Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on March 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCG Exchange Building HVAC Ducting and AHU Repair at Air Station Miami

Closed
20140PR240000100Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing approximately ten linear feet of leaking heat pipe sections in both the Administration Building and King Hall. All work must conform to the Massachusetts State Plumbing Code and International Plumbing Code, utilizing new commercial-quality materials suitable for hydronic heating service. The contractor is responsible for removing all debris and repairing any facility damage caused during performance at no additional cost. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a bid validity period of at least 60 days. Required documentation includes a current SAM.gov UEI number, active registration, Massachusetts licensing, a W-9, a signed ETR Vendor Acknowledgement Form, and certificates of insurance. This is an SBA set-aside opportunity for various small business categories. Award selection is not based solely on the lowest price; ETR will evaluate cost, qualifications, and administrative compliance. The project is subject to federal regulations, including the Davis-Bacon Act, Service Contract Act, and specific FAR clauses regarding anti-lobbying and debarment. Performance bonds are required for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
MI 2026-14 Emergency Heating and Air Conditioning Services
Solicitation # MI 2026-14
Adams and Associates, Inc., contracting for the U.S. Department of Labor, is soliciting bids for emergency heating and air conditioning services at the Miami Job Corps Center in Florida. The period of performance runs from November 1, 2026, to October 31, 2027. The selected vendor will provide emergency HVAC repairs, with pricing required for non-emergency daytime services (8:00 am to 4:30 pm) as well as emergency, weekend, and holiday rates. As a federally funded facility, the Center is entitled to GSA pricing. Award decisions will be based on the most responsible bidder, considering cost, licensure, experience, and insurance capabilities. Eligible bidders must be small businesses or certified socioeconomic categories, including VOSB, SDVOSB, WOSB, and HUBZone. Mandatory requirements include a valid Unique Entity ID (UEI), active SAM.gov registration, and all necessary Florida state business and employee licenses. Vendors must maintain Workers Compensation, Automobile Liability, and Comprehensive General Liability insurance of at least $1,000,000 per occurrence. The contract is subject to the Service Contract Act (Wage Determination No. 2005-2248) and the Davis-Bacon Act, with a minimum wage of $13.65 per hour applicable through December 31, 2026. Bids must be submitted on company letterhead by October 23, 2026, and include a W9, Vendor Questionnaire, Authority to Commit, and a certificate of insurance. Payment terms are NET 30 days. Personnel performing work on-site must adhere to strict security protocols, including searches and a prohibition on fraternization with students and staff. All deliveries must be coordinated through the Center's security personnel.
Miami Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 2 days
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace the HVAC equipment serving Building 22 at the San Diego Job Corps Center in Imperial Beach, California. The scope of work includes the removal of existing equipment and the installation of a new 5-ton condenser with a suitable pad, a new furnace, a 5-ton evaporator coil, a fused electrical disconnect, an electrical whip, and a new condensate drain line. The contractor is responsible for providing all labor, materials, and supervision, ensuring the system is fully operational and compliant with applicable codes. Key deliverables include two sets of operation and maintenance manuals and manufacturer and installer warranties. The estimated price range for this project is between 0 and 25,000 dollars. Bids are due by October 28, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout, proof of insurance, and three references. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds for 100 percent of the contract price from a surety with at least an A- rating. This opportunity is set aside for small businesses under NAICS 238220. Award decisions will be based on overall best value. Compliance requirements include the Davis-Bacon Act for prevailing wages, OSHA safety standards for personal protective equipment, and various Federal Acquisition Regulations, including those regarding first-tier subcontractor information and the submission of form SF 1413. Awarded contractors must provide a Unique Entity ID (UEI) number and complete the MTC Supplier Self-Certification packet. Payment will be made via progress payments based on percentage completion, utilizing AIA Document G702 and G703 or equivalent forms.
San Diego Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The scope of work includes the inspection, repair, and replacement of various components across eight exhaust fans, specifically addressing failed louver actuators, motor replacements, selector switch repairs, and the relocation of a thermostat. Contractors must provide detailed line-item pricing for each fan, separate pricing for system-wide component replacements, and detailed costs for labor and materials. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to a single responsible offeror based on technical acceptability and the lowest price. Key requirements include compliance with the Federal Acquisition Regulation, Davis-Bacon Act labor standards, and OSHA and EPA regulations. Contractors must be registered and licensed in the State of Kentucky, provide proof of insurance, and demonstrate the ability to secure performance and payment bonding. Administrative requirements include the submission of weekly certified payroll with every invoice and the provision of Materials Safety Data Sheets for all products used on site. The project involves a substantial completion process requiring a walk-through and final acceptance inspection. Quotes must be submitted electronically to the purchasing agent by October 30, 2026, and must include a completed New Vendor Profile and W-9 for any subcontractors.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Furnace Replacement
Solicitation # 26-17
Management & Training Corporation (MTC), operator of the Tongue Point Job Corps Center in Astoria, Oregon, is soliciting bids for a fixed-price, lump sum contract to replace furnaces and thermostats in three staff houses. The project involves Quarters F (3,786 sq/ft, propane), Quarters P (1,100 sq/ft, natural gas), and Quarters Q (2,280 sq/ft, propane). Required equipment must be Carrier Comfort Series or an equivalent household good grade with at least a 96% efficiency rating, sized at approximately 80,000btu. Installations must include new transitions to existing ducting, gas regulators, electrical and condensate pump kits, and intake/exhaust venting. A lifetime warranty on the heat exchanger and a minimum 10-year warranty on parts are mandatory. The estimated price range for this solicitation is between $0 and $25,000, with bids due by October 21, 2026. This is a small business set-aside opportunity under NAICS code 238220. Award decisions will be based on overall best value. Contractors must comply with the Davis-Bacon Act and applicable prevailing wage determinations, providing certified payroll weekly. Bid and performance bonds are only required for bids equal to or exceeding $25,000. Submission requirements include a signed MTC bid form, a detailed cost breakout on company letterhead, a Unique Entity Identification number, and a completed supplier self-certification packet. Final acceptance is contingent upon functional testing, the submission of operation and maintenance manuals, and a final inspection.
Tongue Point Job Corps

