Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 3, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

US 101/SR 25 Phase 1 Improvements Project (Invitation for Bid)

Closed
00394State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Yolo Street Resurfacing Project
Solicitation # 20260930028
The Yolo Street Resurfacing Project, issued by the City of Corning, is a roadway rehabilitation effort located on Yolo Street from Houghton Avenue to Third Street in Corning, California. The scope of work includes roadway excavation, the application of rubberized chip seal, double layer fiberized microsurfacing, and asphalt concrete paving. Additionally, the project requires concrete improvements such as valley gutter replacement and minor rolled curb and gutter installation, as well as the application of thermoplastic striping for stop markings and limit lines per Caltrans standards. The contractor is responsible for developing and maintaining a Temporary Traffic Control plan and ensuring all work adheres to the 2025 Caltrans Standard Specifications and City of Corning design standards. The contract has an estimated construction cost of 647,244.30 dollars and a performance period of 35 working days. Bids are due by 2:00 PM on November 3, 2026, and will be awarded to the lowest responsible bidder, with a potential five percent local vendor preference applied for evaluation purposes. Requirements for bidders include a Class A license, registration with the Department of Industrial Relations, and compliance with prevailing wage rates. Financial security is mandated via a 10 percent bid security and 100 percent performance and payment bonds. The contract also stipulates liquidated damages of 3,600.00 dollars per day for delays and requires strict adherence to federal nondiscrimination, Clean Air Act, and Buy America provisions for steel and iron materials.
City of Corning

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
Install 6 New Bus Shelters
Solicitation # SPC26-20
The City of Paramount, California, is soliciting bids for project CIP 9672, which involves the installation of six new bus shelters at specific locations throughout the city. The scope of work includes the removal, demolition, and renovation of existing shelters and trash cans, as well as the construction of new improvements such as canopy shelters, site furnishings, paving, lighting, and electrical infrastructure. Key technical requirements include the installation of solar light electrical systems and concrete sidewalk paving totaling approximately 900 square feet. All work must be completed within 60 working days from the Notice to Proceed, with activities restricted to Monday through Friday, 7:00 a.m. to 3:30 p.m. The contract will be awarded to the lowest responsible bidder based on price, qualifications, and compliance with prevailing wage requirements. Bidders must be registered with the DIR and hold a valid State Contractor's License. Proposals must be submitted in a sealed envelope to the Office of the City Clerk by 10:00 a.m. on October 27, 2026, and must include a bid guarantee of at least 10 percent of the total bid amount. The successful contractor will be required to provide a Faithful Performance Bond and insurance certificates within 10 working days of the award. Compliance with equal employment opportunity and affirmative action standards is mandatory, and bidders must certify their status regarding Disadvantaged Business Enterprise (DBE) participation.
City of Paramount

POSTED

about 13 hours ago

DEADLINE

in 27 days
NAICS: 237310
New
SLED
Cat Canyon Creek Bridge No. 51P-500 Storm Damage Repairs
Solicitation # 25STM3-4N03
Solicitation 25STM3-4N03 is a project issued by the County of Santa Barbara Public Works Department Transportation Division for storm damage repairs to Cat Canyon Creek Bridge No. 51P-500, located in the 4th Supervisorial District. The scope of work involves construction activities to restore the bridge and surrounding areas in accordance with the 2025 Standard Specifications, 2025 Standard Plans, and the County's Engineering Design Standards. Bids are being accepted via the PlanetBids portal until October 15, 2026, at 2:00 PM, with options for lump sum, unit price-based, or cost plus time-based pricing. Bidders must provide security equal to at least 10 percent of the bid and submit a comprehensive subcontractor list for any entity providing quotes or performing work exceeding 1 percent of the total bid or 10,000 dollars. The project is subject to a rigorous Quality Assurance Program (QAP) and Independent Assurance Program to ensure all materials and workmanship meet contract specifications. Material acceptance is managed through field sampling, source inspections for high-risk structural items, and manufacturer certificates of compliance, including Buy American certifications. Compliance with the Americans with Disabilities Act (ADA) and various federal and state regulations is required, including Equal Employment Opportunity certifications and non-collusion affidavits. The Resident Engineer serves as the primary County representative responsible for construction oversight and materials certification.
County of Santa Barbara Public Works Department Transportation Division

POSTED

about 13 hours ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
Traffic Safety Flashing Stop Sign Program 2026
Solicitation # 20260930003
The Traffic Safety Flashing Stop Sign Program 2026 is a public works project for the City of Montclair, California, focused on enhancing road safety for motorists and pedestrians. The scope of work includes the installation of 21 solar LED flashing 30-inch stop sign assemblies and 3 solar LED flashing 36-inch stop sign assemblies, along with the removal and construction of approximately 371 square feet of new sidewalk. All work must adhere to City Standards 112 and 114, as well as the 2021 Edition of the Standard Specifications for Public Works Construction (Greenbook). The project must be completed by December 21, 2026, with a strict construction moratorium on major streets and around the Montclair Place Mall from November 21, 2026, to January 3, 2027. The contract will be awarded to the lowest responsible bidder based on the agency's estimated quantities. Bidders must demonstrate experience by listing at least three completed projects from the last five years and must provide a current contractor's license. Critical compliance requirements include California Air Resources Board fleet certifications, adherence to California Labor Code and Public Contract Code regulations, and the payment of prevailing wages. The successful contractor is required to provide both Faithful Performance and Payment bonds at 100 percent of the contract amount. Progress payments are issued monthly, provided the contractor submits itemized costs and prevailing wage reports. All project direction is managed by the City Engineer or her designee.
City of Montclair, California

POSTED

about 14 hours ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
Lower Spring Branch Stormwater Improvements
Solicitation # 14-0048-EN
The Lower Spring Branch Stormwater Improvements project, solicitation number 14-0048-EN, is a public works initiative by the City of Clearwater, Florida, aimed at flood reduction. The scope of work involves the replacement of bridges on Springtime Avenue and Overbrook Avenue, as well as the installation of a double 12' x 9' reinforced concrete box culvert on Douglas Avenue. The project includes extensive site work such as clearing and grubbing, removal of existing structures, and the installation of sediment and floating turbidity barriers. The contract period is set for 548 consecutive calendar days. The contract adopts the latest Florida Department of Transportation Standard Specifications for Road and Bridge Construction and the FDOT Design Manual, though project-specific general and technical specifications take precedence. Bidders must provide current state of Florida and Pinellas County licenses and registrations. The award will be granted to the lowest responsible and responsive bidder based on qualifications, pricing, and financial ability. Required bid submissions include a bid bond equal to 10 percent of the maximum bid price, a non-collusion affidavit, and certifications regarding E-Verify and business operations with Cuba and Syria. Technical requirements specify strict adherence to NPCA and PCI plant certifications for precast concrete elements, with specific shipping and storage mandates to ensure structural integrity. Environmental compliance is managed through a USACE Nationwide Permit 14, and root pruning must conform to ANSI A300 standards. Additionally, the contractor is responsible for providing fixed project signage and complying with the Florida Trench Safety Act, OSHA provisions, and City of Clearwater Ordinance No. 7918-08.
Public Works

POSTED

about 15 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The project involves extensive roadway improvements along SR 25 and US 101 in California, focusing on infrastructure upgrades and safety enhancements. Key components include constructing a new SR 25 overcrossing above US 101, replacing the existing structure, and developing a new interchange with on- and off-ramps. The project also entails realigning a segment of northbound US 101 near the SR 25 overcrossing, constructing a Class I bike path adjacent to the southbound US 101 off-ramp, and installing new traffic signals at ramp termini. Additional work involves building bridge structures, retaining walls, barriers, overhead signage, drainage systems, lighting, traffic monitoring, ramp metering, and other roadway features. The project will remove access to southbound US 101 at Castro Valley Road and Mesa Road, modify property access, and create new local roadway connections. An irrigation system and a one-year plant establishment period are also included. The total estimated construction cost ranges from $85 million to $94 million, and the contractor must have recent experience in civil and structural highway work within California. The project aims to improve traffic flow, safety, and multimodal access in the area, with a response deadline of August 16, 2024.

General Info

Documents

(3)

C24121: US 101/SR 25 Phase 1 Improvements Project

PDF•ifb

C24121 Volume II Technical Specifications - US 101/SR 25 Interchange

PDF•specifications

C24121_Volume_3_Contract_Drawings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → VTA Construction Contracts
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Project will consist of roadway improvements along SR 25 and US 101. Along SR 25, the Project begins near post mile (PM) 2.1, just west of UPRR crossing, and continues to PM 2.6, at the terminus of SR 25 at US 101.  Along US 101, Project improvements begin at PM 2.6, south of SR 25, and continue to PM 4.2, near Mesa Road.The Project includes the following key elements.Construct a new SR 25 overcrossing above US 101, just north of the existing SR 25 overcrossing, and  demolish the existing SR 25 overcrossing structure.Construct new US 101/SR 25 Interchange on-and off-ramps and demolish the existing southbound US 101 off-ramp structure to SR 25.Construct a slightly realigned portion of northbound US 101 at the SR 25 overcrossing.Construct SR 25 starting at the new overcrossing structure and conform with the existing alignment just west of the UPRR crossing.Construct a Class I bike path adjacent to the US 101 Southbound off-ramp between Castro Valley Road and SR 25.Construct new traffic signals at the US 101 ramp termini with SR 25.Construct bridge structures, retaining walls, barriers, overhead signs, drainage, lighting, traffic monitoring, ramp metering, and other roadway features.Construct an irrigation system and perform 1-year Plant Establishment Period.Remove access to southbound US 101 at both Castro Valley Road and Mesa Road.Remove and modify access to several properties and construct new local roadway or driveway connections.The Project will also require:Contractor to be experienced and have performed civil and structure work on State of California highways in the past five (5) years.  The estimated cost of construction for the Project is in the range of $85 million to $94 million.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS