Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

University Library (UL) Egress Stair

Active
20260916059State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

California State University, Northridge is soliciting a Construction Manager at Risk (CMAR) for the University Library (UL) Egress Stair project (PW2602) in Los Angeles, California. The project focuses on enhancing fire and life safety by constructing a new two-hour rated interior egress stair across levels 01 through 04, requiring specialized structural demolition and modifications to comply with the 2025 California Building Code. Additional scope includes roof and seismic expansion joint replacement, the installation of a skylight and roof drainage, flooring replacement on four levels, and the construction of a new single-occupancy restroom and lactation room. The project has a Guaranteed Maximum Price of 23,185,000.00 and a construction duration of 485 calendar days, with early trade work starting in Summer 2027 and stair construction beginning in November 2027. To minimize operational disruptions, work will primarily occur during a third shift from 11:00 p.m. to 7:00 a.m. The selection process is a two-step weighted evaluation totaling 600 points, consisting of a Technical Proposal (300 points), an Interview (200 points), and a Fee Proposal (100 points). The university emphasizes the ability to manage construction in occupied facilities and requires CMAR experience with similar renovation projects in California within the last five years. Statements of Qualifications are due by October 23, 2026. The contract requires three percent Disabled Veteran Business Enterprise participation and offers a five percent bid advantage to certified Small Businesses. All respondents must be prequalified with the Trustees and registered with the Department of Industrial Relations. Liquidated damages for late completion are set at 2,000.00 per calendar day.

General Info

CSUN seeks CMAR for library egress stair project, GMP 23.185M, due October 2026.

Agency

California State University, NorthridgeView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Los Angeles, CA, 91330, USA

Set-Aside

NONE

Documents

(4)

PW2602 - University Library (UL) Egress Stair RFQ

PDFrfq

CSUN University Library Egress Stair Renovation - Exhibit A

PDFspecifications

PW2602 - University Library (UL) Egress Stair RFQ

PDFrfq

CSUN University Library Egress Stair - Exhibit B

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State University, Northridge
Contacts3 people available
OfficeN/A
Organization / Agency
California State University, Northridge
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #PW2602: $18

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full-motion Weapons System Trainer flight simulator facility for the HC-130J aircraft at USCG Base Elizabeth City, North Carolina. The facility will be approximately 13,000 gross square feet and will include a simulator bay for a Government Furnished, Government Installed mobile simulator, as well as classrooms, debriefing areas, administrative offices, and various support spaces for mechanical, electrical, and telecommunications systems. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued under the DHS National Multiple Award Construction Contract III, Pool Two, with a magnitude estimate of approximately 16 million dollars and a period of performance of 719 calendar days from award. Key technical requirements include the integration of a manufacturer-specific Siemens Building Automation System to ensure compatibility with existing installation-wide systems and compliance with UFC 4-010-06 for cybersecurity of facility-related control systems. The award will be based on a best-value tradeoff between price and non-price factors, specifically focusing on planning, organization, communication, and the contractor's construction approach. Security requirements are stringent, requiring all on-site personnel to be US citizens, with specific registration through RAPIDGate for long-term access and the signing of non-disclosure agreements for sensitive information. Quality control is managed through a rigorous system complying with FAR 52.246-12 and various ASTM standards for materials testing.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines. The scope includes comprehensive site work such as clearing, rock excavation, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building. Specialized requirements include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The contract also requires the demolition of 18 existing magazines and two specific buildings, alongside the installation of primary and secondary electrical distribution, telecommunications, and paving for access roads and loading areas. Bidding is open to various small business set-asides, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California State University, Northridge

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS