Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Utah was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UDOT Intersection Improvements

Closed
UDOT270040CN -State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation is seeking a subcontractor for a fixed-price, single lump sum project to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. The scope of work includes the replacement of 62,500 square feet of asphalt across five specific areas, the repair of five storm sewer drain structures, and the patching of five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and will be evaluated based on overall best value. To be considered for award, bidders must conduct a mandatory physical site visit and submit a signed MTC Bid for Lump Sum Contract form along with a detailed cost breakout. For bids exceeding $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating the payment of prevailing wages and the submission of weekly certified payroll reports. Additionally, contractors must meet specific insurance minimums, including $1 million per occurrence for general liability and $500,000 for workers compensation. Final payment is contingent upon a successful final inspection, the completion of a punch list, and the submission of closeout documentation, including a release of liens and a final certified payroll report.
Joliet Job Corps

POSTED

about 14 hours ago

DEADLINE

in 13 days
NAICS: 237310
New
SLED
T32-D4-PavePres-Coffee-SR107-193681
Solicitation # 48400-eRFQ-002078-2027
The Georgia Department of Transportation is soliciting bids under solicitation number 48400-eRFQ-002078-2027 for Pavement Preservation and Maintenance Services. This procurement is conducted for services ancillary to the construction and maintenance of public roads in Georgia, specifically referencing project Coffee SR 107. The solicitation was posted on October 8, 2026, with a response deadline of November 4, 2026. Participation is strictly limited to Qualified Contractors who were deemed eligible during the prequalification process and possess a Master Service Agreement beginning with 48400-410-0000034480. All respondents are bound by the terms and conditions of MMSA 48400-410-0000034480 and RFQC 48400-410-0000033480. To be considered, bidders must submit a complete bid package signed by an authorized representative, a completed Tax Compliance Form, and a notarized Georgia Security and Immigration Compliance Act Affidavit. Bidders must also acknowledge strict communication restrictions regarding state staff, including the Commissioner, GDOT Board Members, and Legislators. Additionally, companies identified as scrutinized SUDAN companies are ineligible to bid unless a specific determination is made by the Department of Administrative Services. All submissions must be uploaded through the designated supplier attachment section of the procurement portal.
Department of Transportation

POSTED

about 15 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

Solicitation UDOT270040CN is an Invitation for Bid issued by the Utah Department of Transportation to secure a contract for intersection improvements at US 89 and 300 West in Lehi. The project scope includes micro surfacing, striping, pavement messages, and grinding and grooved in paint. The contract will be awarded to the lowest responsive and responsible bidder, with a substantial completion deadline of September 30, 2026. The procurement is managed by the UDOT Procurement Services Division and Region 4 in accordance with the State of Utah Procurement Code and Utah Administrative Code. Interested parties must submit all documentation and bids by the deadline of August 25, 2026, ensuring that the solicitation number is referenced on all correspondence to demonstrate compliance with the stated specifications.

General Info

UDOT seeks bids for US 89 and 300 West intersection improvements by August 2026.

Place of Performance

UT, USA

Set-Aside

NONE

Documents

5

Attachment B Scope of Work US-89 & 300 West Intersection Improvements Lehi

PDF, High priority: read this firstsow
High

Pln 23128 Attachment C Bid Schedule

PDF, High priority: read this firstbid-schedule
High

S-0089(653)352 - US-89 & 300 West Int Imp Plans

PDF, High priority: read this firstspecifications
High

State of Utah Agency Standard Terms and Conditions for Goods and Services

DOCX, High priority: read this firstcontract-document
High

Vendor Set Up Form and IRS Form W-9 2024-06-27

PDF, High priority: read this firstvendor-setup-form
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
Contacts
Your Name

Full Description

Show more
Invitation for Bid (IFB) UDOT- Intersection Improvements Solicitation # UDOT270040CN This Invitation for Bids "IFB" is issued in accordance with State of Utah Procurement Code and the Utah Administrative Code. If any provision of this IFB conflicts with the Utah Procurement Code or the Utah Administrative Code, then Utah Procurement Code and then Utah Administrative Code will take precedence.
The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide services to Improve the UDOT intersection located in Lehi on US 89 and 300 West. Work to include Micro Surfacing, Striping, pavement messages, grinding and grooved in paint. See plans and bid schedule for items of work and quanites. Substantial completion date of September 30 ,2026.
This contract may result in a single contract. Issuing Procurement Unit, Conducting Procurement Unit, and Solicitation Number
The UDOT Procurement Services Division is the issuing procurement unit and Region 4 is the conducting procurement unit for this IFB (referred to as “the State”). The reference number for this IFB is Solicitation #UDOT270040CN. This solicitation number must be referred to on all bids, correspondence, and documentation submitted to the State relating to this IFB.
The documents included within this solicitation are intended to provide interested bidders with sufficient information to enable the bidder to determine if they can provide as per the outlined requirements.
Bidders must provide sufficient documentation/information to demonstrate compliance with the stated specifications/requirements.

More opportunities from Utah

Same awarding agency

NAICS: 541330
New
SLED
26M: West Lake WWPS Replacement RFSQ
Solicitation # GHID2026M
The Granger-Hunter Improvement District is seeking Statements of Qualifications (SOQs) for engineering design and CM/GC preconstruction services to replace the West Lake Wastewater Pump Station in West Valley City, Utah. The project requires relocating the facility east of Bangerter Highway to accommodate a new UDOT overpass, with a planned capacity of approximately 212 GPM average flow and 276 GPM maximum flow. The selected consultant will be responsible for technical investigations, hydraulic evaluations, coordinating with UDOT and local utility owners, and recommending pump station configurations to ensure project completion by June 2028. Qualified firms must submit their SOQs electronically via the Utah Public Procurement Portal (U3P) by October 21, 2026, at 5:00 PM Mountain Time. Submissions must not exceed 15 pages and must not include fee proposals. Evaluation is based on firm information (15%) and key differentiators and schedule (15%), with the highest-ranked firm entering negotiations for a fair and reasonable contract. Minimum requirements include a Project Manager licensed as a Professional Engineer in Utah with experience in at least three similar pump station projects and one UDOT coordination/CM/GC project. Required insurance includes $2,000,000 per occurrence for Commercial General Liability and $5,000,000 for Professional Liability.
Engineering Services

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 811310
New
SLED
AM27-120 Elevator Maintenance Services Edge of the Cedars State Park Museum
Solicitation # AM27-120
The State of Utah Division of State Parks is seeking a single contract award for comprehensive quarterly maintenance and emergency services for two identical hydraulic passenger elevators located at the Edge of the Cedars State Park Museum in Blanding, Utah. This five-year contract will be awarded to the lowest cost responsive and responsible vendor, with a requirement that pricing be guaranteed for one year. The scope of work includes all management, labor, materials, and spare parts necessary for preventive maintenance, cleaning, and lubrication performed every March, June, September, and December. Additionally, the contractor must provide 24/7 emergency call back services with a maximum response time of three hours from the time of notice. All services must strictly adhere to Utah Administrative Code R616-3, ASME A17.1 / CSA B44, and ASME A17.3 safety codes, and the contractor is responsible for all inspections required to maintain a valid Operating Permit from the Utah Labor Commission. Key administrative requirements include providing 48 hours advance notice to the Park Manager for scheduled visits, maintaining an on-site Maintenance Control Program logbook, and submitting written service tickets after each visit. Invoices must be submitted within 30 days of service and will be paid within 30 days of receipt. Vendors must certify compliance with forced labor and restricted foreign entity regulations and maintain statutory workers compensation insurance.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 424490
New
SLED
RFSQ - Approved Vendor List for Fundraiser Vendors Pursuant to Utah Code 13-22
Solicitation # DH2720-AFV
The Salt Lake City School District (SLCSD) is seeking Statements of Qualifications (SOQ) to establish an approved vendor list for the provision of food items and other products used in school-sponsored fundraising activities. This procurement, conducted under solicitation number DH2720-AFV, is governed by the Utah Procurement Code and the Charitable Solicitations Act (Utah Code 13-22). Selected vendors will be placed on the approved list for a period of 18 months, during which schools may select them to provide products for resale. Vendors must specify a financial structure consisting of either a flat fee per item or a percentage of profits, with all proceeds benefiting the district. To be approved, vendors must pass a mandatory pass/fail screening and achieve a minimum score of 70 out of 100 points based on fundraiser details, qualifications, experience, references, and problem resolution. Mandatory requirements include a valid business license, a W9 form, and a State of Utah DOC Fundraiser Permit or equivalent exemption. Additionally, vendors must maintain commercial general liability insurance of at least 1 million dollars per occurrence and 3 million dollars aggregate, as well as statutory workers compensation. All responses must be submitted electronically via Bonfire/U3P by October 28, 2026, at 10:00 A.M. Failure to agree to student data privacy terms or the prohibition of harmful content will result in the rejection of the submission.
Other Grocery and Related Products Merchant Wholesalers

POSTED

1 day ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
SLCC STC Passenger Elevator Modernization RFP
Solicitation # SLCC2026-W1027
Salt Lake Community College is soliciting bids for the replacement of the South Retaining Wall at its Redwood Campus in Taylorsville, Utah, under solicitation number SLCC2026-W1027, with a response deadline of August 4, 2026. The work is governed by the DFCM General Conditions and supplemental documents, requiring full compliance with technical specifications, design drawings, and applicable Utah state laws including UCA 13-8-5 regarding retainage. Contractors must submit bids through the Utah Public Procurement Place (U3P) portal using accepted file formats, with no compressed or embedded files permitted. All proposals must include a bid bond of 5% using the AIA A310-2010 form and, if selected, performance and payment bonds each covering 100% of the contract value via AIA A312-2010 forms. The contract is subject to a 5% retainage on each progress payment, withheld until final acceptance by SLCC upon satisfactory completion and inspection of the work. Award will be made to the lowest responsive and responsible bidder, with price being the primary evaluation factor under a Lowest Price Technically Acceptable framework, though SLCC retains discretion to consider other factors in its best interest. Bidders must certify they are not debarred or suspended and must disclose any conflicts of interest with SLCC personnel. FOB Destination Freight Prepaid is the default delivery term unless a separate freight line item is provided, in which case FOB Origin Less Freight applies. Insurance requirements mandate SLCC be named as an additional insured on all policies, with carriers meeting A.M. Best rating standards. No accounting codes, COR/COTR details, or specific payment office information are provided, and no UEI, CAGE, or socioeconomic certifications are required. The contract prohibits assignment without written consent and mandates all modifications be issued as formal written addenda. Performance is expected to occur at the Redwood Campus location, with substantial completion tied to a defined contract time subject to liquidated damages for delays. Submission is limited to the U3P portal, and failure to meet all requirements may result in bid rejection.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS