University Building Evaluation, Reconditioning, and Tenant Improvements

Closed
27-FAC-002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms by replacing vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing new raised flooring and electrical distribution to support classroom training, replacing variable air volume (VAV) systems using Automated Logic Corporation components, upgrading lighting controls, and correcting plumbing deficiencies. The project also requires repainting and refinishing interior surfaces and installing new signage throughout the facility. This solicitation is a Total Small Business Set-Aside. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three factors of equal importance: past performance, corporate relevant experience, and price. The contract requires the provision of both performance and payment bonds totaling 100 percent of the contract price. Security requirements include background screenings via FBI fingerprint cards and DHS non-disclosure agreements for personnel accessing the site.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price contract for the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope repairs, new roofing, and exterior wall systems. Interior improvements include reconfiguration, new finishes, updated HVAC systems, exhaust extraction, compressed air systems, and a full NFPA-compliant fire suppression system. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated cost is between $10 million and $25 million, with a completion period of 730 days. The project is divided into two primary pricing line items: building renovation (ELIN 0001) and paving removal and replacement (ELIN 0002). Award will be based on the lowest price. Proposals are due by December 2, 2026, at 2:00 PM. Bonding requirements vary by proposal value, with those exceeding $150,000 requiring a bid bond of 20%, a payment bond, and a performance bond. The contract is subject to the Davis-Bacon Act and requires compliance with ADA accessibility guidelines and FAR 52.246-12 for quality control. There is no specified set-aside status for this solicitation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, solicitation N4425527RB007, is an 8(a) Multiple Award Construction Contract (MACC) for the repair of fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at Naval Base Kitsap in Bremerton, Washington. The scope of work includes producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary construction materials and labor. Key technical objectives include addressing Risk Assessment Code Level 4 (RAC-4) deficiencies by extending fire sprinklers to the loading dock platform, securing and monitoring sprinkler control valves in basement elevator pits, and installing missing backflow preventers on the north and south 6-inch wet pipe sprinkler system risers. The project is a Firm-Fixed-Price award with an estimated value between $1 million and $5 million, featuring a period of performance of 440 days from the award of the task order. Proposals are due by December 2, 2026, via the PIEE portal, and will be evaluated based on price and MACC past performance. The contractor must adhere to EM 385-1-1 safety standards, maintain CMMC Level 1 cybersecurity status, and comply with limitations on subcontracting, ensuring no more than 85 percent of the government payment is paid to non-similarly situated entities. Final acceptance is contingent upon performance verification testing and the submission of test reports certified by the Designer of Record.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a Firm-Fixed-Price design-build project for the renovation and modernization of Transfer Facility #6594 at Naval Base Kitsap Bangor, Washington. The project is divided into two critical phases, requiring the facility to remain operational and mission-capable throughout. Phase 1 encompasses all work not included in Phase 2, including the completion and approval of design documents for both phases. Phase 2 focuses on the installation of new building equipment, including the replacement of a 40-ton bridge crane and the installation of a prefabricated paint booth in the High Bay area. The scope also includes a 400 sq ft addition for forklift battery charging, HVAC, fire protection, and electrical upgrades. The estimated magnitude of construction is between $10 million and $25 million. The project mandates strict adherence to USACE EM 385-1-1 safety standards, UFC codes, and cybersecurity requirements, including CMMC Level 1 Self-certification. Performance is tracked via a Network Analysis Schedule, with the base bid (CLIN 0001) due for completion within 360 calendar days of award and an option (CLIN 0002) within 1082 calendar days. Award is based on price and MACC past performance. Proposals must be submitted via the PIEE portal, and the contract requires various bonds, including bid, performance, and payment bonds. No set-aside status is specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This solicitation, number 26-144, is for a full roof replacement of the 1963 LBJ Dorm at the Atterbury Job Corps Center in Edinburgh, Indiana, to address persistent leaks caused by storm and wind damage. The project is a small business set-aside, open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. Interested contractors must attend a mandatory site visit on December 3, 2026, and submit a single lump sum bid by December 14, 2026. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The contractor must be licensed by local authorities and comply with EPA, OSHA, and national building codes, with Indiana regulations prevailing if more stringent. Key deliverables include a sequenced construction schedule due within 10 days of the Notice to Proceed, a one-year workmanship guarantee, and a two-year manufacturer's product warranty. Performance must begin within 14 days of the Notice to Proceed. Payment terms are Net 30, and the contractor must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Final payment is contingent upon the delivery of a completed SF 1413, certified payroll records, and a release of liens.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
This project involves the removal and replacement of damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The contractor is required to install new fire-rated doors while reusing existing push bars and closure systems. All work must comply with EPA and OSHA regulations, as well as local, state, and federal building codes, with Indiana regulations prevailing if they are more stringent. The contract is a single lump sum award based on best value, where evaluation factors include price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The solicitation is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals are due by December 11, 2026, and a mandatory bid conference is scheduled for December 1, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, proof of a valid Indiana Contractor's License, and insurance certificates naming Adams and Associates, Inc. as an additional insured. Upon award, work must commence within 14 days, and a sequenced construction schedule must be provided within 10 days of the Notice to Proceed. The contractor must provide a one-year guarantee of workmanship and manufacturer's product warranties starting from the date of substantial completion. Payment terms are Net 30. Compliance with FAR 52.222-41(g) regarding minimum wage notifications and Davis Bacon Act wage rate decisions is mandatory.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

Yavapai County has issued solicitation 27-FAC-002 for a Design-Build team to perform evaluation, reconditioning, and tenant improvements on a three-story, 56,000 square foot building located at 10000 University Drive in Prescott Valley, Arizona. The project is structured in three distinct phases. Phase 1 involves a comprehensive technical assessment of all building systems, including MEP, structural, and life-safety, resulting in a CSI-compliant evaluation report and potential immediate repairs. Phase 2 focuses on reconditioning the premises to ensure it is code-compliant and suitable for occupation. Phase 3 consists of the final construction of tenant improvements based on end-user space requirements. The contract follows a qualifications-based selection process where cost and pricing are excluded from the initial Statement of Qualifications. The County will negotiate a cost proposal in an open-book format with the highest-ranking firm, which must provide a 200,000 dollar bid bond prior to negotiations. The resulting agreement will have a one-year term with two optional one-year extensions, requiring all work to be completed within 240 calendar days. Performance and payment bonds for 100 percent of construction services are required, and liquidated damages for delays are set at 710 dollars per day. Payment terms are net 45 days from receipt of invoice.

General Info

Yavapai County seeks a Design-Build team for three-phase building reconditioning in Prescott Valley.

Documents

5
PDF, High priority: read this first7 pages · sow
High
PDF, High priority: read this firstq-and-a
High
PDF, High priority: read this first28 pages · rfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this first22 pages · contract-document
High

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 24 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 9 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Facilities
Contacts2 people available
OfficePrescott, AZ, 66006, USA

Interested Companies (38)

AG Architectural SolutionsScottsdale, AZ
AGA SolutionsScottsdale, AZ

See All 38 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
For Phase 1, Evaluation, the County expects the selected Design‑Build team to investigate both visible and concealed conditions of the premises, determine the underlying causes of issues throughout the building, document building equipment, and produce an evaluation report following Construction Specification Institute (CSI) specification that recommends to the County appropriate corrective measures for the entirety of the premises, to include cost, schedule, and scope required for Phase 2. Phase 1 may also include immediate and obvious repair work (window replacement, mold abatement, etc.). During Phase 1, design work shall commence for Phase 3, Tenant Improvements. The architect shall work with the County to program the space requirements for the end users and will meet with County as required to review plans. All design work and construction documents shall be permitted and approved by the County by the conclusion of Phase 2. Upon receipt of the evaluation report, the County shall make determinations based on the findings and will negotiate the scope, cost, and schedule for Phase 2 with the Contractor. For Phase 2, Reconditioning, the Contractor shall execute the approved scope of work negotiated based upon the evaluation report. The County anticipates this Phase to include significant reconditioning of multiple systems throughout the premises and will conclude when it has been determined that the premises is code compliant and is suitable for occupation. The Contractor shall work with the Architect in the development of the construction documents and shall have a Phase 3 cost estimate and schedule ready for review with the County no later than the Architect's submittal date of the required permits. Continuing in Phase 2, the architect will continue to develop construction documents and will provide owner reviews at 30%, 60% and 90% completion of the construction documents. The County shall coordinate with the Architect to review and approve construction documents and shall be submitted by the Architect for permitting at least 6 weeks prior to the conclusion of the Phase 2 reconditioning schedule. Phase 3 will consist of the construction of the Tenant Improvements agreed upon during Phase 3 cost estimate negotiation. During this Phase, the Design-Build team will provide updates to the County as to the progress and expected completion of the Project. This Phase will be considered complete when the building has received its certificate of occupancy.
Addendum #1: The purpose of this addendum is to consolidate and publish all submitted questions and provided answers received during the 'Question' period of the Solicitation. No other additional information will be provided in this document. Attachments: RFQ_27-FAC-002_-_SOLICITATION_ADDENDA_-_10.21.2026.pdf

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS