Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Union Street Pavement Renovation and Sewer Replacement

Closed
20260720026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The project along Union Street in San Francisco, from Lyon Street to Powell Street, entails comprehensive pavement renovation and sewer system replacement, involving full-depth planing, placement of hot mix asphalt, and construction of concrete pavement, bases, bus pads, curbs, gutters, and sidewalks. Sewer work includes replacing main sewers with vitrified clay pipe and high-density polyethylene, lining existing pipes with cured-in-place liner, constructing new manholes and catch basins, and reinstating side sewer connections. Forty-two concrete curb ramps with detectable warning surfaces must be installed, alongside extensive traffic control measures and management of potentially hazardous soils. Allowances are provided for partnering, transit support, police services, and unforeseen conditions, with specific fixed allocations for environmental mitigation, erosion control, restoration, temporary shoring, contaminated soil disposal, and flow diversion. All materials must be delivered in original manufacturer packaging, protected from environmental damage, and labeled with manufacturer details and installation instructions, stored above ground and in controlled environments. Work must comply with ASTM, Caltrans, and City-specific standards, including environmental screening levels and EPA test methods for soil contaminants. The contractor assumes full responsibility for quality and correction of deficiencies, subject to inspection at both origin and destination, with final acceptance occurring on-site after punch list resolution. Bids must be submitted electronically via ShareFile in a single PDF file named to the exact specification, with no physical submissions accepted. The solicitation closed on August 12, 2026, and is managed by San Francisco Public Works, with Edmund Lee and Jose Silva Hernandez as primary points of contact. The NAICS code is 237110, reflecting municipal sewer and water line construction. The contract does not include explicitly cited FAR clauses, nor is a formal list of attachments provided; instead, documentation requirements are embedded throughout technical sections, including safety data sheets, certified test reports, and geotextile compliance records, limited to 200 sheets per submission on a USB 3.0 drive formatted as FAT32. Personnel must hold HAZWOPER, Cal/OSHA asbestos, silica, and respiratory protection certifications, with designated roles including a project manager, site safety officer, and certified industrial hygienist. The contractor must certify compliance with municipal conflict of interest statutes and immediately disclose any OCI. Change orders, field orders, or unilateral directives are the sole mechanisms for modifications; no options or extensions are pre-negotiated. Pricing is provided in placeholder format for most line items, with only specific

General Info

Renovate Union Street pavement and sewer system, install curb ramps, manage traffic and hazardous soils, comply with accessibility standards.

Place of Performance

San Francisco, CA, 94102, USA

Set-Aside

NONE

Documents

4

Addendum No. 1 for Sourcing Event 0000009168 - Union Street Pavement Renovation and Sewer Replacement

PDF, High priority: read this firstamendment
High

Bid Form Package for Union Street Pavement Renovation and Sewer Replacement

PDF, High priority: read this firstbid-form
High

Union Street Pavement Renovation and Sewer Replacement Project Manual - Sourcing Event 0000009168

PDF, High priority: read this firstproject-manual
High

Topographic Survey and Utility Drawings May 2025

PDF, Low prioritydrawings
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Public Works
Contacts2 people available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #0000009168: The project, located along Union Street from Lyon Street to Powell Street in San Francisco, consists of comprehensive pavement renovation and sewer system replacement. The scope of work includes full depth planing, placing hot mix asphalt, and constructing concrete pavement, bases, bus pads, curbs, gutters, and sidewalks. Sewer work involves replacing main sewers with VCP and HDPE pipes, lining existing sewers with Cured-In-Place Liner (CIPL), constructing new manholes and catch basins, and reinstating side sewer connections. The project also requires the construction of 42 concrete curb ramps with detectable warning surfaces, extensive traffic control, and management of potentially hazardous soils. Allowances are included for partnering, transit support, police officers, and unforeseen conditions.

More opportunities from California → San Francisco Public Works

Same awarding agency

NAICS: 236220
New
SLED
EXT DPW | PW 887 Ptrr Tnnt Imprv & Fire
Solicitation # 0000012033
San Francisco Public Works is soliciting bids for the 887 Potrero Tenant Improvement and Fire Alarm Control Unit Replacement project at the Mental Health Rehabilitation Center located on the San Francisco Zuckerberg General Hospital campus. This project aims to expand and enhance the facility's capacity for adult patients requiring intensive mental health care. The scope of work includes upgrading the nurse call communication system, converting isolation rooms into locked seclusion rooms with ligature-resistant features, installing card readers for access control in sensitive areas, and implementing various accessibility improvements to restrooms, kitchenettes, drinking fountains, and paths of travel, including the leveling of the main entry threshold and sidewalk. Additionally, the project requires a facility-wide replacement of outdated fire alarm components with new Edwards EST-4 fire alarm control units and associated devices, including smoke detectors, remote annunciators, and elevator shunt trip and heat detectors. The estimated construction cost for this project is approximately 5.4 million dollars, with a completion timeline of 460 consecutive calendar days. The contract will be awarded on a Lump Sum Bid Items basis, and progressive payments will be made. Bidders must possess a Class B license and be registered with the California Department of Industrial Relations per Labor Code section 1725.5. Awardees must also be certified as compliant with the Equal Benefits Provisions of Article 131 of the San Francisco Labor and Employment Code within two weeks of notification. All work must adhere to Clean Construction requirements and incorporate Partnering Level 2 elements. Quotations are due by 2:30 p.m. on December 2, 2026, and must be submitted online via ShareFile.
Commercial and Institutional Building Construction

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS