Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

US-101 Highway Maintenance Safety Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 7 is planning a highway maintenance safety project along US-101 in Ventura County, stretching from the Westlake Village Overcrossing to the Seacliff SR-1 and US-101 separation, covering postmiles 0.5 to R39.3. The project aims to enhance safety by installing Wrong Way Driver Prevention Measures, improving pedestrian and bicycle safety features, and adding Horizontal Alignment Curve Warning Signs at freeway exit and entrance ramps. All work will involve excavation to a maximum depth of five feet, with no relocation of public utilities or acquisition of new right-of-way. The initiative is designed to reduce accidents and improve traveler safety without altering existing infrastructure boundaries or utility networks. The project has been posted as a forecast on June 25, 2026, and is being managed by Caltrans in collaboration with its Los Angeles district. Christopher Laurel, Senior Environmental Scientist (Specialist), serves as the primary point of contact for inquiries, reachable via phone or email. Although no solicitation number, NAICS code, or set-aside details are provided, the project is positioned as a proactive safety enhancement under Caltrans’s maintenance and infrastructure improvement priorities. All work is confined to the existing right-of-way, ensuring minimal disruption and no additional land acquisition.

General Info

Caltrans to enhance US-101 safety in Ventura County with wrong-way driver measures, curve warnings, and pedestrian/bike improvements within existing right-of-way.

Agency

California → Caltrans, District 7 - Los Angeles

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Westlake Village, CA

Set-Aside

NONE

Documents

(1)

07-0Y800-VEN101-CE Highway Maintenance Safety Project CEQA/NEPA Determination

PDFcategorical-exclusion-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Christopher LaurelSenior Environmental Scientist (Specialist)

Full Description

Show more
Caltrans is proposing a Highway Maintenance Safety Project on US-101 from Westlake Village Overcrossing to Seacliff SR-1 and US-101 separation at various locations between postmile 0.5 to R39.3 in Ventura County. The proposed work would include installation of Wrong Way Driver Prevention Measures, Pedestrian and Bicycle Safety Enhancements, and Horizontal Alignment Curve Warning Signs at freeway exit and entrance ramps. Excavation is proposed to a maximum depth of 5 feet. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
Gallinas Canyon Road Reconstruction
Solicitation # AP-Gallinas-MR
The USDA Forest Service is conducting market research for the Gallinas Canyon Road Reconstruction Phase II project within the Santa Fe National Forest in New Mexico, targeting qualified firms capable of delivering a complex, multi-disciplinary transportation infrastructure effort following the catastrophic 2022 Hermits Peak and Calf Canyon Fire. The road, designated NFSR 263, serves as a critical access route and crosses Gallinas Creek—the primary drinking water source for Las Vegas, New Mexico—and has suffered severe damage from post-fire flooding, necessitating extensive reconstruction including the replacement of 14 bridges and five major retaining-wall complexes in a narrow, mountainous, and environmentally sensitive canyon. The anticipated construction value exceeds $10 million, and the Government is seeking industry input on capability to deliver an integrated approach spanning design development from 30 percent through final design, procurement preparation, construction, and full construction administration under an accelerated timeline targeting a procurement-ready package by September 2027 and construction completion by 2030. Respondents are required to demonstrate extensive experience in large-scale roadway and bridge reconstruction within post-disaster, high-elevation terrains, with specific emphasis on geotechnical and hydraulic expertise, including advanced 2D hydrologic modeling for post-wildfire sediment and flood dynamics. The request seeks detailed information on organizational capacity to mobilize concurrent staffing across engineering disciplines, specialized mountain drilling and lab testing capabilities, construction inspection and materials testing, environmental compliance, and stakeholder coordination across federal, state, and local entities. Companies must indicate their ability to meet the tight schedule, outline potential constraints related to workforce, supply chain, permitting, or environmental mitigation, and specify their preferred contracting approach—whether as prime, joint venture, or subcontractor. Small businesses are encouraged to detail direct performance capabilities and potential teaming arrangements. Responses must be submitted by August 14, 2026, and will inform the Government’s acquisition strategy without constituting a solicitation or binding obligation.
Region 3 Southwestern Regional Office

POSTED

1 day ago

DEADLINE

in 4 days
View Details