This Solicitation opportunity from Minnesota was posted on March 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Upgrade Fire Alarm System at MCF Lino Lakes
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a comprehensive upgrade of the fire alarm system at the Minnesota Correctional Facility in Lino Lakes, executed under a single prime electrical construction agreement. The scope includes replacing the existing fire alarm system throughout the entire facility, with modifications to alarm and notification devices as specified, while reusing existing copper wiring and conduit where possible. Additional conduit and wiring will be installed to accommodate new devices, and the new fire alarm panels will be connected to the existing single-mode fiber optic cable already in place, ensuring integration with the current communication infrastructure. The project is part of a solicitation issued by the Minnesota Department of Administration, with a contract value estimated between $500,000 and $1,500,000. The solicitation was posted on March 27, 2025, with a response deadline of May 6, 2025. The project aims to enhance safety and compliance through a modernized fire alarm system, with the primary point of contact being Craig Fernholz, an Acquisition Management Specialist. The work is situated within Minnesota and is managed under the NAICS code 335921, which pertains to electrical equipment manufacturing and installation.
General Info
Agency
Place of Performance
MN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
A. The work will be done under one prime contract that includes: Electrical construction.
B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract.
1. Replace the existing fire alarm system with a new fire alarm system throughout the entire facility. Add and delete alarm and notification devices as noted and reuse existing copper wiring and conduit. Add additional conduit and wire for new devices. Connect new fire alarm panels to existing single mode fiber optic cable already installed.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
