Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

US Highway 95 0.16 Mi South, Havasu Lake Rd North/0.21 Mi

Active
20260818049State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Bernardino County Department of Public WorksView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

San Bernardino, CA, 92415, USA

Set-Aside

NONE

Documents

(2)

H15280 US Highway 95 Special Provisions and Notice to Bidders

PDFspecial-provisions

H15280 US Highway 95 Construction Plans

PDFplans

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County Department of Public Works
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Bernardino County Department of Public Works
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #H15280: The project involves widening US 95 southbound for approximately 2380 feet, including the addition of a southbound left turn pocket at the Havasu Lake Road intersection and an 8-foot paved shoulder. Key work items include temporary traffic control, removal and cold planing of existing asphalt concrete surfacing, earthwork (clearing, grubbing, road excavation), placement of Class 2 aggregate base, and new asphalt concrete paving (Type A and Type G RHMA). Pavement full depth repair, rumble stripe installation, and various traffic striping (6-inch, 8-inch, double 6-inch) with recessed pavement markers are also required. The scope also covers water pollution control and sign relocation.

Similar Contracts

Same NAICS industry code

More opportunities from California → San Bernardino County Department of Public Works

Same awarding agency

NAICS: 237310
SLED
South Fontana ADA Ramps Project (Phase II)
Solicitation # H15027
The South Fontana ADA Ramps Project (Phase II) is a public works construction initiative led by the San Bernardino County Department of Public Works, aimed at enhancing accessibility and infrastructure compliance across multiple locations in the region. The project encompasses the installation of new and updated ADA-compliant ramps, curb and gutter systems, spandrels, and cross gutters, alongside full-area asphalt concrete removal and repaving. Additional scope includes traffic control system installation, roadside sign work, pavement markings, and other appurtenant construction activities, all governed by Caltrans 2025 Standard Specifications, Standard Plans, and the California MUTCD 2014. Work must adhere strictly to prevailing wage requirements under the Davis-Bacon Act and California Labor Code, with strict apprenticeship ratios requiring one apprentice for every five journeyman hours, and certified payroll records must be submitted through approved systems like LCP Tracker. All work is subject to on-site inspection and acceptance by the County, with quality standards tied to Caltrans sections 17, 22, 39, 40, 73, and 81–84, as well as material specifications for signage and delineation from approved lists. Contract compliance is enforced through a suite of state and federal mandates, including Equal Opportunity Clauses, Buy America provisions, and DBE/WBE/ESBE participation incentives. Contractors must submit proposals including 21 numbered forms (P-1 through P-21), subcontractor listings, and non-collusion declarations, signed by authorized representatives, through either hard copy delivery or the county’s ePro portal by September 3, 2026, with bid bonds submitted in person. While the contract references federal-aid highway funding and compliance with HUD and CDBG requirements, no specific contract value, CLIN structure, or pricing breakdown is provided. Financial administration requires Electronic Funds Transfer for payments, with apprenticeship contributions remitted to the California Apprenticeship Council, though no designated payment office, accounting codes, COR/COTR details, or invoicing platforms are named. All work occurs within the right-of-way of projects in San Bernardino County, specifically targeting Fontana, and must meet environmental compliance standards including ASTM Phase I ESAs and 24 CFR §§58.5 and 50.3(i). No unique or special contract requirements beyond standard state and federal public works obligations were identified.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 15 days
View Details