Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Ulrich Stream Crossing Project (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-60170-R1C)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ulrich Stream Crossing Project, identified by Lake or Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-60170-R1C, is an agreement between the California Department of Fish and Wildlife and Frank Ulrich. Executed pursuant to Section 1602 of the Fish and Game Code, the project is located in Mendocino County within the Russian River watershed, approximately two miles north of Potter Valley. The work is specifically situated at Assessor's Parcel Number 173-130-04, with coordinates 39.3510 N and 123.1203 W. The scope of work is limited to a single encroachment to upgrade an existing stream crossing culvert. This process involves excavation, the removal of the old culvert, installation of a new properly sized culvert, backfilling, compaction of fill, and the application of rock armoring to prevent erosion. If stream conditions necessitate dewatering of the channel during construction, a formal dewatering plan must be provided. The project is granted a categorical exemption under Class 1 of the California Code of Regulations, title 14, section 15301, as it consists of a replacement without expansion of use. John Herrera, Senior Environmental Scientist Specialist, serves as the primary project contact.

General Info

CDFW and Frank Ulrich agree to upgrade a stream crossing culvert in Mendocino.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

Place of Performance

approximately two miles north of the town of Potter Valley, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
John HerreraSenior Environmental Scientist Specialist
Frank UlrichPlease contact John Herrera of CDFW

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-60170-R1C, pursuant to Section 1602 of the Fish and Game Code to Frank Ulrich. The Project is limited to one encroachment. The proposed encroachment is to upgrade an existing stream crossing culvert. Work for this encroachment will include excavation, removal of the existing culvert, replacement with new properly sized culvert, backfilling and compaction of fill, and rock armoring to minimize erosion. Dewatering of the channel may be necessary based on stream conditions at the time of construction and a dewatering plan shall be provided if necessary.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
BEJ Courtesy Dock Supply and Installation
Solicitation # W912PM26QA046
Solicitation W912PM26QA046 is a 100% small business set-aside request for quote issued by the U.S. Army Corps of Engineers, Wilmington District. The project requires the contractor to supply, deliver, and install a new courtesy dock at the Poe’s Ridge Boat Ramp at B. Everett Jordan Dam and Lake in Moncure, North Carolina. The contractor is responsible for all labor, supervision, equipment, and tools, while the government will remove the existing dock and gangway prior to the start of work. The performance period is 90 calendar days from the date of the Notice to Proceed. Technical specifications require the use of marine-grade aluminum alloy 6061-T6 or 5086-H116, Type 316 stainless steel hardware, and a minimum uniform live load capacity of 40 psf. All welding must conform to AWS D1.2 standards. Award will be made to the lowest priced technically acceptable offeror. To be considered, vendors must submit both a price quote and a technical proposal in Adobe PDF format. The technical proposal must include a General Contractor license, liability insurance, worker's compensation insurance, and a feasible installation plan detailing the schedule, methodology, and site safety protocols. Past performance will be evaluated on a pass/fail basis via CPARS. All work must comply with USACE Manual EM 385-1-1 safety requirements, including the submission of an Activity Hazard Analysis (AHA) and daily safety meetings. This contract is subject to the Davis-Bacon Act for prevailing wage rates in North Carolina. Proposals are due by October 9, 2026, at 8:00 PM UTC.
W074 Endist Wilmington

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
Federal
Y1PZ--Fort Sill NC Gravesite Expansion and FCA Deficiencies 920CM3006
Solicitation # 36C78626B0030
Solicitation 36C78626B0030 is a Firm-Fixed-Price construction contract issued by the Department of Veterans Affairs, National Cemetery Administration, for gravesite expansion and the repair of FCA deficiencies at Fort Sill National Cemetery in Elgin, Oklahoma. The project has an estimated magnitude between $10 million and $20 million and is 100% set aside for verified Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope of work includes the installation of approximately 3,500 pre-placed crypts, general construction, and an asphalt assessment. Additionally, the contract includes a bid option for the construction of Columbarium C. Technical requirements encompass a wide range of civil and architectural work, including stone veneer repair, electrical site upgrades, the installation of bronze seals and precast wall caps, and renovations to the Committal Shelter, Honor Guard room, and Administration Building. The performance period is 545 calendar days, or 18 months from the notice to proceed. Award will be based solely on price, evaluated by combining the base requirement with all options. The contractor must adhere to strict quality control standards, including a multi-stage inspection process consisting of punch-out, pre-final, and final acceptance inspections. Compliance with the Davis-Bacon Act and specific ASTM standards for material testing is required. Bidders must submit a single PDF package via the Vendor Portal, including a bid bond, SF 1442, and a detailed cost estimate worksheet. All painting materials and crypt units must meet specific packaging and labeling requirements to ensure quality and prevent damage during transport.
National Cemetery Administration (36C786)

POSTED

about 5 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
SLED
SLCC STC Passenger Elevator Modernization RFP
Solicitation # SLCC2026-W1027
Salt Lake Community College is soliciting bids for the replacement of the South Retaining Wall at its Redwood Campus in Taylorsville, Utah, under solicitation number SLCC2026-W1027, with a response deadline of August 4, 2026. The work is governed by the DFCM General Conditions and supplemental documents, requiring full compliance with technical specifications, design drawings, and applicable Utah state laws including UCA 13-8-5 regarding retainage. Contractors must submit bids through the Utah Public Procurement Place (U3P) portal using accepted file formats, with no compressed or embedded files permitted. All proposals must include a bid bond of 5% using the AIA A310-2010 form and, if selected, performance and payment bonds each covering 100% of the contract value via AIA A312-2010 forms. The contract is subject to a 5% retainage on each progress payment, withheld until final acceptance by SLCC upon satisfactory completion and inspection of the work. Award will be made to the lowest responsive and responsible bidder, with price being the primary evaluation factor under a Lowest Price Technically Acceptable framework, though SLCC retains discretion to consider other factors in its best interest. Bidders must certify they are not debarred or suspended and must disclose any conflicts of interest with SLCC personnel. FOB Destination Freight Prepaid is the default delivery term unless a separate freight line item is provided, in which case FOB Origin Less Freight applies. Insurance requirements mandate SLCC be named as an additional insured on all policies, with carriers meeting A.M. Best rating standards. No accounting codes, COR/COTR details, or specific payment office information are provided, and no UEI, CAGE, or socioeconomic certifications are required. The contract prohibits assignment without written consent and mandates all modifications be issued as formal written addenda. Performance is expected to occur at the Redwood Campus location, with substantial completion tied to a defined contract time subject to liquidated damages for delays. Submission is limited to the U3P portal, and failure to meet all requirements may result in bid rejection.
Utah

POSTED

about 21 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS