This Solicitation opportunity from Oregon was posted on April 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
US 30 Steel Backed Timber Guardrail Repair
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the repair and reconstruction of Two Rail Steel Backed Timber Guardrail along US Highway 30, spanning mileposts 64 to 71 between Mosier and The Dalles, Oregon, damaged by the 2025 Rowena wildfire. The Oregon Department of Transportation (ODOT) will provide all timber and steel guardrail components as specified, while the contractor is responsible for furnishing all labor, equipment, traffic control, and incidental materials not supplied by ODOT. The scope includes salvaging and reusing existing steel rails and splice plates in conjunction with new timber materials, installation of posts and anchors, excavation and backfilling, application of two coats of protective paint to metal components, and adherence to specific traffic control measures during execution. Materials are staged at an ODOT maintenance station in The Dalles, with final inspection and acceptance occurring at the project site, ensuring compliance with the 2024 Oregon Standard Specifications for Construction and relevant ASTM standards. The solicitation, issued by ODOT Region 4 and posted on April 24, 2026, requires proposal submission by May 7, 2026, through Oregon’s electronic procurement portal. The contract employs ODOT’s unique specification sections as de facto contract clauses, featuring revised installation, coating, and timber handling requirements tailored to this wildfire recovery project. Payment is structured primarily on unit prices for timber posts and rails plus lump sum compensation for painting, with no retainage withheld. The contractor must mobilize within ten working days following the preconstruction conference and notice to proceed, coordinating material pickup and transport from the staging site to the work locations. Special emphasis is placed on maintaining material integrity during delivery and installation, including proper handling techniques, field-applied preservative treatments on timber cut and drilled surfaces, and adherence to stringent traffic control protocols. No formal federal acquisition clauses, security clearances, or key personnel designations are included, and the contract imposes no options or conflict-of-interest restrictions beyond the outlined technical and administrative requirements.
General Info
Agency
Place of Performance
Bend, OR, 97703, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Oregon → Region 4
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
