Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on October 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UOSA IFB 27-01 GAC Treatment Optimization

Closed
IFB-127897State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The GAC Treatment Optimization project, issued by the Upper Occoquan Service Authority in Centreville, Virginia, is a two-phase construction effort governed by the Virginia Public Procurement Act. Phase 1 focuses on retrofitting one L/2 Building carbon contactor with two cells to create a per- and polyfluoroalkyl substances pilot study system, restoring upflow and downflow operating capabilities via underdrain nozzle modifications, and conducting a proof-of-concept evaluation for carbon transfer improvements. If authorized, Phase 2 will expand these improvements to the remaining seven carbon contactors. The contract is awarded as a lump sum to the lowest responsive and responsible bidder, with a specific bid allowance of 25,000 dollars for authorized concrete repairs. Compliance requirements are extensive, including adherence to Davis-Bacon Labor Standards, the Build America, Buy America Act for iron, steel, and manufactured goods, and the Drug-Free Workplace Act. Bidders must demonstrate good-faith efforts to solicit certified Disadvantaged Business Enterprises as a condition of award. The contractor is required to provide performance and payment bonds, as well as insurance certificates. Payment is processed via an Application for Payment, with approved partial payments issued within 30 days of the Engineer's recommendation, subject to a 5,000 dollar minimum for unincorporated materials. All work is subject to inspection by the Owner and Engineer to ensure strict compliance with contract documents prior to substantial completion.

General Info

Two-phase GAC treatment optimization project for carbon contactors in Centreville, Virginia.

Documents

4

IFB 27-01 Addendum #1 - GAC Treatment Optimization

PDF, High priority: read this firstamendment
High

IFB 27-01 UOSA GAC Treatment Optimization

PDF, High priority: read this firstifb
High

UOSA IFB 27-01 Addendum #2 - GAC Treatment Optimization

PDF, High priority: read this firstamendment
High

UOSA IFB 27-01 Addendum #3 - GAC Treatment Optimization

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 6, 2026 to Oct 8, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → Upper Occoquan Service Authority
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Phase 1 of the GAC Treatment Optimization Project includes, but is not limited to, retrofitting one L/2 Building carbon contactor, consisting of two cells, to serve as the per- and polyfluoroalkyl substances (PFAS) pilot study system; restoring upflow and downflow operating capability through modifications to the existing underdrain nozzle system; and implementing a proof-of-concept evaluation for carbon transfer improvements. If authorized by the Owner, Phase 2 of the Project will include, but is not limited to, retrofitting the remaining seven carbon contactors (i.e., fourteen cells) with the selected improvements based on the results of Phase 1. A complete description of the Work can be found in the Contract Documents.

More opportunities from Virginia → Upper Occoquan Service Authority

Same awarding agency

NAICS: 237990
SLED
UOSA IFB 27-02 P2NR+ Construction
Solicitation # 27-02
The Upper Occoquan Service Authority (UOSA) is soliciting bids for the Phase 2 Nitrogen Removal Plus Other Interim Process Improvements (P2NR+) project at the Millard H. Robbins, Jr. Regional Water Reclamation Plant in Centreville, Virginia. This construction project focuses on nitrogen management process improvements and various renewal and replacement tasks. Major scopes of work include replacing eight screw pumps at Primary Effluent Lift Stations 55/1 and 55/2, upgrading two RAS pumps at Pump Station 9/1, implementing cyclone and settleability improvements at Selector Basins 56/1 through 56/7, and replacing secondary clarifier mechanisms for units 6/5 and 6/6. Additionally, the project involves replacing electrical equipment in Load Centers 1 and 8, replacing a primary sludge pump in Station 54/2, and performing associated piping and electrical upgrades across aeration basins, pump stations, and site galleries. Governed by the Virginia Public Procurement Act, the contract will be awarded to the lowest responsive and responsible bidder based on total cost. Qualified bidders must be licensed in the Commonwealth of Virginia and demonstrate significant experience, including at least one wastewater treatment facility rehabilitation project valued at $25 million or more completed within the last five years. The project requires a Project Manager and Superintendent each possessing ten years of experience in complex wastewater construction. Bids are submitted as a lump sum and must include a Virginia Bid Bond, with performance and payment bonds required upon contract signing. The bid structure includes $775,000 in owner allowances for structural concrete repair, conduit replacement, mechanical and electrical work, and hazardous materials mitigation. Substantial completion is defined by seven continuous days of successful, trouble-free operation following all functional performance tests.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS