This Solicitation opportunity from Nevada was posted on February 8, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
UNR - Construct New Gate Arm at Clark Administration Roadway
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project involves constructing a new dual arm security access gate and developing a student drop-off zone at UNR, with an estimated cost between $230,000 and $280,000. It is a prevailing wage project requiring specific insurance coverages, including general liability, automobile liability, workers' compensation, builders risk, and pollution liability. Construction is scheduled to commence on May 20, 2024, and must be completed by August 2, 2024, with liquidated damages set at $500 per day for delays. The site is within a dense utility zone, and work will occur during summer sessions, necessitating fencing, signage, and limited staging areas to ensure safety and minimize disruption. Long lead items, such as the access gate, should be procured before starting construction. All bid submissions must be made electronically through the designated website, as BCN Purchasing no longer accepts hard copy responses. Vendors are required to register with the new NSHE payment system, which involves a one-time registration process, and should verify their account status before bidding. Bidders can prepare responses in advance using the NGEM system, which allows saving work and uploading documents close to the deadline. Once bids close and responses are unsealed, the list of bidders and bid tabulations will be publicly accessible online. The solicitation, identified as ITB 8951 Addendum 1, was posted on February 8, 2024, with a response deadline of March 7, 2024, and can be reviewed through the provided online link.
General Info
Place of Performance
NV, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
**NSHE recently migrated to a new payment system that requires all of our vendors register with the system in order for our Controllers office to allow us to pay you. Please visit the following link for the NSHE Supplier Registration system to sign up for a new account: https://suppliers.nevada.edu/Membership/Secure/CreateUser.aspx. This process only needs to be completed once. If you believe you already have an account set up please confirm by searching for your company at this link: https://suppliers.nevada.edu/FindSupplier.aspx. If your company is listed and shows the Supplier Status as anything other than “Accepted” then there are still steps that must be completed before your registration is approved.
**Once an ITB/RFP/RFQ/CMAR is released for bidding, bidders may begin working on their response and uploading required documents without submitting their bid early. The NGEM system allows for bidders to save their work. Please make use of this capability in order to give your company enough time to review your response and upload any other documents on the day the ITB/RFP/RFQ/CMAR closes so that you do not miss the cut-off time.
**Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be immediately posted online and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there.
Description of Work: This is a prevailing wage project. Provide and install a new dual arm security access gate and construct student drop off zone. UNR Project#: #23MNC02498 Labor Commissioner #: WA-2024-186 SPWD Project #24-B028 Estimated Cost Range: $230,000 to $280,000 Liquidated Damages: $500/day Special Considerations: Construction mobilization and work shall begin after commencement is completed. Start date to be May 20, 2024. Long lead time items such as the access gate to be procured prior to construction start. Project within a highly concentrated utility zone. Summer school will be in session and contractor will need to install fencing and signage to keep students and staff out of work zone. Staging area will be limited. Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Builders Risk Insurance, and Contractors Pollution Liability Insurance will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "May 20, 2024" and shall be fully complete by "August 2, 2024."
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
