Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UDOT RFP- UDOT Regional Welding and Fabrication Services

Closed
UDOT270026MPState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

about 22 hours ago

DEADLINE

in 22 days
NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids for the Corpyard Phase II project to structurally anchor 14 existing shipping containers at 4300 West Capitol Avenue. The scope of work requires a licensed contractor to provide all labor, materials, and specialized tooling to secure the containers to a cement-treated asphalt surface. Key technical requirements include drilling and hole cleaning, the installation of Bolthold asphalt substrate, securing ASTMA36 plates with epoxied steel rods, and performing AWS welding to the container framing. To prevent corrosion, all welded and anchored areas must receive a zinc-rich cold galvanizing rust-inhibiting coating. The project must be executed according to PSE stamped drawings and structural calculations, with final acceptance contingent upon inspection by the City's Building department and the project engineer. This solicitation, identified as ITB 26-091, has an estimated project value of 35,000 dollars. Bids must be submitted electronically via the OpenGov portal by November 10, 2026, with the contract award scheduled for December 2, 2026. The contract will be awarded to the lowest responsive and responsible bidder. Mandatory requirements include compliance with California prevailing wage laws, registration with the California State Department of Industrial Relations, and the provision of a 10 percent bid security. The successful contractor must also provide performance and payment bonds equal to 100 percent of the contract price and maintain comprehensive insurance coverage, including XCU hazards and general liability, naming the City as an additional insured.
Capital Projects - Construction

POSTED

1 day ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The Utah Department of Transportation is soliciting proposals for Regional Welding and Fabrication Services through RFP UDOT270026MP, with responses due by August 21, 2026. Contractors must adhere to UDOT’s specific standards and specifications, ensuring all work meets the department’s engineering and safety requirements. The solicitation is open to qualified firms seeking to enter into multiple contracts, meaning more than one vendor may be selected to provide services across various regions within Utah. All work under this contract will be performed within the state of Utah, and proposers are expected to demonstrate capability, experience, and compliance with UDOT protocols. Mark Parry at [email hidden] is the primary point of contact for inquiries, and all submissions must be made through the designated online portal by the deadline.

General Info

Utah DOT seeks qualified vendors for regional welding and fabrication services statewide by August 21, 2026.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

10

Attachment A - Utah Agency Standard Terms and Conditions

DOCX, High priority: read this first5 pages · standard-terms-and-conditions
High

AWS/ANSI D1.1/D1.1M:2020 Structural Welding Code Parameters

PDF, High priority: read this firstspecifications
High

Regional Welding and Fabrication Services Pricing Form

DOC, High priority: read this first1 page · pricing-form
High

RFP General Information - Utah Department of Transportation

DOC, High priority: read this first18 pages · rfp
High

Solicitation UDOT270026MP Proposal Evaluation Score Sheet

DOC, High priority: read this first2 pages · score-sheet
High

Submittal Form - Certifications Yes No

DOCX, High priority: read this first1 page · certifications-form
High

UDOT Welding and Fabrication Scope of Work

DOC, High priority: read this firstsow
High

Vendor Setup and IRS Form W-9

PDF, High priority: read this first7 pages · vendor-setup-form
High

Claim of Business Confidentiality Form

DOC, Low priority1 page · business-confidentiality-form
Low

State of Utah regions map

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
Contacts

Full Description

Show more
The Utah Department of Transportation, Procurement Services has issued this Request for Proposals (RFP) from qualified firms interested in providing enter into UDOT Regional Contracts to provide Welding and Fabrication Services.
Contractors must note that there are standards and specifications required by the Utah Department of Transportation that must be followed.
Contract Award: It is anticipated that this solicitation will result in MULTIPLE CONTRACT Awards.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS