Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The Foothill/Eastern and San Joaquin Hills Transportation Corridor Agencies are soliciting proposals for a firm to provide, operate, and maintain a Roadside Toll Collection System (RTCS). The scope of work encompasses the design, engineering, procurement, installation, and management of the system, specifically focusing on the All Electronic Tolling (AET) replacement and the SR 241/SR 91 Express Connector. The project is divided into three pricing options: Option A for AET replacement, Option B for the Express Connector, and Option C for both. The selected contractor will be responsible for vehicle identification, image capture, and the implementation of roadside host systems, while ensuring compliance with technical standards such as IEC 60529 for ingress protection and MIL-STD for shock and vibration.
The contract structure includes an implementation phase and a ten-year maintenance phase, with potential extensions for one five-year period and five subsequent one-year periods. Key milestones range from a projected notice to proceed in June 2027 to final system acceptance in March 2031. Payment is tied to specific milestones, such as the kick-off meeting and successful completion of Factory Acceptance, First Installation, and System Acceptance Tests. Proposers must have been in business for at least five years and are required to provide performance and payment bonds. Evaluation will be based on innovation, value add, proposal quality, and validated references, with the agency reserving the right to request best and final offers.
General Info
Proposals for design, operation, and maintenance of a Roadside Toll Collection System.
PDF, High priority: read this first355 pages · sow
HighAI Summary for Attachment A - Roadside Toll Collection System (RTCS) SOW Addendum 1: This document is Addendum 1 to the Scope of Work (SOW) for the San Joaquin Hills Transportation Corridor Agency's Roadside Toll Collection System (RTCS), dated November 2026. It details the requirements for the AET replacement and Express Connector, covering system functional requirements, technical specifications for vehicle identification and detection, project management, and installation schedules.
PDF
PDF, High priority: read this first108 pages · modification
HighAI Summary for Contract K001636 - Roadside Toll Collection System (RTCS) Addendum 1: This document is a contract addendum (redline version) for the Roadside Toll Collection System (RTCS) between the Foothill/Eastern Transportation Corridor Agency, the San Joaquin Hills Corridor Agency, and a contractor. It outlines project documents, contractor obligations, payment milestones, risk allocation, and insurance requirements for the implementation and maintenance phases.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for K001636 Attachment C - Compensation Schedule: This document is Attachment C, the Compensation Schedule for the San Joaquin Hills Transportation Corridor Agency's Roadside Toll Collection System (RTCS). Dated September 2026, it outlines the payment milestones and percentage-based payment schedules for three project options: Option A (AET Replacement), Option B (Express Connector), and Option C (AET Replacement and Express Connector). It details payments for implementation costs, hardware, equipment, and licenses tied to specific project milestones such as kick-off meetings, design approvals, and system acceptance tests.
PDF
PDF, High priority: read this first32 pages · specifications
HighAI Summary for K001636 Attachment D - Abbreviations and Definitions: Attachment D for the San Joaquin Hills Transportation Corridor Agency's Roadside Toll Collection System (RTCS) RFP. This document provides a comprehensive glossary of abbreviations and defined terms used throughout the RFP and associated contract documents, covering technical tolling terminology, agency identifiers, and legal definitions.
XLSX
XLSX, High priority: read this first32 pages · specifications
HighAI Summary for K001636 Attachment F-13: Requirements Conformance Matrix: This document is a Requirements Conformance Matrix (Attachment F-13) for solicitation K001636. It provides detailed instructions and a structured template for proposers to indicate their level of compliance with the System Functional Requirements for the Roadside Toll Collection System (RTCS), covering Option A (AET), Option B (Express Connector), and Option C (Both). Proposers must categorize each requirement as Base Product (B), Base Modified (M), New Development (D), or Not Provided (N).
XLSX
XLSX, High priority: read this first73 pages · specifications
HighAI Summary for K001636 Attachment F-14 Compensation Proposal Form - Option A: A detailed compensation proposal form and cost schedule for the Roadside Toll Collection System (RTCS) project. The document includes a Table of Contents and templates for project cost summaries, implementation costs, operations and maintenance (O&M) services, and image review services, specifically tailored for Option A (AET Replacement).
XLSX
XLSX, High priority: read this first66 pages · specifications
HighAI Summary for K001636 Attachment F-14 Compensation Proposal Form - Option B: A detailed compensation proposal form (Attachment F-14) for the Roadside Toll Collection System (RTCS) project, specifically Option B (Express Connector). The document includes cost summary sheets for implementation, roadside systems, host systems, software, O&M services, and image review services, as well as staff rate schedules.
XLSX
XLSX, High priority: read this first98 pages · specifications
HighAI Summary for K001636 Attachment F-14 Compensation Proposal Form - Option C: A detailed compensation proposal template for the Roadside Toll Collection System (RTCS) project. The document includes cost summary sheets for implementation, roadside systems, host systems, software, operations and maintenance (O&M) services, and image review services, specifically tailored for Option C (AET Replacement and Express Connector).
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for K001636 Attachment G - Compensation Proposal Instructions: Dated September 2026, this document provides detailed instructions for proposers to complete the Compensation Proposal Forms for the San Joaquin Hills Transportation Corridor Agency's Roadside Toll Collection System (RTCS). It outlines the requirements for submitting pricing for implementation, operations, maintenance, and image review services across multiple project options (A, B, and C), and specifies the use of Excel-based forms and PDF submissions.
PDF
PDF, High priority: read this firstsow
HighAI Summary for K001636 - Roadside Toll Collection System (RTCS) SOW: Statement of Work for the Foothill/Eastern and San Joaquin Hills Transportation Corridor Agencies regarding the Roadside Toll Collection System (RTCS). The document details the scope for AET replacement and Express Connector implementation, including functional requirements for vehicle identification, image capture, roadside host systems, installation schedules, and comprehensive documentation and maintenance requirements.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for RFP K001636 - AET Sample Reports: This document contains sample report formats and data fields for the Roadside Toll Collection System (RTCS) as part of RFP No. K001636 for the Foothill/Eastern and San Joaquin Hills Transportation Corridor Agencies. It includes templates for Traffic by Payment Type, Daily Finance, and Traffic by Hour reports.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for RFP K001636 Attachment E - Preliminary Implementation Phase Milestone Schedule: This document is Attachment E to RFP No. K001636 for the Roadside Toll Collection System (RTCS) for the Foothill/Eastern and San Joaquin Hills Transportation Corridor Agencies. Dated September 2026, it provides a preliminary implementation milestone schedule spanning from the Notice to Proceed in June 2027 through final system acceptance in March 2031. Key milestones include project planning, system design, development, and the phased installation and go-live dates for the Express Connector (November 2029) and AET Toll Zones (December 2030).
DOCX
DOCX, High priority: read this first30 pages · rfp
HighAI Summary for RFP K001636 - Attachment F Forms Package: This document contains the forms package for RFP No. K001636 for a Roadside Toll Collection System (RTCS) issued by the Foothill/Eastern and San Joaquin Hills Transportation Corridor Agencies. It includes a comprehensive RFP Checklist (Attachment F-1) detailing required proposal components, such as technical documentation, financial statements, and certifications, as well as a template for the Proposal Letter (Attachment F-2).
PDF
PDF, High priority: read this first46 pages · rfp
HighAI Summary for RFP K001636: Roadside Toll Collection System (RTCS): Request for Proposals (RFP K001636) issued in September 2026 by the Foothill/Eastern and San Joaquin Hills Transportation Corridor Agencies for a Roadside Toll Collection System (RTCS). The document outlines the solicitation schedule, including a mandatory pre-proposal meeting on 10-7-2026 and a proposal submittal deadline of 12-9-2026. It includes detailed sections on proposal requirements, technical specifications, and a comprehensive scope of work with 16 attachments covering traffic volumes, network diagrams, and interface control documents.
PDF
PDF, Low priority104 pages · contract-document
LowAI Summary for Contract K001636 - Roadside Toll Collection System (RTCS): This document is the Form of Contract (Attachment B) for Contract No. K001636 between the Foothill/Eastern Transportation Corridor Agency, the San Joaquin Hills Corridor Agency, and a contractor. It outlines the terms for the design, supply, installation, and maintenance of a Roadside Toll Collection System (RTCS), including project documents, contractor obligations, payment milestones, and risk allocation.
XLSX
XLSX, Low priority1 page · q-and-a
LowAI Summary for K001636 - Attachment F-12 Submittal of Questions Form: A standardized template form (Attachment F-12) for proposers to submit formal questions regarding solicitation K001636. The document includes fields for proposer name, date of submission, and a table to track specific RFP/contract sections, page numbers, and the corresponding agency responses.
PDF
PDF, Low priority64 pages · q-and-a
LowAI Summary for San Joaquin Hills TCA Roadside Toll Collection System QA Set 1: A question and answer document for the San Joaquin Hills Transportation Corridor Agency's Roadside Toll Collection System (RTCS) procurement. It contains proposer inquiries and agency responses regarding the RFP and Contract (Attachment B), covering topics such as inflation, limitation of liability, liquidated damages, intellectual property, and licensing requirements.
Scope: The Foothill/Eastern Transportation Corridor Agency and the San Joaquin Hills Transportation Corridor Agency (jointly referred to herein as “TCA” or “Agency”) to engage the services of a firm to provide, operate and maintain a Roadside Toll Collection System (“RTCS”, “System”, or the “Services”) as more specifically described in Attachment A Scope of Work and Requirements (“Scope of Work”). Bid Bond: 0.00%