Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nevada was posted on February 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UNR - Construct Arch Over Wolf Pack Way

Closed
ITB 9022State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

This project involves constructing an arch over Wolf Pack Way at the south entrance of the University of Nevada, Reno, with an estimated cost between $700,000 and $800,000. It is a prevailing wage project scheduled to commence on June 16, 2025, and expected to be completed by November 14, 2025, with potential adjustments by the owner. The site is located in a sensitive area requiring strict safety measures to protect pedestrians and vehicle access, and coordination with Facilities Services is necessary due to limited staging and access points and potential impacts on nearby buildings. Bidders must submit responses electronically through the designated system, as hard copies are no longer accepted, and should utilize the system’s save feature to ensure timely submission before the response deadline of April 24, 2025. After responses are unsealed, the list of bidders and bid tabulations will be publicly accessible online. Vendors are required to register with the new Nevada System of Higher Education (NSHE) supplier registration system to facilitate payments, with instructions provided for registration and verification. The project mandates comprehensive insurance coverage, including general liability, automobile, workers’ compensation, and specialized coverage if cranes are used, aligned with the contractual requirements. Liquidated damages are set at $500 per day for delays. The project is identified under UNR Project Number 24MNC02828 and is managed by Ryan Caddel, who can be contacted via email or phone for further details.

General Info

Place of Performance

NV, USA

Set-Aside

NONE

Documents

1
PDF

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyReno University of Nevada
Contacts1 person available
OfficeN/A

Full Description

Show more
**BCN Purchasing will no longer accept hard copy bid documents in response to any solicitation including, but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website.
**NSHE recently migrated to a new payment system that requires all of our vendors register with the system in order for our Controllers office to allow us to pay you. Please visit the following link for the NSHE Supplier Registration system to sign up for a new account: https://suppliers.nevada.edu/Membership/Secure/CreateUser.aspx. This process only needs to be completed once. If you believe you already have an account set up please confirm by searching for your company at this link: https://suppliers.nevada.edu/FindSupplier.aspx. If your company is listed and shows the Supplier Status as anything other than “Accepted” then there are still steps that must be completed before your registration is approved.
**Once an ITB/RFP/RFQ/CMAR is released for bidding, bidders may begin working on their response and uploading required documents without submitting their bid early. The NGEM system allows for bidders to save their work. Please make use of this capability in order to give your company enough time to review your response and upload any other documents on the day the ITB/RFP/RFQ/CMAR closes so that you do not miss the cut-off time.
**Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be immediately posted online and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there.
Description of Work: This is a prevailing wage project. Construct arch over Wolf Pack Way at south entrance.   Special Considerations: The site construction duration is anticipated from late summer into the fall semester of 2025. Events during that time period that may effect work are to be determined. The project siting is in a sensitive location requiring high levels of safety with consideration to pedestrians and vehicle access. Material staging and construction access areas are limited. Access impacts to adjacent buildings will need to be coordinated with Facilities Services.   UNR Project#: #24MNC02828 Labor Commissioner #: WA-2025-224 SPWD Project #: 25-B038 Estimated Cost Range: $700,000 to $800,000 Liquidated Damages: $500/day
Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Equipment Floater, and an Installation Floater will be required. Riggers Insurance will be required if a crane is used.  Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts.   Completion of Work: Subject to change by Owner, Work is scheduled to begin on "June 16, 2025" and shall be fully complete by "November 14, 2025."

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS