Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on March 28, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USACE SPK ARCF LAR Project 2 - Erosion Control, Bank Protection, and Stabilization Sites 2-2 and 2-3 - Sacramento, CA

Closed
W9123822B0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 6 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Sacramento, CA, 95825, USA

Set-Aside

NONE

Documents

17

B07+-+Site+Visit+Agenda+-+20220223.pdf

PDF

B07+-+Site+Visit+Sign-In+Sheet+20220224.pdf

PDF

B08+-+W9123822B0006+-+20220216.pdf

PDF

B08+-+W9123822B0006+-+Amendment+2+-+20220308.pdf

PDF

B08+-+W9123822B0006+-+Amendment+3+-+20220311.pdf

PDF

B08+-+W9123822B0006+-+Attachment+01+-+Plans+-+20220128.pdf

PDF

B08+-+W9123822B0006+-+Attachment+02+-+Specifications+-+20220127.pdf

PDF

B08+-+W9123822B0006+-+Attachment+04+-+Wage+Determination+20220204.pdf

PDF

B08+-+W9123822B0006+-+Attachment+04+-+Wage+Determination+20220225.pdf

PDF

B08+-+W9123822B0006+-+Attachment+05+-+Pre-Award+Survey+-+20220209.pdf

PDF

B08+-+W9123822B0006+-+LAR+C2+BORING+Information.pdf

PDF

B08+-+W9123822B0006+-+Plan+Amendment+1+-+20220308.pdf

PDF

B08+-+W9123822B0006+-+Solicitation+Amendment+4+-+20220317.pdf

PDF

B08+-+W9123822B0006+-+Specification+Amendment+1+-+20220308.pdf

PDF

B08+-+W9123822C0006+-+Attachment+03+-+Bid+Schedule+-+202220308.pdf

PDF

C04+-+SF+1409+-+Abstract+of+Offerors+-+W9123822B0006+-+20220328+signed.pdf

PDF

W9123822B0006+AMENDMENT+0001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline time changed from 2:00 PM UTC to 12:00 AM UTC on Mar 4, 2022. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Mar 16, 2022 to Mar 17, 2022. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 17, 2022 to Mar 21, 2022. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 21, 2022 to Mar 28, 2022. The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Sacramento
Contacts1 person available
OfficeSACRAMENTO, CA, 95814-2922, USA
Office AddressSACRAMENTO, CA, 95814-2922, USA
Contacts
Jennifer Wheelis Contract Specialist

Full Description

Show more
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement to provide bank protection and stabilization at Sites 2-2 and 2-3 at the American River Parkway. The American River Common Features (ARCF) Erosion Control, Lower American River (LAR) Project 2 is located at sites 2-2 and 2-3 along the right (east) bank of the American River Parkway in Sacramento, California. Site 2-2 is approximately 1,200 feet long and is located under the Howe Avenue Bridge. Site 2-3 is approximately 6,600 feet long and extends from the downstream side of the Campus Commons Golf Course to about 1,300 feet upstream of the Guy West Pedestrian Bridge. The anticipated project includes roughly 7,800 feet of stream bank protection and stabilization of the existing riverbank and levee to protect critical infrastructure against the effects of erosion during large flood events. Most vegetation will be cleared from the project footprint prior to construction. At Site 2-2, the Contractor will be required to clear remaining vegetation and stumps, grub, and strip the project footprint, place soil and rock revetment on the riverbank and levee face beneath Howe Avenue bridge, place soil fill and erosion control netting to construct planting benches, place instream wood structures, and plant and seed placed material. At Site 2-3, the Contractor will be required to clear remaining vegetation and stumps, grub and place soil and rock revetement on the levee face near H-Street, and seed placed material. Along the riverbank through Site 2-3, the Contractor will be required to excavate the bank to a specified flatter slope, excavate ten (10) feet deep into the finished grade to place approximately 79 rock tiebacks by placing rock revetment in 12-foot-wide trenches extending 60 feet to 90 feet in length, backfill with soil fill to finished grade, and place sections of continuous soil-filled rock protection. After excavation and placement, the Contractor will be required to place erosion control netting over planting benches, place instream wood structures on the planting benches, and plant and seed the finished grade. Most of Site 2-2 will require working in the active channel of the American River to place material, while the majority of Site 2-3 will be working in the floodplain above the active channel, with limited areas of the site requiring work in the active channel. The project will require import and placement of approximately 52,500 tons of rock riprap meeting the FHWA Type III gradation, approximately 49,000 tons of rock riprap meeting the FHWA Type IV gradation, approximately 4,500 tons of rock riprap meeting the FHWA Type V gradation, approximately 12,000 tons of bedding material to be imported and placed, approximately 365,000 cubic yards of soil excavation to be off hauled from the site over public roads and stockpiled at a specified stockpile location within 10 miles of the project, approximately 295 trees to be imported and placed as instream woody material, and approximately 4,700 live cuttings to be imported and planted on-site. Work will be performed over two (2) construction seasons as indicated in the plans and specifications. The solicitation, plans, and specifications are available for inspection without charge when accessed through the GPE or when requested and delivered by electronic mail and/or data interchange. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii), the Government currently estimates the magnitude of construction for this project to be between $25,000,000 and $100,000,000. The ONLY Interested Vendors / Plan Holders / Bidders List is available through beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not review capabilities statements submitted in response to this Solicitation or coordinate partnering arrangements between parties. Contractors should check beta.SAM.gov frequently for changes to the interested vendors list and this notice. PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED SOLICITATION AND CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ SAM Posting Amendment 1 - corrects the bid closing date to 17 March 2022, as stated on the SF 1442. SAM Posting Amendment 2 - site visit agenda and sign-in sheet uploaded. SAM Posting Amendment 3 - Amendment 1 to solicitation to extend ProjNet closing date from 03March2022 to 07March 2022 SAM Posting Amendment 4 - Update to description to include previously posted amendment SAM Posting Amendment 5 - Amendment 2 to the solicitation to extend bid due date from 17March2022 to 21March 2022, change allowed page size in section 00 21 00, Under Tab 3(r) to allow 11"x17" pages, and include Webex link and time for bid opening in Section 00 21 00. SAM Posting Amendment 6 - Amendment 3 to the solicitation for the following: 1. Amended Specification Sections Dated 08March2022: a. 01 00 00 - Added survey submittal and survey requirements b. 01 22 00 - Entire Section Replaced c. 01 33 00 - Added survey submittal d. 01 57 19 - Added paragraph "Work Below Ordinary High Water" e. 31 00 00 - Revised paragraph "Offsite Disposal" f. 35 42 38 - Revised paragraph "Pre-and Post-Construction Surveys"(Amendment 1) 2. Amended Plan Sheets to indicate Ordinary High Water Elevations Dated 08March2022: C-301, C-302, C-303, C-304, C-305, C-306, & C-307 (Amendment 1) 3. Provide Updated Bid Schedule Dated 08March2022 4. Provide Boring Log Location and Reports SAM Posting Amendment 7 - Amendment 4 to the solicitation for the following: 1. Extend bid due date from 21March2022 to 28March2022 2. Extend DoD Safe link request date from 14March2022 to 25March2022 3. Update to time for Webex public bid opening from 10:00AM to 11:00AM (PDT) on 28March2022. 4. Updated Constuction Wage Rate Requirements CA20220007 Dated 25Feb2022 SAM Posting Amendment 8 - Upload Bid Abstract

More opportunities from Department Of Defense → W075 Endist Sacramento

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS