated both projects in one document. The Nonstructural Performance Category Emergency Water Compliance – Acute Care Buildings project includes critical infrastructure necessary to construct underground tanks to store the required emergency potable water for hospital services and industrial water for a wastewater storage system. Project scope includes installation of underground water tanks, a wastewater storage system and associated required bracing and anchorage. The Nonstructural Performance Category Emergency Water Compliance – None-Acute Care Buildings project consists of critical infrastructure modifications in non-acute care buildings required to ensure patient care is not impacted in the event of a natural disaster. Project scope includes the installation of isolation valves to decouple water lines and reconstruction/reinstatement of approximately 150 lineal feet of water pipe to connect Well #1 to the existing Central Plant.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves constructing 16,435 linear feet of new 20-inch ductile iron force main and performing extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include the installation of new gravity sewers, manholes, stormwater facilities, and site grading. The contract is a small business set-aside open to various SBA certifications, including VOSB, SDVOSB, WOSB, and HUBZone. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation focusing on qualifications, financial ability, and the submission of required MWBE documentation. Performance begins upon a Notice to Proceed, which is typically issued within 30 to 60 days of the bid opening. The contractor is required to provide performance and payment bonds, adhere to National Electric Code and NEMA standards, and ensure all materials are delivered and stored according to strict manufacturer and safety specifications. Payment is processed via applications for payment reviewed by the Engineer and is due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS