Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

United States Highway (US) 101/State Route (SR) 25/Santa Teresa Boulevard Extension Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Clara Valley Transportation Authority is advancing the United States Highway 101/State Route 25/Santa Teresa Boulevard Extension Project in Gilroy, California, with the goal of reconfiguring the intersection of Santa Teresa Boulevard and Castro Valley Road and extending Santa Teresa Boulevard to directly connect with the US 101/SR 25 interchange. The project includes widening the new segment of Santa Teresa Boulevard from two to four lanes over a 0.9-mile stretch to align with improvements from the earlier US 101/SR 25 Interchange Improvement Project Phase 1. Additional elements involve constructing a barrier-separated Class I bike path, installing traffic control systems such as signals or a roundabout, building retaining walls up to 30 feet in height, relocating utilities and power lines, and integrating stormwater management features including bioswales and drainage infrastructure. Roadway lighting will be implemented, and all work will be confined within existing right-of-way limits to minimize land disturbance. Environmental compliance is a central component, with the project undergoing full review under the California Environmental Quality Act and the National Environmental Policy Act, evaluating impacts on air quality, biological resources, noise, water quality, greenhouse gas emissions, cultural resources, and community land use. The lead agency, VTA, is responsible for oversight and environmental documentation, while Caltrans serves as a lead agency under NEPA. The project’s place of performance is clearly identified as Gilroy, California, with all construction and inspection activities centered along the Santa Teresa Boulevard corridor and the US 101/SR 25 interchange. Public input is solicited through formal comment periods with a deadline of August 24, 2026, including in-person meetings and submission options via mail or email. The current documentation reflects a planning and environmental review stage, with no formal contract value, pricing structure, or federal acquisition regulation clauses identified, indicating the project is in a pre-procurement or forecasting phase. Contact for project-related inquiries is Alex Bode, Environmental Planner III, with supplementary support from Ian Kroll of Circlepoint. No contract administration data, payment details, invoicing systems, contracting officer representatives, or offeror certifications are present in the provided materials, underscoring that this is primarily an environmental planning document rather than a finalized procurement contract.

General Info

VTA extends Santa Teresa Boulevard to US 101/SR 25 interchange in Gilroy with bike path, stormwater, and environmental compliance.

Agency

California → Santa Clara Valley Transportation Authority

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Santa Teresa Boulevard and Castro Valley Road, Gilroy, CA, 95020

Set-Aside

NONE

Documents

(2)

NOC US-101-SR 25 Santa Teresa Extension Project

PDFnotice-of-completion

NOP US-101-SR 25 Santa Teresa Extension Project

PDFpresolicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Transportation Authority
Contacts2 people available
OfficeN/A
Organization / Agency
California → Santa Clara Valley Transportation Authority
Office AddressN/A
Contacts
Alex BodeEnvironmental Planner III
Ian KrollSenior Project Manager

Interested Companies (1)

Show more
Circlepoint
Oakland, CA

Full Description

Show more
The Project proposes to reconfigure the existing intersection of Santa Teresa Boulevard and Castro Valley Road and extend Santa Teresa Boulevard to directly connect to the US 101/SR 25 interchange. Additionally, the Project would widen the new segment of Santa Teresa Boulevard from two to four lanes as it approaches the southbound ramps intersecting the US 101/SR 25 interchange to accommodate improvements constructed by the predecessor US 101/SR 25 Interchange Improvement Project Phase 1.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fleet Fast EV Charging - ConstructionThe Port of Seattle’s Aviation Project Management Group has issued a forecast for a fleet fast EV charging construction project, targeting the development of infrastructure to support electric vehicle charging for airport and fleet operations. The project is classified under NAICS code 237310, indicating it involves electrical and other construction work related to utility systems, with no set-aside provisions specified. The anticipated timeline suggests the solicitation will be issued in the near future, with the public notice posted on July 27, 2026. Performance of the work is expected to occur at Port of Seattle facilities, though specific location details are not yet defined. Primary point of contact for inquiries is Angela Peterson, reachable via phone or email, with Katie Techa serving as the project manager for technical coordination. Potential bidders are directed to the official portal for updates and eventual solicitation documents as the project progresses. While this is currently a forecast and not an active solicitation, it signals the Port’s imminent intent to procure construction services for high-capacity electric vehicle charging systems, potentially involving multiple charging stations, power supply upgrades, and integration with existing fleet operations infrastructure. All interested parties are encouraged to monitor the provided link for formal notices and requirements.
Aviation Project Management Group

POSTED

about 15 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will comprehensively upgrade the entry and exit drives along 19th Ave W, the footprint of the existing Downie Building C-14, and surrounding parking areas. Damaged pavement will be milled and overlaid, while stormwater infrastructure will be fully replaced and expanded to divert runoff from the combined sewer system to dedicated storm lines, with water quality treatment integrated where qualifying pavement surfaces are replaced. The remaining slab of the C-14 building will be demolished and reconfigured into a mix of new parking spaces and green areas designed as pollinator habitats, with potential inclusion of a stormwater treatment facility. A new irrigation system will support the landscaped areas, including the median within the entry drive, and electric vehicle charging stations will be installed in the new parking zones to support sustainable transit. The project also introduces protected two-way bike lanes linking the terminal’s entrance to the existing West Wall bike path, enhancing active transportation connectivity. Pedestrian access will be significantly improved toward the intersection of 21st Ave W and W Emerson Pl, as well as to the nearby King County Metro bus stop. Enhanced lighting will be installed throughout the new parking area and connecting pathways, and comprehensive wayfinding signage will guide pedestrians and cyclists through the reconfigured space. These improvements are being led by the Port of Seattle through its Waterfront Project Management office, with the project classified under NAICS code 237310 for highway, street, and bridge construction, and scheduled for procurement following the posted forecast date of July 27, 2026.
Waterfront Project Management

POSTED

about 15 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
LOCAL LET MAINTENANCE CONTRACT, GRAYSON CO, BRIDGE JOINT CLEANING AND SEALINGThe Texas Department of Transportation is soliciting bids for a Local Let Maintenance Contract to perform bridge joint cleaning and sealing along US-69 in Grayson County, Texas, with an estimated contract value of $173,527.40. The work is to be completed within 39 working days after award and includes cleaning and sealing bridge joints across a 0.01-mile segment of the highway. Bids must be submitted electronically through the Electronic State Business Daily (ESBD) and Electronic Bidding System by 2:00 p.m. CT on August 20, 2026, with the solicitation posted on July 27, 2026. A bid guaranty of $3,000.00 is required, and performance will be subject to inspection and acceptance by TxDOT personnel at the project site in Grayson County. The contract is administered by the Paris District of TxDOT, with payment to be processed through the agency’s designated mailing address in Paris, Texas, and accounting tracked under agency code 601 and project number RMC - A00222468. No line-item pricing, option periods, or detailed specifications are provided in the available data, but bidders are directed to the official electronic systems for complete technical and procedural guidance. The work is classified under NAICS code 237310 and is set aside for SLED government procurement without a specific small business set-aside designation. The primary point of contact for inquiries is Bryan Esmaili-Doki at (903) 868-9251, and no specific certification or representation requirements are detailed in the provided information, though compliance with TxDOT standards via ESBD is mandatory.
Texas Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
LOCAL LET MAINTENANCE CONTRACT, FANNIN CO, BRIDGE PREVENTATIVE MAINTENANCEThe Texas Department of Transportation is soliciting bids for a bridge preventative maintenance contract on FM 0897 in Fannin County, Texas, with an estimated cost of $714,057.75. The project is scoped to include routine and protective maintenance activities aimed at extending the service life of the bridge, with a required completion timeline of 40 working days. The contract is administered through the TxDOT Paris District, and all bids must be submitted electronically via the Electronic State Business Daily (ESBD) portal by 2:00 PM on August 20, 2026. A performance bond of $14,000 is required to guarantee project completion. The work will take place along FM 0897 within Fannin and Hopkins Counties, and compliance with TxDOT standard specifications for road, bridge, and municipal construction is implied, though no specific technical standards are detailed in the available documentation. The solicitation does not include a formal contract type designation, nor does it provide line-item pricing, work specifications, evaluation criteria, or special requirements such as packaging, inspection protocols, or contracting officer details. While the agency has set a small business participation goal of 0.0%, no socioeconomic set-aside is in effect, and offerors are not required to submit certifications or representations in the solicitation phase. Payment and invoicing procedures, key personnel requirements, and award methodology remain unspecified in the provided data, with all official terms and conditions to be determined through the full solicitation documents accessible via ESBD.
Texas Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
LOCAL LET MAINTENANCE CONTRACT, FANNIN CO, AGGREGATEThe Texas Department of Transportation is soliciting bids for a Local Let Maintenance Contract in Fannin County, Texas, focused on aggregate work along US-69, with an estimated cost of $326,300. The solicitation, identified as 6506-66-001_0826, was posted on July 27, 2026, and responses are due by August 20, 2026, at 2:00 PM Central Time. Bids must be submitted exclusively through the Electronic State Business Daily (ESBD) or the Electronic Bidding System, with no alternative submission methods accepted. The project is governed under TxDOT’s Local Let program and is designated as a waived project, meaning only prequalified contractors are eligible to bid. Performance is required within Fannin County along US-69, with a total completion timeframe of 182 calendar days from the date of contract award. No formal line-item breakdowns, pricing details, or contract type classifications are provided in the solicitation notice, and no federal accounting codes or appropriation data are listed. The contract administration is handled by the Paris District of TxDOT, with primary inquiries directed to Bryan Esmaili-Doki at (903) 868-9251. The submission address is 3500 SW Loop 286, Paris, TX 75460-0000. The solicitation indicates no small business enterprise goal and lacks detailed specifications, inspection protocols, packaging requirements, or evaluation criteria. Compliance with TxDOT standards is assumed, and full technical requirements are expected to be referenced in official addenda accessible through ESBD. No contract clauses from the Federal Acquisition Regulation are included in the provided materials, and no representations, certifications, or attachments are detailed in the public posting. Contract award will be determined based on the official bid submission process through the designated electronic systems.
Texas Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in 23 days
View Details