This Solicitation opportunity from Nevada was posted on February 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
UNR - Construct Arch Over Wolf Pack Way
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This project involves constructing an arch over Wolf Pack Way at the south entrance of the University of Nevada, Reno, with an estimated cost between $700,000 and $800,000. It is a prevailing wage project scheduled to commence on June 16, 2025, and expected to be completed by November 14, 2025, with potential adjustments by the owner. The site is located in a sensitive area requiring strict safety measures to protect pedestrians and vehicle access, and coordination with Facilities Services is necessary due to limited staging and access points and potential impacts on nearby buildings. Bidders must submit responses electronically through the designated system, as hard copies are no longer accepted, and should utilize the system’s save feature to ensure timely submission before the response deadline of April 24, 2025. After responses are unsealed, the list of bidders and bid tabulations will be publicly accessible online. Vendors are required to register with the new Nevada System of Higher Education (NSHE) supplier registration system to facilitate payments, with instructions provided for registration and verification. The project mandates comprehensive insurance coverage, including general liability, automobile, workers’ compensation, and specialized coverage if cranes are used, aligned with the contractual requirements. Liquidated damages are set at $500 per day for delays. The project is identified under UNR Project Number 24MNC02828 and is managed by Ryan Caddel, who can be contacted via email or phone for further details.
General Info
Place of Performance
NV, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
**NSHE recently migrated to a new payment system that requires all of our vendors register with the system in order for our Controllers office to allow us to pay you. Please visit the following link for the NSHE Supplier Registration system to sign up for a new account: https://suppliers.nevada.edu/Membership/Secure/CreateUser.aspx. This process only needs to be completed once. If you believe you already have an account set up please confirm by searching for your company at this link: https://suppliers.nevada.edu/FindSupplier.aspx. If your company is listed and shows the Supplier Status as anything other than “Accepted” then there are still steps that must be completed before your registration is approved.
**Once an ITB/RFP/RFQ/CMAR is released for bidding, bidders may begin working on their response and uploading required documents without submitting their bid early. The NGEM system allows for bidders to save their work. Please make use of this capability in order to give your company enough time to review your response and upload any other documents on the day the ITB/RFP/RFQ/CMAR closes so that you do not miss the cut-off time.
**Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be immediately posted online and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there.
Description of Work: This is a prevailing wage project. Construct arch over Wolf Pack Way at south entrance. Special Considerations: The site construction duration is anticipated from late summer into the fall semester of 2025. Events during that time period that may effect work are to be determined. The project siting is in a sensitive location requiring high levels of safety with consideration to pedestrians and vehicle access. Material staging and construction access areas are limited. Access impacts to adjacent buildings will need to be coordinated with Facilities Services. UNR Project#: #24MNC02828 Labor Commissioner #: WA-2025-224 SPWD Project #: 25-B038 Estimated Cost Range: $700,000 to $800,000 Liquidated Damages: $500/day
Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Equipment Floater, and an Installation Floater will be required. Riggers Insurance will be required if a crane is used. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "June 16, 2025" and shall be fully complete by "November 14, 2025."
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
