Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

US-101 AC Digouts and Resurfacing Project (EA 2X730)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The US-101 AC Digouts and Resurfacing Project (EA 2X730) is a forecast project managed by Caltrans District 4 in the Bay Area/Oakland region. The scope of work involves the digouts of damaged asphalt concrete and subsequent resurfacing with new asphalt concrete on US-101 in San Jose, Santa Clara County. The project area extends from 0.5-mile north of the Bernal Road Undercrossing to the Coyote Creek Bridge, covering post miles R27.5 to 36.7. The primary objectives are to preserve the roadway and improve ride quality for the traveling public. All construction activities will be performed within the existing Caltrans right of way on the paved roadway, and any removed pavement striping or delineation will be replaced. The project is scheduled for the summer construction season, beginning in May 2026 and concluding by September. Required equipment for the project includes AC trucks, grinders, loaders, pavers, and rollers, with staging to occur in non-vegetated areas within the Caltrans right of way. This project is classified under NAICS code 237310 and has been filed as exempt under PRC 21084 and 14 CCR 15301 Class 1(c) for existing facilities, as no environmental impacts are anticipated. The primary point of contact is Juliane Smith, Senior Environmental Scientist.

General Info

Caltrans to resurface US-101 in Santa Clara County summer 2026 under state funding with no federal constraints.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

San Jose, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for US-101 AC Digouts and Resurfacing Project EA 2X730

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Juliane SmithSenior Environmental Scientist (NEPA/CEQA Specialist)

Full Description

Show more
Caltrans proposes digouts of existing damaged asphalt concrete (AC) and then resurfacing with new AC on US-101 from 0.5-mile north of Bernal Road Undercrossing to Coyote Creek Bridge in Santa Clara County. The work is intended to preserve the roadway and improve ride quality for the traveling public. All construction work will remain within Caltrans right of way on the existing paved roadway. Construction equipment to be used includes, but is not limited to, AC trucks, grinders, loaders, pavers, and rollers. Construction equipment shall be staged within Caltrans ROW in areas absent of vegetation. Any removed delineation or pavement striping will be replaced. The project will be constructed during the summer construction season, beginning in May of 2026, and will be completed by September.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS