Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Unit Price Curb Ramps and Sidewalk Contract 4

Closed
PW#2026-023TState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083) is a public works solicitation by the City of Tustin, California, for the construction of park infrastructure. The scope of work includes site excavation, plumbing, electrical, instrumentation, street improvements, and the installation of a 12-foot multi-modal path and a 6-foot walking trail. The project has an engineer's estimate of 11,100,000 dollars and a project schedule of 190 contract days. Bidders must hold a Class A contractor's license and submit their proposals via the OpenGov portal by December 10, 2026, at 2:00pm. A critical requirement for responsiveness is the submission of the bid bond both as an electronic upload and as a hard copy delivered to the City Clerk. The contract will be awarded to the low bidder based on the total sum of correctly calculated unit prices. The successful contractor must provide a project baseline schedule within 15 calendar days of execution and adhere to strict safety and quality standards, including Cal-OSHA requirements for qualified persons working near utilities and 2008 ADA Standards for Accessibility. Payment is structured as monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. Liquidated damages are set at 8,800 dollars per calendar day for delays. Required post-award documentation includes payment, faithful performance, and guaranty bonds, as well as a compensation insurance certificate.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
CITB 2026C045
Solicitation # 2026C045
Invitation to Bid No. 2026C045 is issued by the Municipality of Anchorage for the Old Seward Highway Surface Rehabilitation project, Phase 2, spanning from International Airport Road to Tudor Road. With an estimated construction cost between 3 million and 5 million dollars, the scope of work includes asphalt pavement rehabilitation, sidewalk and curb replacement, storm drain improvements, and the treatment of contaminated soils. The project requires the contractor to provide all labor, equipment, and materials, adhering to the 2024 Municipality of Anchorage Standard Specifications and various state and national traffic and electrical codes. Key deliverables include the installation of inlaid traffic markings, flexible delineators, and the coordination of access for adjacent businesses and school bus routes. The bidding process requires the submission of sealed paper bids to the MOA Purchasing Department by 2 PM local time on November 5, 2026, as electronic submissions are not accepted. Bidders must provide a bid bond, valid state and municipal contractor licenses, and a SAM report. The contract will be awarded to the responsible bidder who submits the lowest responsive bid, with preferences available for local and veteran bidders. Awardees must comply with a Community Workforce Agreement and prevailing wage requirements. Environmental compliance is critical, as work in Campbell Creek requires a Fish Habitat Permit and is subject to inspection by the U.S. Army Corps of Engineers, while soil testing must follow specific EPA and ADEC protocols for lead contamination.
Municipality of Anchorage

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Parking Lot E8 Repairs
Solicitation # CSULBSOQ80
The Parking Lot E8 Repairs project (Project Number PE825PK023) at California State University, Long Beach, involves the complete removal of existing four-inch asphalt pavement and the upper 18 inches of soil, including cement-treated soil. The scope of work requires the installation of new asphalt over non-expansive fill compacted to at least 95 percent relative compaction, as well as the installation of one new EV charging station and the conversion of nine EV-ready stalls to full charging capability. The owner's construction estimate for this public works project is 3,700,000 dollars, with anticipated construction occurring between April 1 and July 30, 2027. Bidders must hold a valid California contractor's license in either the C-12 or B classification and must be prequalified through the PlanetBids portal. A mandatory site walk was scheduled for November 16, 2026, and sealed bid proposals are due by 2:00 p.m. on December 16, 2026. The project is subject to prevailing wage rate laws, requiring all contractors and subcontractors to be registered with the Department of Industrial Relations. Additionally, the project will be enrolled in the CSU Builders Risk Insurance Program and potentially the Owner-Controlled Insurance Program. Award will be based on the lowest responsive and responsible bid, with specific incentives provided for Disabled Veteran Business Enterprise (DVBE) participation. While a minimum of 3 percent DVBE participation is required, incentives ranging from 1 to 3 percent are available for participation levels between 4 percent and 6 percent or more, subject to a 50,000 dollar cap when combined with Small Business Preferences and a total cumulative adjustment limit of 100,000 dollars.
Purchasing Office Department of California State University, Long Beach

POSTED

about 15 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This contract is for the construction of ADA-compliant curb ramps, curbs, and sidewalks across various locations within the City of Seattle, with work organized into discrete Work Packages that define specific scope, location, and deliverables. The project encompasses a broad range of civil construction activities including traffic control, pavement and sidewalk removal, sawcutting, excavation, subgrade preparation, concrete forming and placement, installation of detectable warning plates and pedestrian pushbutton assemblies, storm drainage systems, HMA and concrete paving, channelization, landscaping, speed hump installation, and traffic sign installation or relocation. Electrical work and rebar installation are explicitly included under the contractor’s responsibilities. The contract utilizes a unit price pricing model, where bidders submit unit rates for specific line items such as construction surveying, vibration monitoring, traffic control officers, and pedestrian signal components, and the low bidder is determined based on these rates. Although bid quantities are used for evaluation, they do not become part of the final contract, and payment will be based on actual quantities performed under each Work Package. The contract has a Not to Exceed value of $4,000,000 with a minimum award value of $200,000, and performance is expected to begin with the first Notice to Proceed issued for a Work Package. The base contract duration is one year, with an option to extend for a second year, ending when either the second year concludes or the total payments reach the cap, whichever comes first. All work must comply with Ordinance No. 126955 and meet standards set by the City of Seattle’s Public Works department, including materials approved under specific Lab Inspection Codes. Contractors must submit detailed submittals, adhere to strict inspection protocols requiring final cleanup and documentation prior to acceptance, and ensure all Work Packages are formally accepted before invoicing. Payment must be requested within 40 calendar days of Work Package Acceptance, and full contract closeout requires submission of state forms, all change orders, resolved claims, and completed performance evaluations. The contract requires compliance with prevailing wage laws, Paid Sick and Safe Time regulations, and strong minority- and women-owned business enterprise (WMBE) participation goals, with scoring based on aspirational targets and guaranteed subcontracting commitments. Contractors must provide a 5% bid guaranty, payment and performance bonds from sureties rated A-:VII or higher on A.M. Best’s list and authorized in Washington, along with a minimum $2 million liability insurance coverage. B

General Info

Construction of ADA curb ramps, sidewalks, traffic control, and landscaping in Seattle, $4M cap, one-year term.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

3

2026-023T Unit Price Curb Ramps and Sidewalk Contract 4 Advertisement for Bids

PDF, High priority: read this firstrfb
High

2026-023T Unit Price Curb Ramps and Sidewalk Contract 4 Bid Forms

PDF, High priority: read this firstbid-forms
High

City of Seattle Payment and Performance Bond Appendix

PDF, High priority: read this firstbond
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts2 people available
OfficeSeattle, WA, 98104, USA
Organization / AgencyWashington → Public Works
Office AddressSeattle, WA, 98104, USA
Contacts
Jomel BingcangCivil Engineer
Ian HernandezSr. Construction Contracting Specialist

Interested Companies (8)

Gary Merlino Constructionseattle, WA
L&B NurseriesSEATTLE, WA
Select Traffic Control And SecurityBurien, WA

See All 8 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Project Description: This project consists of constructing ADA curb ramps and associated curbs and sidewalks. Typical work to include traffic control, surveying, pavement and sidewalk removal, sawcutting, excavation, subgrade preparation, forming, placing and finish concrete work, detectable warning plates, Pedestrian Pushbutton Assembly, storm drainage, HMA and roadway cement concrete paving, channelization, landscaping, installation of speed humps, and traffic sign installation or relocation. The Minimum Award Value for this contract is $200,000, as defined in Section 1-01.3. The Work will be assigned by Work Packages. Each Work Package will specify the scope of work and must be performed as specified in the Contract and the Work Package details. For the purpose of the Bidder/Subcontractor List, this project includes electrical work and rebar installation. Contract Amount: The Contract amount is Not to Exceed $4,000,000 Contract Duration : The Contract duration is for a period of 1 year with the option to extend to a 2nd year starting from the date of the first NTP issued against the first Work Package or until the date that the total payment requested meets the Not to Exceed award amount, whichever is earlier. Project Location: Project locations will be throughout the City of Seattle as specified in each Work Package issued after the Contract is executed.

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 237310
New
SLED
East Marginal Way S Preservation (FHWA)
Solicitation # 2025-057
The East Marginal Way S Preservation project (PW# 2025-057) is a federally funded solicitation by the City of Seattle Public Works to improve the roadway from 1st Ave South to the Tukwila City Limits. With an engineer's estimate of $10,800,000, the scope of work includes pavement overlay, spot base repairs, milling, excavation, and rechannelization to accommodate a protected bike lane and shared use path. Additional infrastructure requirements encompass the installation of curb ramps, sidewalks, drainage, signals, street lighting, signing, striping, and landscaping, with specific emphasis on electrical work and rebar installation. The project must be physically completed within 250 working days of the Notice to Proceed. The contract will be awarded to the lowest responsive bidder based on the Total Base Bid price. Bidders must comply with strict federal and state regulations, including Buy America requirements, Federal and State Prevailing Wage Rates, and a 13% Federal Small Business Enterprise (FSBE) goal. Required submissions include a bid guaranty of 5% of the total bid, wage law compliance certifications, and a proposal for incorporating recycled materials. Performance is subject to quality control standards overseen by the Engineer, and the contractor is required to provide payment and performance bonds in accordance with RCW 60.28.011 (b). Bids for this solicitation are due by November 18, 2026.
Highway, Street, and Bridge Construction

POSTED

about 17 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238220
New
SLED
Charles Street Vehicle Maintenance HVAC Improvements
Solicitation # PW#2026-041
Solicitation PW#2026-041 is a lump sum contract issued by the City of Seattle's Department of Finance and Administrative Services for HVAC improvements at the vehicle maintenance facility located at 805 South Charles Street. The project focuses on upgrading the existing exhaust fan system and installing a new makeup air unit to improve the removal of noxious gases from the welding shop. The architect and engineer estimate for the work is 1,540,511.00 USD. Award will be granted to the apparent low bidder who meets mandatory responsibility criteria, with evaluation based on the sum of the base bid and any selected alternates. The contractor is required to provide payment and performance bonds for 100 percent of the contract amount and must adhere to strict quality control and safety standards, including UL certification and NEMA safety marking. Key submission requirements include an Inclusion Plan and a Bidder/Subcontractor List via the OpenGov portal. The project emphasizes social equity, requiring compliance with SMC 20.42 and the designation of an Equal Employment Opportunity Officer. Performance is subject to liquidated damages of 1,000.00 USD per working day for delays beyond the specified completion date. Weekly payroll reporting must be submitted through the designated online portal to ensure prevailing wage compliance.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 20 hours ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS