Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Clark Public Utilities was posted on October 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UG Cable Replacement: SE Blairmont Dr & SE 152nd Ave

Closed
B704State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County for the demolition and waste removal of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and side wall walkways. Additionally, the contractor is responsible for removing above-grade utilities, capping or abandoning underground utilities, and clearing dumped materials and interior fencing at the neighboring Emory Grove Village parcel. The selected firm will be tasked with procuring all necessary Montgomery County demolition and raze permits, managing the removal of hazardous materials such as asbestos, and stabilizing the property according to the approved Sediment Control Plan. The contract features an initial performance period of four months from the Notice to Proceed. Proposals are due by October 30, 2026, via the OpenGov Procurement Portal and are evaluated based on schedule (20%), price (15%), and MFD participation. Key compliance requirements include adherence to Davis-Bacon and Maryland Prevailing Wage Laws, mandatory background screenings for all personnel, and participation in the HOC Works Program. Awardees must provide 100% payment and performance bonds, proof of insurance, and execute HUD certifications regarding debarment and suspension. HOC will retain 5% of payments until final acceptance, with liquidated damages of up to 1,000 dollars per day for incomplete work.
Real Estate

POSTED

about 5 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This contract involves a comprehensive underground utility project primarily focused on replacing failing underground electrical cables and associated infrastructure in the City of Vancouver, Washington. The scope includes boring or trenching approximately 6,300 feet within city rights-of-way and public utility easements to install multiple runs of 2-inch and 4-inch conduit, along with providing all necessary conduit, bore pipe, elbows, fittings, pull tape, and PVC cement. The work also encompasses installing approximately 15,400 feet of jacketed 1/0 aluminum primary conductors, installing two single-phase padmount transformers, one three-bushing single-phase transformer, and two three-phase junction boxes. Additionally, the project involves modifications at existing junction boxes and transformers, tree and bush removals, and other related tasks as detailed in the project summary. The project is governed by specific permits issued by the City of Vancouver, including a franchise utility-street/right of way permit that mandates compliance with city and WSDOT standards for trench restoration, traffic control, and site safety. The work is scheduled to be completed within a 90-day permit window, with detailed technical specifications provided for cable types, conduit sizes, and installation procedures. The solicitation, issued by Clark Public Utilities under solicitation number B704, targets prequalified contractors with a project value estimated between 500,000 and 1.5 million dollars. The bidding process includes a pre-bid meeting, bid submission instructions, and technical documentation to ensure adherence to safety, quality, and regulatory standards. Overall, this project aims to upgrade and replace critical underground electrical infrastructure to ensure reliable service and compliance with local standards.

General Info

Agency

Clark Public Utilities

Place of Performance

WA, USA

Set-Aside

NONE

Documents

6

Cable Table Technical Specifications

PDF, High priority: read this first2 pages · other
High

Clark Public Utilities Bid 704 UG Cable Replacement SE Blairmont Dr & SE 152nd Ave

PDF, High priority: read this first76 pages · ifb
High

City of Vancouver ROW Permit ROW-378314 for Underground Cable Replacement

PDF, Low priority9 pages · other
Low

City of Vancouver T05-05 Standard Trench Restoration

PDF, Low priority1 page · other
Low

Raise and Level J-Box #1335 at SE 157th Ave & SE 35th Street

PDF, Low priority1 page · other
Low

Work Request 5896641 Material List

PDF, Low prioritymaterial-list
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyClark Public Utilities
ContactsNo contacts available
OfficeN/A
Organization / Agency
Clark Public Utilities
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The project includes the following work: Boring ortrenching approximately 6,300 feet in City of Vancouver R/W and public utilityeasement and installing multiple runs of 2” and 4” conduit. Providing allconduit, bore pipe, elbows, fittings, pull tape and pvc cement. Installingapproximately 15,400 feet of jacketed 1/0 AL primary conductor, (2) single-phasepadmount transformers, (1) three bushing single-phase padmount transformer, (2)three-phase J-boxes, modifications at existing J-boxes and transformers, onetree and three bush removals, and other associated work as more fully describedin the Summary of Work.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS