Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on April 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UNT Discovery Park D170 Research Lab Buildout

Closed
RFCSP752-25-1010ERState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to perform structural repairs and planned maintenance for the Blackpool Tower. The project is divided into three primary phases: the Winter Works 2026/27 package occurring during operational closure from November 2026 to March 2027, the Summer Works 2027 package during the operating season from April 2027 to November 2027, and subsequent ad-hoc maintenance based on annual inspections beyond November 2027. The estimated total value of the contract is 4,000,000 GBP including VAT, with a potential option to extend for one year into 2028. The contract is an open competition particularly suitable for small and medium-sized enterprises, with an award based on a 10% weighting for social value. Mandatory requirements for bidders include professional indemnity insurance of 5 million GBP and employer's and public liability insurance of 10 million GBP each. Technical qualifications are strictly enforced, requiring IRATA level 3 supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or the Institution of Structural Engineers. All work must comply with BS EN 1090 Execution Class 3, the Construction Design and Management Regulations 2015, and UK GDPR. Tenders must be submitted electronically by November 13, 2026.
Blackpool Borough Council

POSTED

about 2 hours ago

DEADLINE

in 23 days
NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento has issued solicitation 26-091-ITB for the Corpyard Phase II project, which requires the structural anchoring and welding of 14 existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, drilling and hole cleaning, the installation of Bolthold asphalt substrate, bolting down ASTMA36 plates using epoxied steel rods, and performing AWS welding to secure the plates to the container framing. To prevent corrosion, the contractor must apply a zinc-rich cold galvanizing rust-inhibiting coating. All work must be performed by a licensed contractor holding a current California C-51 or C-60 license and must adhere to PSE stamped drawings, structural calculations, and standards including ASCE 7-22, CBC 2022, and AISC 360-16. Final acceptance is contingent upon a successful inspection by the City's Building department. The estimated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via the OpenGov portal by November 10, 2026, at 1:00 pm, and must include a bid security of at least 10 percent of the total bid price. The successful bidder is required to provide performance and payment bonds equal to 100 percent of the contract price and must comply with California prevailing wage requirements and DIR registration. Additionally, the contractor must utilize the Virtual Project Manager system for submittals and maintain comprehensive insurance coverage, including Commercial General Liability and Workers Compensation. As a federal-aid construction project, the contract mandates strict adherence to FHWA-1273 provisions, including nondiscrimination and equal employment opportunity policies.
Capital Projects - Construction

POSTED

about 6 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

This project involves a general contractor providing construction services to convert existing laboratory space at Discovery Park, located at 3940 N. Elm Street, Denton, Texas, into a flexible research laboratory for incoming faculty. The scope includes transforming the high-bay room D170 into a research environment capable of supporting both wet and dry bench research, with the wet lab featuring chemical fume hoods and the dry lab separated physically for safety and functionality. A key feature of the renovation is the addition of a structured mezzanine, approximately 3,000 square feet, supported by structural steel columns that utilize existing piers, with the mezzanine level aligning with the current second floor. The project also encompasses necessary architectural finishes and power systems in accordance with UNT design standards for the new IDF room, though data cabling and related equipment will be handled separately by UNT vendors. The construction is scheduled to commence in July 2025, with an anticipated substantial completion by May 2026. The contract value is estimated between one million and five million dollars, and the project is managed by the University of North Texas System. Interested contractors are invited to respond to the solicitation by June 3, 2025. The scope emphasizes flexibility for future research needs, safety, and compliance with UNT guidelines, ensuring the space is adaptable for evolving research activities. The primary point of contact for this project is Sheryl Robbins, reachable via email or phone for further inquiries.

Documents

8

RFCSF752-25-1010ER UNT Discovery Park D170 Research Lab Buildout

PDF, High priority: read this firstpresolicitation
High

RFCSP752-25-1010ER UNT Discovery Park D170 Research Lab Buildout

PDF, High priority: read this firstrfp
High

RFCSP752-25-1010ER: UNT Discovery Park D170 Research Lab Buildout

PDF, High priority: read this firstrfp
High

RFCSP752-25-1010 ERUNT Discovery Park D170 Research Lab Buildout - Notice of Schedule Change

PDF, High priority: read this firstamendment
High

UNT Discovery Park D170 Fit-Out Project Manual

PDF, High priority: read this firstspecifications
High

RFCSP752-25-1010ER UNT Discovery Park D170 Research Lab Buildout - Drawings Notice

PDF, Low priorityspecial-notice
Low

RFCSP752-25-1010ER UNT Discovery Park D170 Research Lab Buildout Pre-Solicitation Meeting Sign-in

PDF, Low priorityindustry-day
Low

RFCSP752-25-1010ER - UNT Discovery Park D170 Site Walk Sign In Sheets

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → University North Tx/system Adm
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
This project is for a general contractor to provide general constructionservices for the buildout pf research laboratory space for incoming faculty. Discovery Park is located at 3940 N. ElmStreet, Denton, Texas 76207. This project is to convert the existing high-bay room D170 into researchspace to support both wet and dry bench research and a small amount ofadministrative space in support of the laboratories. The labs will be flexible in nature toaccommodate future needs and changes in research. The wet research lab will include ChemicalFume Hoods. The dry bench research labwill be physically separated from the web research lab. To accommodate the proposed renovation, theexisting D170 space will include a structured mezzanine of approximately3,000SF (50’ x 60’). The mezzanine willbe supported by structural steel columns reutilizing existing piers installedbelow the first-floor level. The mezzanineelevation will align with the current Level 2.All data cabling, card readers, termination and devices, as well as anynew equipment (such as racks) in the newIDF room, will be by UNT vendor and are not part of this contract. Power and architectural finishes per the UNT designguidelines for the new IDF room are included in the scope of work.Anticipated start date July 2025; the substantial completion of this project is expectedby May 2026.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS