Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Upcoming Construction Requirements: Design-Build to Budget (DBtB) with Other Transaction Authority (OTA) & Progressive Design-Build (PDB) with OTA

Active
W9128A-27-Z-1CT5Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers Honolulu District has issued a special notice for informational and planning purposes regarding several anticipated construction requirements in Oahu, Hawaii. Procurement planning for these projects is expected to begin in the first quarter of FY27. The requirements are divided into four main categories utilizing Other Transaction Authority, featuring both Progressive Design-Build and Design-Build to Budget delivery methods. Key projects include a non-organizational vehicle parking garage at Tripler Army Medical Center estimated at 207.6 million dollars and a Combined Operations Center at Joint Base Pearl Harbor Hickam estimated at 248 million dollars. Additionally, multiple water infrastructure projects are planned for the Helemano Military Range, Fort Shafter, Schofield Barracks, and Aliumanu Military Reservation, with individual project values ranging from 1 million to 104 million dollars. No solicitations are currently available, and interested parties are advised to monitor official announcements for future market research and submission instructions.

General Info

US Army Corps planning Oahu construction projects for FY27 totaling over 460 million dollars.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Shafter, HI, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Honolulu
Contacts2 people available
OfficeFORT SHAFTER, HI, 96858-5440, USA
Office AddressFORT SHAFTER, HI, 96858-5440, USA

Full Description

Show more

THIS NOTICE IS FOR INFORMATIONAL AND PLANNING PURPOSES ONLY, TO ALLOW INTERESTED PARTIES TO PREPARE FOR FUTURE OTHER TRANSACTIONAL AUTHORITY (OTA) NOTIFICATION.


The U.S. Army Corps of Engineers (USACE) Honolulu District is issuing this special notice to announce the following anticipated upcoming OTA requirements:


  • OTA #1: FY29 PN108808 Non-Org Vehicle Parking Garage, Tripler Army Medical Center, Oahu, Hawaii
    • Estimated Start of procurement planning: Quarter 1 of FY27 
    • Industry Day Announcement has been issued in SAM.gov under Notice ID W9128A279A001
    • OT Type: Progressive Design-Build (PDB)
    • Estimated Programmed Amount: $207.6M
  • OTA #2: Project Titles (1) FY24 MCA PN98748 Water Wells and Storage Tank at Helemano Military Range, Oahu, Hawaii, (2) FY24 MCA PN104030 Clearwell & Booster Pump, Fort Shafter, Oahu, Hawaii, (3) FY24 MCA PN101244 Elevated Water Storage Tank, East Range, East Range, Schofield Barracks, Oahu, Hawaii, and (4) FY24 MCA PN103952 Elevated Water Storage Tank, Kolekole, Schofield Barracks, Oahu, Hawaii
    • Estimated Start of procurement planning: Quarter 1 of FY27
    • OT Type: Desgin-Build to Budget (DBtB)
    • Estimated Programmed Amounts: (1) $104M, (2) $93M, (3) $41M, and (4) $41M
  • OTA #3: Project Titles (1) FY24 AMR Potable Water Storage Water Tank  (North Tank), Aliumanu Military Reservation (AMR), Oahu, Hawaii, (2) Repair Above-Ground 8" Cast Iron Water Line to AMR 181 Tank, AMR - FY27 SRM, AMR, Oahu, Hawaii, and (3) Tank 181, AMR - FY27 SRM, AMR, Oahu, Hawaii
    • Estimated Start of procurement planning: Quarter 1 of FY27
    • OT Type: DBtB
    • Estimated Programmed Amounts: (1) $20.68M, (2) $1.804M, and (3) $1M
  • OTA #4: FY29 PACAF Combined Operations Center, JBPHH (KNMD280002), Joint Base Pearl Harbor Hickam, Oahu, Hawaii
    • Estimated Start of procurement planning: Quarter 1 of FY27 
    • OT Type: PDB
    • Estimated Programmed Amount: $248M

No solicitations are currently available, and the information provided in this notice is subject to change.


All interested parties should monitor related announcements for future market research which will provide interested parties with an opportunity to provide feedback. Interested parties should also monitor related announcements for future official solicitation announcements, which will provide complete details and submission instructions.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming lighting controls, and replacing variable air volume systems. The project also encompasses repainting interior surfaces, correcting plumbing deficiencies, and providing new signage for all spaces. While the primary focus is Building 262, the project includes a base requirement for Building 261 and an option for Building 263. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be based on a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. Contractors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to Davis-Bacon wage determinations and ADA accessibility guidelines. Proposals must be submitted electronically to the contracting officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000, managed by the Bristol Alliance of Companies, is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, specifically paving removal and replacement, as well as drainage, water, sanitary, and storm system repairs. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving replacement. Proposals are due by November 23, 2026. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. The contractor must adhere to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Quality control is strictly managed through a three-phase process, and invoicing must be processed via Wide Area Work Flow with detailed supporting documentation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 29 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 24, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is designated as Riverside or Los Angeles. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to six Good Faith Effort (GFE) requirements. Critical mandates include posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening, as well as demonstrating the utilization of the Small Business Administration and the Minority Business Development Agency. Proof of these specific efforts must be included in the bid package. While outreach documentation may be submitted up to three business days after the closing date, failure to complete the primary GFE steps before the opening date will result in the bid being rejected.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and the installation of an underground stormwater retention system. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, and rubber wall base installation, as well as necessary plumbing and electrical work to restore dormitory rooms, offices, and common areas to their original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, evaluated through a 100-point system consisting of price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance, and compliance with Davis-Bacon Act wage determinations, NFPA-101 life safety codes, and EPA and OSHA regulations. Proposals must include a detailed cost breakdown for labor, materials, and equipment, a timeline for substantial completion, and a 90-day bid guarantee.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at Naval Submarine Base New London in Groton, Connecticut, involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, foundations with rigid inclusions and load transfer mats, reinforced concrete floors, and comprehensive grounding, lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and buildings 524 and 393. The project duration is 1828 calendar days and encompasses extensive sitework, including clearing, rock excavation, grading, and wetland mitigation. Infrastructure improvements involve the installation of access roads, paved loading areas, landscaping, and a full electrical utility network featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories and is managed by J & J Contractors, Inc. Interested parties must contact the primary point of contact to receive bid invitations and access necessary documentation before the response deadline.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of Defense → W2SN Endist Honolulu

Same awarding agency

NAICS: 236220
New
Federal
$495M Small Business Multiple Award Task Order Contract for Design-Build and Design Bid-Build Construction Services for the State of Hawaii, U.S. Army Corps of Engineers, Honolulu District
Solicitation # W9128A26RA007
The U.S. Army Corps of Engineers, Honolulu District, is soliciting a 100% Small Business Set-Aside Multiple Award Task Order Contract (MATOC) for Design-Build and Design-Bid-Build construction services across the State of Hawaii. This Indefinite Delivery, Indefinite Quantity (IDIQ) vehicle has a total cumulative capacity not to exceed 495 million dollars, with individual firm-fixed-price task orders estimated to range from 2,000 dollars to 35 million dollars. The contract consists of a five-year base period with one six-month option to extend. The scope of work encompasses general construction, including electrical and instrumentation, structural efforts, demolition, site restoration, and safety remediation such as asbestos and lead-based paint abatement. The government intends to award five to seven contracts using a two-phase best value trade-off selection process. Phase 1 evaluates offerors based on past performance, organization and management, and a go/no-go bonding requirement. Phase 2 focuses on a seed project involving a construction narrative, drawings, a schedule, and price. Once the MATOC is established, task orders will be awarded based on criteria including price, schedule, technical solutions, and innovation. Performance requires adherence to Davis-Bacon Act labor standards, Buy American requirements, and strict quality control plans, with final acceptance contingent upon a multi-stage government inspection process. Proposals must be submitted via the Procurement Integrated Enterprise Environment (PIEE) in searchable PDF format.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 3 months
View Details
NAICS: 236220
Federal
FY29 PN108808 Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center on Oahu, Hawaii
Solicitation # W9128A279A001
The U.S. Army Corps of Engineers is seeking a qualified partner for the design and construction of a Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center in Oahu, Hawaii. This project is intended to partially mitigate a parking shortfall of 2,161 spaces and will be executed using a Progressive Design-Build approach under Other Transaction Authority. The scope of work encompasses the full design and construction of the facility, including comprehensive site improvements such as grading, utilities, storm drainage, roadway connections, pedestrian sidewalks, landscaping, and exterior lighting. The resulting facility must be designed for a minimum lifespan of 40 years and adhere to DoD Unified Facilities Criteria regarding energy efficiency, building envelope, and integrated systems performance. The acquisition will utilize a streamlined two-step competitive selection process. In the first step, interested offerors will submit a Statement of Qualifications in the form of a White Paper, from which the government intends to down-select three of the best-qualified offerors. These selected firms will then be invited to provide Pitch Presentations as the final evaluation phase. The resulting agreement will be Firm-Fixed-Price, with costs for successive design and construction milestones agreed upon as the design progresses. The project is divided into two phases: the first focusing on design and pre-construction services, and the second covering final design and construction. An Industry Day is scheduled for November 17, 2026, with a target award date anticipated between April and May 2027.
Commercial and Institutional Building Construction

POSTED

9 days ago

DEADLINE

in 20 days
View Details
NAICS: 531120
Federal
Military Recruiting Lease for office space 5,300 to 5,800 SF required
Solicitation # DACA455270014200
The U.S. Army Corps of Engineers, Honolulu District, is soliciting proposals for a full-service, turnkey lease of 5,300 to 5,800 gross rentable square feet of office space for Armed Forces Recruiting purposes in Honolulu, Hawaii. The required space must be located within a delineated area bounded by River Street to the north, Ward Avenue to the south, Ala Moana Boulevard to the east, and South Vinyard Boulevard to the west. The lease term is four years and eleven months, with the government maintaining termination rights. Key facility requirements include 24-hour unrestricted access, comprehensive communications infrastructure, a secondary exterior exit, and lighted parking for approximately twelve government vehicles, with additional private vehicle parking available within a four-block radius. The award will be based on the best value, weighing price and technical factors, such as location and neighborhood quality, equally. All construction and safety enhancements must be treated as tenant improvements with no government reimbursement. The lessor is responsible for all operating costs, real estate taxes, and insurance, including a public liability limit of at least 1 million dollars. Compliance with ADA/ABAAS accessibility standards and specific seismic safety objectives is mandatory. Interested offerors must be registered in the System for Award Management and submit their electronic proposals to the designated point of contact by November 15, 2026.
Lessors of Nonresidential Buildings (except Miniwarehouses)

POSTED

19 days ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS