Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

UNION ASSEMBLY,TUBE

Active
N0010426QFF74Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract pertains to the procurement of a union assembly, tube, designated as SPECIAL EMPHASIS material (Level I) due to its critical role in a shipboard system where failure could result in catastrophic consequences including loss of life, vessel, or mission capability. All materials must strictly comply with MIL-P-24691 and associated specifications, including ASTM, SAE, ISO, and MIL-STD standards, with mandatory ultrasonic inspection performed in two circumferential directions and hydrostatic testing required—eddy current testing is not acceptable. Traceability is paramount: each item must bear permanent and temporary markings linked to heat-lot identifiers, and all certifications must directly correlate material to its test data without transcription or vague language. Certification documentation must be submitted via WAWF to Portsmouth Naval Shipyard prior to shipment, with specific DODAAC N50286 used for shipping and inspection, and approval must be received before any delivery. Materials must be inspected at 100% for traceability, certification completeness, and compliance with zero-defect acceptance criteria, and any deviation, waiver, or modification requires formal approval by the Contracting Officer through ECDS. The contractor must maintain an approved quality system per ISO-9001 with calibration compliance to ISO-10012 or ANSI-Z540.3, and must provide documented procedures for material control, subcontractor oversight, and government inspection access at any point in the supply chain. All raw and processed materials must remain segregated and traceable through every manufacturing and subcontracted step, including re-certification if properties are altered by fabrication. Chemical and mechanical certifications must be positive, unqualified, and issued by authorized personnel. The contract imposes restrictions on preservatives (varnish prohibited), mercury-free requirements, and labeling prohibitions except for fasteners. Delivery must occur within 365 days of contract effective date, with certification data submitted no later than 20 days prior to delivery and subject to a six-day review window. The order is rated DO under the Defense Priorities and Allocations System, issued under Emergency Acquisition Flexibilities, and qualifies as a total small business set-aside. All documentation, including drawings and technical data, must be accessed via SAM.gov and handled with strict confidentiality in accordance with DoD distribution statements, and any proprietary design must still fully conform to all contractual specifications regardless of contractor-imposed standards.

General Info

Procure MIL-P-24691 compliant union assembly with ultrasonic and hydrostatic testing, full traceability, zero defects, ISO-9001 quality system, and DODAAC N50286 shipping.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

332919 - Other Metal Valve and Pipe Fitting ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N743.49|WVP|771-229-0573|benjamin.t.spangler.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL BENJAMIN.T.SPANGLER.CIV@US.NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 5. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with DFARS 252.204-7024. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. 7. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=2621-021-01 |96169|AC| |D| | | | DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A530 | | |A |041001|A| | | DOCUMENT REF DATA=ASTM-B666 | | | |201101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=ASTM-A999 | | |A |040701|A| | | DOCUMENT REF DATA=SAE AMS 2806 | | |C |080301|A| | | DOCUMENT REF DATA=SAE AMS 2807 | | |A |000901|A| | | DOCUMENT REF DATA=SAE AMS 2809 | | |A |070801|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=SAE AMS-STD-185 | | | |000901|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-P-24691 | | | |910204|A|2 | | DOCUMENT REF DATA=MIL-P-24691 |0002| | |910204|A|1 | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | 3. REQUIREMENTS 3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the requirements as specified in MIL-P-24691, except as amplified or modified herein. MIL-P-24691 ordering data information is provided below: (a) Pipe and tube, carbon, alloy and stainless steel, seamless and welded; MIL-P-24691. (b) Pipe and tube, chromium-molybdenum steel, seamless, MIL-P-24691/2. (c) Type - Not applicable Grade - ;P11; (d) Fabrication by other than the electric furnace process is not applicable. (e) Tubing - Outside diameter - ;N/A; ; Wall thickness - ;N/A; Pipe - Nominal pipe size - ;1 Inch; ; Schedule - ;80; Length - Unless specific lengths are specified elsewhere in the Contract/Purchase Order, ;Single random lengths of 15 to 22 feet with five percent permissible 12 to 15 feet and five percent permissible 22 to 24 feet.; (f) Removed by Amendment 2 of MIL-P-24691. (g) An alternate soundness inspection is not required. (h) Ultrasonic inspection is required. (i) Shear wave test must be conducted in two opposite circumferential directions. (j) Level of preservation, packaging, and packing must be as specified elsewhere in the contract/purchase order. The use of Varnish as a preservative is prohibited. (k) Special marking is required and must be as specified elsewhere in the contract/purchase order. NOTE: MIL-P-24691/2 Conformance Requirements and Testing Sheet is available as CSD202 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/) 3.2 Bar, Pipe, and Tube Quantities - When this order results in supplying fewer than 5 pieces as defined in the "Length" paragraph above, all material must be from a single heat of material. 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing (if any) per applicable specifications is still required, but certifications are only required as listed below. Test - Quality Conformance/Compliance Inspection Item - ;Pipe; Performance - ;MIL-P-24691/2 (Table I Groups B and C, with Sampling per MIL-P-24691) NOTE: NDT Electric Test (Eddy current) is not an acceptable alternate for Hydrostatic Testing; Acceptance - ;MIL-P-24691 and MIL-P-24691/2; Test - Ultrasonic Inspection Item - ;Pipe; Performance - T9074-AS-GIB-010/271 and MIL-P-24691 Acceptance - MIL-P-24691 Attribute - Certificate of Compliance for seamless tubing/pipe Item - ;Pipe; Performance - Material supplied must be in the seamless condition. 3.4 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.5 Chemical and Mechanical Certification - Certification of chemical and mechanical properties must be in accordance with Data Item Description (DID) DI-MISC-81020 in lieu of DI-MISC-80678. 3.6 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.7 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government inelectronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.7.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to theoperational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.7.2 Requests for Waivers/Deviations for NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.7.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of theproduct. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineeringchange. 3.8 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.9 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.9.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.10 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.11 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.11.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.11.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the Contracting Officer or his authorized representative. 3.11.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.11.4 This contract provides for the performance of Government Quality Assurance at destination. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. 3.11.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO. 3.12 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.12.1 The supplier's gages, measuring and test equipment must be made available for use by the Government when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.12.2 All documents and reference data applicable to this contract must be available for review by the Government. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government. 3.13 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Prime Contractor who will notify the PCO so that appropriate planning for Government inspection can be accomplished. 3.13.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.13.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.13.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.13.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.13.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.14 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.14.1 Visual examination upon receipt to detect damage during transit. 3.14.2 Inspection for completeness and proper type. 3.14.3 Verification of material quality received. 3.14.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.14.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.14.6 Identification and protection from improper use or disposition. 3.14.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.14.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.14.9 Material returned to the contractor must be handled as GFM. 3.15 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.15.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in the contract/purchase order. 3.16 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17 Material Marking for Traceability and Identification - The following are the minimum marking requirements. In addition to the marking requirements on applicable specifications, marking for traceability is required. Pipe, Tube, and Metal Bar must have both permanent marking and temporary marking applied as specified below. 3.17.1 Permanent marking - Permanent traceability marking must be marked on each end of each pipe, tube, and metal bar. (MONEL and K-MONEL bar: 3/4 inch to 1 inch rods, and 7/8 inch hex bar may be marked on the surface near the end of bar/rod, and rod less than 3/4 inch and hex bar less than 7/8 inch may be bundled and tagged or boxed with the traceability marking on the tag or box.) All traceability marking must be permanently applied in accordance with MIL-STD-792. An alternate marking method is permissible provided it is an available option in the contractually invoked specification, except in instances where the material has been modified by this contract/purchase order, and differs from that specified in the specification. Electric arc marking or impression marking is strictly prohibited on thin wall tubing. (wall thickness of less than 0.125 inch). 3.17.2 Temporary Marking - Temporary Marking must consist of: Name or Trademark of Manufacturer, specification and grade (as applicable), size, contract number, and the traceability marking. Pipe and tube marking must also include SML (for seamless). Marking must be in accordance with the material specification and SAE-AMS-2806, SAE-AMS-2807, SAE-AMS-2809, Table I of SAE-AMS-STD-185, or ASTM-B666 as applicable. Application must be in accordance with MIL-STD-792, type A (temporary ink stenciling). An alternate method is permissible for MONEL and K-MONEL bar provided it is an available option (temporary marking only) in the applicable material specification, except that hot finished rod with rough ground surface 3/4 inch and under may be bundled and tagged or boxed with the traceability marking on the bag or box. Contamination levels for ink stenciling must be as outlined in paragraph 5.2 of MIL-STD-792. 3.18 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.18.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.18.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below. TRACEABILITY MARKING ________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER ______________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.18.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.18.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.18.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.19 Material Handling - The written material control process must include the following: 3.19.1 All raw materials must have traceability markings (except as specified below). 3.19.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.19.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.19.4 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.19.5 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.20 Receiving inspection - 3.20.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.20.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.21 Discrepancy reporting - 3.21.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government. 3.22 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.22.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.22.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.22.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.22.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.23 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to the Contractor - 4.1.1 The Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. The departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 The Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A record of these departures, traceable to the applicable part number and contract number must be submitted to the PCO. 4.1.3 The Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 The Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions, and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that he material supplied conforms to the specified requirements. 6.1.7 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks). Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order. 6.1.8 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated. 6.1.9 Verification - An examination performed to determine compliance with a specific requirement. 6.1.10 A nonconformance is defined as affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.11 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.12 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.13 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.14 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.15 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.16 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.17 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;10/20/2016 - Updated ECDS URL - Feb 09 2011 - Added the restriction of Varnish as a preservative. - Dec 17 2011 - Moved Quality Assurance Text location for Readability - Apr 15 2009 - Clarified the sample size for large and small lot sizes - Jan 19 2011 - Added notification of DCMA upon contract award - May 02 2009 - Added Lubricants and Sealants to the C of C - Aug 27 2014 - Took out contractor's phone number requirement - May 16 2013 - Removed GSI from this Material. - Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.; DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance.

Similar Contracts

Same NAICS industry code

NAICS: 332919
New
DIBBS
Supply of TEE, BOSS (NSN 4730-01-708-1342) Metal FittingThe contract entails the manufacture, packaging, and delivery of three military-specification fabricated metal fittings designated as TEE, BOSS with National Stock Number 4730-01-708-1342, produced to meet stringent defense standards including MIL-STD-129, ASTM D3951, and DLA packaging requirements. These components are critical for military logistics and must be fabricated with precision to ensure compatibility and durability under operational conditions. The work is being executed under a subcontract issued by the Defense Logistics Agency on behalf of the Department of Defense, with all items required to comply fully with federal packaging and labeling mandates to enable seamless integration into the military supply chain. The contract was posted on July 20, 2026, and falls under NAICS code 332919, which classifies it within the Other Fabricated Metal Product Manufacturing sector. While specific performance locations and point of contact details are not provided, the delivery and packaging must adhere strictly to DLA regulations to satisfy audit and inventory control protocols. The subcontract is managed through the DIBBS system with a reference ID of SPE7M426P4122, indicating its formal placement within the Department of Defense procurement framework. Compliance with all technical and procedural specifications is mandatory, as deviations could result in rejection of the units and disruption of critical supply operations.
Defense Logistics Agency

POSTED

about 15 hours ago

DEADLINE

N/A
View Details
NAICS: 332919
New
DIBBS
VALVE, FLOATThe contract specifies the procurement of a single float valve with NSN 4820016078750 and part number 207957-01D from Griswold Industries, to be delivered in one unit under FOB Destination terms with a 20-day delivery window from the as-directed order. All packaging and labeling must strictly comply with ASTM D3951 and MIL-STD-129, with the DLA Master List of Technical and Quality Requirements taking precedence over any conflicting standards; palletization must adhere to RP001 requirements, and each unit pack must be marked with the correct Unit of Issue and Quantity per Unit Pack as defined in the contract. The delivery destination is the USS ZUMWALT DDG 1000 at FPO AP 96693, and shipments must use traceable transportation methods with no parcel post allowed; all hazardous materials, including mercury or mercury-containing compounds, are prohibited except in specific exemptions such as functional mercury in batteries, fluorescent lights, sensors, weapon systems, or chemical reagents specified by NAVSEA, and portable mercury-containing devices must have shock-proof construction and a secondary containment boundary per NAVSEA 5100-003D. Inspection and acceptance occur at the destination under FAR 52.246-2, and the contractor must comply with multiple security, cybersecurity, and supply chain integrity clauses, including 252.204-7012 for safeguarding defense information, 252.204-7018 prohibiting acquisition of covered telecommunication equipment, and 252.223-7006 and 252.223-7008 prohibiting toxic chemicals and hexavalent chromium. The contractor must provide a Unique Entity Identifier and CAGE code, represent size and socioeconomic status, and comply with trafficking in persons, equal opportunity, employment eligibility verification, and sustainable product requirements. Electronic invoicing via WAWF is mandatory, and all submissions must conform to DLA’s technical and quality requirements from their master list, with the solicitation issued under SPE7MC-26-T-131W and managed by the Defense Logistics Agency’s Federal procurement system.
Defense Logistics Agency

POSTED

about 15 hours ago

DEADLINE

in 2 days
View Details
NAICS: 332919
New
DIBBS
THREAD PIECE, UNIONThis contract specifies the procurement of a THREAD PIECE, UNION with NSN 4730014734659 and part numbers 104T-7-304-SS and MD104-7-CD, for a quantity of 35 units at a unit price of $35.00, totaling $1,225. Delivery is required within 168 days FOB origin, with no variance allowed in quantity, and inspection and acceptance occur at the destination. Packaging must comply with MIL-STD-2073-1E and MIL-STD-129, with specific packaging methods and markings as defined, including the use of unit containers and no special marking code. The item is classified as a critical application item and must adhere to strict material restrictions: mercury or mercury-containing compounds are prohibited unless used in functional applications such as batteries, fluorescent lights, sensors, weapon systems, or chemical reagents specified by NAVSEA, and portable mercury-containing items must have shockproof construction and a secondary containment barrier per NAVSEA 5100-003D. All technical and quality requirements referenced by R or I numbers are governed by the DLA Master List of Technical and Quality Requirements, with revisions controlled by the solicitation or award date depending on acquisition type. The contract includes specific shipping instructions to the DLA distribution center in Tracy, California, with transportation procedures defined by DLAD Proc Notes C19 and C20. The original required delivery date is March 6, 2027, with a need ship date of January 5, 2027, under solicitation SPE7M2-26-T-5580 issued by the Department of Defense’s Nuclear Reactor Program.
NUCLEAR REACTOR PROGRAM

POSTED

about 15 hours ago

DEADLINE

in 2 days
View Details
NAICS: 332919
New
DIBBS
ELBOW, TUBE TO BOSSThe contract specifies the procurement of a steel elbow fitting with a 3/8 inch nominal tube outside diameter, designated as a commercial item and identified by NSN 4730-01-054-6023, with a total quantity of 374 units. The item must conform to the technical and quality requirements outlined in the DLA Master List of Technical and Quality Requirements, specifically referencing SAE AS1040G Revision G and SAE AS4841 Revision D, and is subject to Class 3 threads and critical application standards. Manufacturing and assembly must be performed exclusively by accredited entities listed on the Performance Review Institute’s Qualified Manufacturer List or Qualified Products List, accessible via eAuditNet. The product is prohibited from containing mercury or mercury-containing compounds except under narrowly defined exceptions for functional components like batteries, sensors, or instruments, and portable mercury-containing devices must include a secondary containment and be shockproof in compliance with NAVSEA 5100-003D. Ozone-depleting chemicals are strictly banned, and any substitute materials require prior approval. Packaging and marking must adhere to MIL-STD-2073-1E and MIL-STD-129, with no special marking required, and palletization must follow DLA packaging protocols. Delivery is FOB origin, with inspection and acceptance occurring at the destination, and the shipment must be delivered within 173 days to the DLA Distribution Depot Hill in Hill AFB, Utah. The contract includes a zero variance tolerance on quantity, and the required delivery date is August 3, 2027, with a need ship date of January 10, 2027.
FLUID HANDLING DIVISION

POSTED

about 15 hours ago

DEADLINE

in 2 days
View Details
NAICS: 332919
New
Federal
VALVE,REGULATING,FLThis contract pertains to the repair and refurbishment of a regulating valve critical to a shipboard system, designated as SPECIAL EMPHASIS material due to its direct impact on safety, reliability, and operational integrity of naval vessels. The work requires strict adherence to referenced military and commercial specifications including ASTM-A581, ASTM-A582, SAE AMS 5643, MIL-STD-2035, MIL-STD-792, and multiple NAVSEA and S9074 series standards for welding, brazing, material certification, and nondestructive testing. All components must be refurbished to comply with specific drawings including V3D10233 and WI-S1E10035, with traceability maintained from raw material through final assembly using approved markings, heat lot codes, and validated certifications. The contract mandates that all materials be traceable to chemical and mechanical test reports, and any processed or repaired components must undergo re-certification if their properties are altered. The contractor must submit comprehensive documentation including Welding Procedure Specifications, Procedure Qualification Records, Consumed Weld Metal Certificates, and Final Certificates of Compliance through the Wide Area WorkFlow system, with final acceptance required prior to shipment. The contractor must operate under a quality system certified to ISO-9001 with supporting calibration controls per ISO-10012 or ANSI-Z540.3, and is subject to Government Quality Assurance at source by DCMA personnel. All subcontractors must be vetted for capability, and their work must conform to the same rigorous standards. For repair work, the vendor has 180 days from receipt of the carcass to perform a teardown and evaluation and submit a Firm-Fixed Price quote that includes all labor, materials, and handling costs. A mandatory Repair Turn Around Time of 365 days applies, with price reductions imposed for failure to meet deadlines and potential termination for default. No mercury may be present in components, and marking of materials is strictly controlled to avoid improper identification. All waivers and deviations—classified as Critical, Major, or Minor—require prior written approval by the Contracting Officer and must be submitted via ECDS. Certifications must be complete, unqualified, and directly linked to physical markings on each part; missing, incomplete, or ambiguous documentation results in rejection. The contract operates under Emergency Acquisition Flexibilities, is rated under DPAS, and requires bilateral acceptance before execution. All documentation must be submitted electronically via WAWF with designated
Navsup Weapon Systems Support Mech

POSTED

about 20 hours ago

DEADLINE

in 28 days
View Details
NAICS: 332919
New
Federal
VALVE, GLOBEThis contract pertains to the procurement of a 1/2 inch socket weld in-line stop valve with backseat, manufactured in strict accordance with NAVSHIPS drawing 803-2177525, assembly C3A1AF, for use in critical shipboard systems where failure could result in catastrophic consequences including loss of life or the vessel itself. The item is designated as SPECIAL EMPHASIS MATERIAL (Level I), requiring exhaustive control procedures from raw material sourcing through final inspection. All materials must conform to precise specifications including ASTM-A105, ASTM-A182, MIL-S-24093, ASTM-A193, ASTM-A194, and others, with mandatory chemical and mechanical analysis traceable to heat lot numbers marked directly on components. Hardness, pressure testing, non-destructive inspections, and hydrogen embrittlement relief treatments are required and certified, with acceptance criteria tied directly to drawing notes and referenced standards. First Article Testing is mandatory, and all welding, brazing, and hardfacing must be performed by qualified personnel using approved procedures documented under S9074-AQ-GIB-010/248 and 0900-LP-001-7000, with full submission of weld procedure qualifications and consumed weld metal certifications before production begins. The contractor must maintain and operate a quality system compliant with ISO-9001, ISO-10012, and ISO/IEC 17025, or as an alternative, MIL-I-45208 with MIL-STD-45662 calibration standards, subject to government quality assurance inspection at source. Traceability is absolute—every material lot, component, and test result must be permanently and legibly marked, with documentation linking inspection data to individual items through unique traceability codes maintained across all subcontracted operations. Certifications, especially for chemical composition, mechanical properties, and non-destructive testing, must be 100% verified, signed electronically with controlled and auditable methods, and free of disclaimers. Final acceptance is zero-defect: one nonconformity triggers lot rejection. All fasteners must be marked per MIL-DTL-1222 with manufacturer ID, material symbol, and traceability number, and coatings must be applied after proper heat treatment and baking cycles. The contract mandates strict configuration control, requiring Engineering Change Proposals for any modifications and prohibits unapproved deviations. Deliver
Navsup Weapon Systems Support Mech

POSTED

about 20 hours ago

DEADLINE

in 28 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 333998
New
Federal
CLEANER, AEROSOLThis contract entails the manufacture and delivery of CLEANER, AEROSOL under a fixed-price arrangement with a 90-day delivery requirement, governed by stringent U.S. Navy procurement standards. The item must comply with specification ES6100, cage code 21267, and adhere to mandatory military standards for marking, configuration control, and packaging, including MIL-STD-130, MIL-STD-1285, MIL-STD-973, and MIL-STD-2073. A critical requirement is that all shipments must retain at least 85 percent of their shelf life upon arrival at the first government activity, with expiration or inspection dates clearly marked in month/year format per MIL-STD-129P and DOD 4140.27-M guidelines. The contractor is fully responsible for quality assurance, inspection, and recordkeeping for 365 days after final delivery, and government inspection rights are reserved for verification of compliance. The contract is issued under a total small business set-aside and requires full compliance with Navy cybersecurity maturity model certifications and security prohibitions outlined in recent deviations enacted in February 2026. Payment will be processed through Wide Area Workflow using a combined invoice and receiving report, with inspection and acceptance occurring at the source. All contractual documents are deemed issued upon electronic transmission, and the contractor must ensure no defective material is submitted even during sampling. Delivery must meet exact packaging and marking protocols, with shelf life data tracked in accordance with coded type designations. The contracting officer for all documentation requests and deviations is located at NAVICP-MECH in Mechanicsburg, PA, and all submissions, including engineering change proposals and waiver requests, must follow strict procedures. The contract is managed by Amanda R. Hayward, and solicitation details indicate an award timeline culminating in August 2026, with performance likely extending into 2027 under a shelf-life-critical, non-deteriorative item schedule requiring precise timeline adherence.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 28 days
View Details
NAICS: 332722
New
Federal
SCREW,CAP,SOCKET HEThis contract pertains to the procurement of socket head cap screws and related fasteners designated as Special Emphasis Level I material for use in critical shipboard systems where failure could result in catastrophic loss of life, vessel, or mission-critical functionality. All items must strictly conform to MIL-DTL-1222 specifications with additional requirements for material traceability, mechanical and chemical testing, and quality control under ISO-9001, ISO-10012, and ISO/IEC 17025. Fasteners must be made from K-MONEL alloy, heat treated to QQ-N-286 standards, and subjected to mandatory tensile, yield, elongation, and hardness tests performed on full-sized fasteners by approved laboratories. Traceability is paramount: each lot must be uniquely marked and linked to certified test reports that include chemical composition and mechanical properties, with re-certification required if any process alters the material. No rework, retesting, or resubmittal of failed lots is permitted without explicit approval from the Procurement Contracting Officer. All deliveries require submission of test certifications and compliance documentation via the Wide Area Workflow (WAWF) system to Portsmouth Naval Shipyard, using designated DODAAC N50286 for shipping, inspection, and acceptance, with no material permitted to ship prior to formal acceptance. The contract mandates 100% inspection of certifications, traceability markings, and non-destructive test results, with zero defect acceptance criteria for lot inspection. The material must be mercury-free, properly packaged per MIL-STD-2073, and marked in accordance with MIL-STD-792, with permanent, legible markings applied before coating. A comprehensive quality system is required, subject to government inspection and audit at the supplier’s facility, and subcontractors must be vetted and monitored for compliance. The order is “DO” rated under the Defense Priorities and Allocations System, issued under Emergency Acquisition Flexibilities, and subject to Buy American and small business set-aside provisions. All deviations, waivers, and engineering changes must be formally requested and approved through ECDS, and only authorized laboratories may conduct specialized testing such as slow strain rate tensile testing. Final delivery of all material is due no later than 365 days after contract effective date.
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 14 days
View Details
NAICS: 332722
New
Federal
STUD,CONTINUOUS THRThis contract solicits specialized fasteners designated as SPECIAL EMPHASIS material for critical shipboard systems, where failure could result in catastrophic loss of life, vessel, or mission-critical functions. The core item is a STUD, CONTINUOUS THR, manufactured to MIL-DTL-1222J with a grade of 500 per QQ-N-286, solution annealed and age hardened, measuring 5/8 inch in diameter and 3 3/8 inches in length with 11 UNC thread and a 3A class of fit. All materials must be traceable from raw stock through final inspection, with mandatory certifications for chemical composition, mechanical properties, liquid penetrant, and ultrasonic testing of starting material over 4 inches in diameter. Each shipment requires an additional fastener per heat/lot for traceability, and all test reports must be fully documented, unqualified, and linked to unique markings on each item per MIL-STD-792. The contractor must maintain an ISO-9001 quality system with ISO-10012/17025 calibration compliance, subject to government source inspection, and any deviation from requirements requires prior written approval through a formal waiver or deviation process. Delivery of material is capped at 365 days after contract award, with mandatory submission of certification data via WAWF to Portsmouth Naval Shipyard (N50286) at least 20 days prior to shipment, and final acceptance must be secured before any material is shipped. The order is DO-rated under the Defense Priorities and Allocations System and issued under Emergency Acquisition Flexibilities, reflecting its national defense importance. The contract is a total small business set-aside, requiring Buy American compliance, and mandates strict prohibition of mercury and unauthorized substitution of materials. Certification of compliance must be submitted for every shipment, attesting to full adherence to all applicable specifications, including MIL-DTL-1222, QQ-N-286, and T9074-AS-GIB-010/271, with no disclaimers allowed. All nonconforming material is subject to rejection, and retesting or resubmission is prohibited without PCO approval. Government inspections are required at the supplier’s facility, and subcontractor quality controls must mirror prime contractor obligations. The solicitation allows award at the CLIN level, with vendors encouraged to quote on individual items, and quantity discounts for multiple CLINS are expressly forbidden to prevent
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 28 days
View Details
NAICS: 334220
New
Federal
ANTENNA ASSEMBLYThis contract solicitation, issued by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, seeks repair services for the ANTENNA ASSEMBLY under solicitation number N0010426QXB79, with responses due by August 3, 2026. The work requires strict adherence to military standards including MIL-STD-130 for item marking, MIL-STD-2073 for packaging, and DFARS 252.211-7003 for Item Unique Identification (IUID). Contractors must be authorized repair sources and submit firm-fixed-price, not-to-exceed, or estimated repair quotes with full cost breakdowns, including profit rates where feasible. The Government mandates a Repair Turnaround Time of 265 days from physical receipt of the asset at the contractor’s facility, as logged in the Commercial Asset Visibility system, and imposes financial penalties for delays unless excused by government-caused delays. A throughput constraint must be provided, and the induction period expires one year after award, rendering any asset received after that date ineligible without bilateral approval. The contract includes mandatory compliance with Buy American provisions, cybersecurity maturity certification requirements, and a Small Business Subcontracting Plan, along with specific instructions for electronic submission of quotes to the designated Navy email. The award will be bilateral, requiring formal contractor acceptance before execution. Contractors must identify the CAGE codes for award, inspection, and shipping locations, and specify the basis of pricing, including historical repair data or estimated costs. An optional increase of up to a specified percentage of the original quantity may be exercised unilaterally by the Government within 365 days of award under FAR 52.217-6. All work must conform to original manufacturer specifications and approved technical documentation, with changes to design, material, or part number requiring prior written authorization from the Contracting Officer. Documentation must be handled in accordance with distribution statements, and only authorized distributors may submit quotes, with proof of authorization required. Freight is managed by Navy CAV or Proxy CAV as defined in NAVSUPWSSFA24 or NAVSUPWSSFA25, and all records must be retained for one year after final delivery.
Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 14 days
View Details
NAICS: 333998
New
Federal
WASHER,SPHERICAL SEThis contract requires the manufacture of a WASHER, SPHERICAL SE with part number CL-7-SW and CAGE code 99826, under a fixed-price delivery terms with delivery due within 90 days. The item must comply strictly with technical specifications outlined in military standards, including MIL-STD-130 for mechanical parts, MIL-STD-1285 for electrical and electronic components, and MIL-STD-973 for configuration control, which mandates formal submission of engineering change proposals, deviations, and waivers to NAVICP-MECH in Mechanicsburg, PA. Government source inspection is mandatory, and the contractor bears full responsibility for ensuring quality compliance through their internal inspection system, maintaining detailed records for 365 days after final delivery. The contract is a total small business set-aside with specific small business program representations required, and the contractor must adhere to cybersecurity maturity model certification levels and security prohibitions as defined in recent federal deviations. The contract incorporates Wide Area Workflow payment instructions and specifies inspection and acceptance at the source, with invoicing coordinated through navsupwawf.wss.ftc@navy.mil. Packaging must follow MIL-STD-2073 as referenced in the schedule, and all items must be properly marked in accordance with designated military standards. Source control drawings restrict award to vendors explicitly listed, and substitute items are prohibited without prior government testing and approval through NAVICP-MECH. Commercial brand name descriptions are permitted, but alternate proposals must demonstrate full technical equivalence. The government considers contractual documents issued upon electronic transmission, and all documentation, including canceled or restricted-use standards, must be obtained through designated DOD and Navy sources with proper authorization for controlled access materials such as NOFORN and Official Use Only documents. The solicitation is active with a response deadline of August 17, 2026, and was issued by the Navy Supply Systems Command’s Weapon Systems Support unit in Mechanicsburg, Pennsylvania.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 28 days
View Details
NAICS: 332919
New
Federal
UNION,PIPEThis contract, issued under solicitation N0010426QFF66 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, requires the furnishing of a 1-inch NPS Union Assembly designated as SPECIAL EMPHASIS Level I material due to its critical use in shipboard systems, where failure could result in catastrophic loss of life or vessel. The item must conform precisely to Naval Ship Systems Command Drawing 803-1385946, with specific prohibitions against welding on UNS C92200 and UNS C90300 materials, and mandatory pressure ratings corrected to 1500 WOG for 1/8 to 2-inch NPS and 800 WOG for 2-1/2 inch NPS. All components must be traceable from raw material through final assembly to certified test reports, with permanent markings applied per MIL-STD-792. Chemical and mechanical analysis is required for critical parts, and material certifications must include full, unqualified declarations of compliance with no disclaimers. Each union assembly must pass hydrostatic and underwater or soapsuds tests in accordance with specified notes in the drawing, with strict pressure and time tolerances applied. Certification of compliance must be submitted via WAWF prior to delivery, with all data referencing contract N00104 and directed to Portsmouth Naval Shipyard’s updated DODAAC N50286, and no material may be shipped without prior written acceptance. The contract mandates a quality system compliant with ISO-9001 and either ISO-10012 or ANSI-Z540.3 with ISO/IEC-17025, or alternately MIL-I-45208 and MIL-STD-45662, subject to government audit at any time during production. All subcontractors must be evaluated and their work controlled to ensure conformance, with traceability preserved throughout every processing step, including subcontracted operations. The contract explicitly prohibits mercury contamination and unauthorized marking of materials, except for fasteners, and requires all thread inspections to follow FED-STD-H28 System 21 or 22 as applicable, with exacting standards for O-ring groove inspection using the General Acceptance Criteria CSD008 where no explicit defect criteria exist. Final acceptance requires 100% inspection of traceability markings, certification documents, and test reports, with zero-defect lot
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 18 days
View Details
NAICS: 333992
New
Federal
34--ROD,WELDINGThis contract pertains to the procurement of welding electrodes and related materials designated as SPECIAL EMPHASIS Level I material, critical for use in shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The items must comply strictly with specification T9074-BC-GIB-010/0200 and its Appendix B, which define requirements for bare and flux-cored welding electrodes and fluxes for low-alloy steel applications, including strict limits on chromium content (max 0.05%), yield strength range of 100ksi to 125ksi, and prohibition of stress relief thermal treatment. Traceability is mandatory through unique heat-lot identifiers on packaging, with certification data required for every test performed and submitted electronically via WAWF to Portsmouth Naval Shipyard prior to shipment. All certifications must be unqualified, signed, and directly linked to the physical material shipped, with rejection criteria for missing, incomplete, or non-compliant documentation. The contract mandates rigorous quality assurance procedures aligned with ISO-9001, ISO-10012, and ISO/IEC 17025, or alternately MIL-I-45208 and MIL-STD-45662, with Government inspection rights at any point including subcontractor facilities. First Article Testing is required, with a FAT report due 180 days after contract award and approval within 90 days of receipt, and final delivery must occur no later than 250 days after contract effective date. Government Source Inspection has been reinstated, and all orders are DO-rated under the Defense Priorities and Allocations System. Contractors must operate a documented quality system subject to audit, maintain full configuration control, and submit Engineering Change Proposals for any modifications. Material traceability must be maintained through all processing stages, with labeling requirements for spooled and cut-length electrodes. All submissions, including certifications and waivers, must be processed through ECDS, and no material may be shipped without prior WAWF acceptance. The solicitation response deadline is August 3, 2026, with Amanda Bailey as the primary point of contact, and the prior Small Business Set-Aside has been dissolved with the AMC code updated from “T” to “G”.
Welding and Soldering Equipment Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 14 days
View Details
NAICS: 333613
New
Federal
CONTROL ASSEMBLY,PUThis contract pertains to the procurement of a Special Emphasis Level I Cable Assembly, designated for critical shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The material must strictly conform to NAVSEA drawing 5486641, Part Number C-1SD/K-NC1004, and comply with MIL-DTL-24231 specifications as amended, including specific modifications such as the use of a Non-Conductive Coating applied via plasma spray and adherence to NAVSEA S9320-AM-PRO-020/MLDG for wiring and molding. All manufacturing must occur in facilities operated by approved vendors listed in the ECDS system, with traceability maintained from raw material through final assembly using permanent markings or controlled tagging procedures. The product is subject to stringent quality assurance protocols requiring a certified ISO-9001 quality system, reinforced by ISO-10012 and ISO/IEC 17025 for calibration, with MIL-I-45208 and MIL-STD-45662 as acceptable alternatives. First Article Testing is mandatory for one complete unit, with destructive and non-destructive evaluations conducted per specified pressure, dielectric, and insulation resistance standards, all modified by reference to NAVSEA SS800-AG-MAN-010/P-9290. Testing must be performed with documented precision, including exact tolerances for pressure and duration, with no disclaimers permitted on certifications. All shipments are contingent upon prior review and acceptance of certification documentation by Portsmouth Naval Shipyard via the Wide Area WorkFlow system, with final delivery scheduled 210 days after submission of certification data. Each delivery must include a Special Emphasis Certificate of Compliance containing detailed traceability to individual components, test results, and full compliance attestation signed by authorized personnel. Government inspection at source is required throughout production, with full access granted to facilities, records, and test equipment for verification. The contract prohibits mercury-containing materials, mandates configuration control through Engineering Change Proposals for any modifications affecting form, fit, function, or interface, and requires all waivers or deviations to be formally justified and approved by the Contracting Officer. Packaging and preservation must meet MIL-STD-2073, and all documentation, including test reports, must be retained for a minimum of seven years and made available to the Government for audit. The procurement is subject to Buy American requirements, priority ratings under DPAS for national defense
Mechanical Power Transmission Equipment Manufacturing

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 339950
New
Federal
PLATE,PROOFThis contract mandates the manufacture of the PLATE, PROOF, identified by NAVSEA Part Number 2762023-3 and CAGE Code 10001, in strict compliance with Drawing 2762023 Revision C. Despite the drawing specifying packaging of twenty plates per bag, NAVSUP requires each plate to be individually bagged due to low demand and critical shelf life constraints. The item must adhere to all material, physical, and marking requirements outlined in applicable military standards, including MIL-STD-130 for mechanical parts and MIL-STD-129P for packaging and labeling. A minimum of 85 percent shelf life must remain upon receipt by the first Government activity, with expiration dates clearly marked in month/year format per DOD 4140.27-M and MIL-STD-129. Configuration control follows MIL-STD-973, requiring formal Engineering Change Proposals, deviations, and waivers to be submitted to the specified contracting office. Government source inspection is mandatory under FAR 52.246-2, and the contractor is responsible for all inspection and quality assurance procedures, maintaining complete records for 365 days after final delivery. The solicitation is a Total Small Business Set-Aside under NAICS code 339950, issued by the Navy Supply Systems Command Weapon Systems Support in Mechanicsburg, PA. The contract was posted on July 20, 2026, with responses due by July 27, 2026. Contract documents are issued electronically via email, fax, or electronic commerce methods, and acceptance of the proposal binds both parties. The point of contact is Joshua D. Martin, with communication directed to JOSHUA.D.MARTIN4@NAVY.MIL. Security compliance includes Cybersecurity Maturity Model Certification requirements, prohibitions and exclusions under Class Deviation 2026-O0025, and adherence to Priority Rating for National Defense purposes. Contractors must obtain all referenced documents through authorized channels, including DODSSP, and request controlled or classified materials through proper government certification. All deliverables must meet the requirements without exception, and failure to comply with shelf life, packaging, or marking rules will result in non-conforming delivery.
Sign Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 7 days
View Details
NAICS: 332919
New
Federal
UNION,TUBEThis contract pertains to the procurement of a specialized tube union assembly designated as SPECIAL EMPHASIS material (Level I/SUBSAFE), intended for critical shipboard systems where failure could result in catastrophic outcomes including loss of life or vessel. The item must comply with General Dynamics drawing 2621-791-03 and associated specifications, with strict material requirements including SAE-AMS-QQ-S-763 Class 304 for tailpiece and thread piece components, and QQ-N-281 for the nut. The O-ring must be made from AMS 7259 material, superseding the drawing-specified MIL-G-23652. All materials require full traceability from raw stock to finished component through unique heat-lot or traceability markings, maintained throughout fabrication, subcontracting, and assembly. Chemical and mechanical certifications must be provided for each lot, with electronic signatures accepted under controlled, auditable processes, and no disclaimers or qualifiers are permitted on certification documents. Quality assurance is stringent, requiring full compliance with ISO-9001 and ISO-10012 or MIL-I-45208 and MIL-STD-45662, with government quality assurance inspection at source. All welds and brazing must adhere to S9074-AQ-GIB-010/248 or S9074-AR-GIB-010A/278, with procedures and qualifications submitted for prior approval. Welding consumables require Certificate of Compliance, and all welds, including hardfacing, must be verified for composition and dilution. Inspection protocols mandate zero-defect acceptance sampling, 100% verification of traceability markings, and 100% review of test certifications. Subcontractors must be pre-screened and monitored, with purchase orders incorporating all relevant quality clauses. Certification data must be submitted via WAWF to Portsmouth Naval Shipyard with Ship to N50286, Inspect by N39040, Accept by N39040, and notification sent to PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL; no material may ship without prior acceptance. The contract is issued under Emergency Acquisition Flexibilities, is DO-rated for national defense use, and falls under a total small business set-aside. Delivery is capped at 365 days after contract effective date, and all documentation must reflect current revisions
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 28 days
View Details