POSTED

about 8 hours ago

DEADLINE

in about 21 hours
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the demolition and removal of the existing dry system distribution piping network and failing air compressor across the Men's Dormitory (Building CM), Women's Dormitory (Building CW), and Recreation Building (Building D). The selected licensed fire sprinkler contractor must eliminate system leaks and install a new compressor sized according to NFPA standards to prevent equipment short-cycling. All work must adhere to NFPA 25 (2023 Edition) and local, state, and national codes, with a required performance period of 30 consecutive business days following the Notice to Proceed. Bids are due by December 1, 2026, and must be based on a mandatory site visit. Evaluation is based on overall best value and bidder responsiveness. For bids totaling $25,000 or more, a bid bond of 20% of the base bid is required at submission, and the awarded contractor must provide performance and payment bonds from an A-rated surety within five business days of the Intent to Award. Compliance requirements include adhering to Davis-Bacon prevailing wage rates for Idaho, submitting weekly certified payroll reports, and providing a 12-digit UEI number. Additionally, first-tier subcontractors with awards exceeding $45,000 must disclose debarment status per FAR 52.209-6, and contracts valued at $40,000 or more are subject to FFATA reporting.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center, is soliciting fixed-price quotes for an HVAC project at Building 1403-04 B Hall in Kentucky. The scope of work requires the contractor to furnish and install two 4-ton Trane split systems with a minimum 17 SEER rating, two 95% AFUE high-efficiency gas furnaces, and matching indoor evaporator coils using R-454B refrigerant. Additional requirements include the installation of a Honeywell Pro 8000 programmable thermostat, new refrigerant line sets, condensate drain piping, and pumps. The project must be completed within 45 days of award, and the contractor is responsible for all inspections, testing, and providing necessary operating and maintenance manuals. The contract will be awarded to the responsible offeror who is technically acceptable and provides the lowest price. To be considered, bidders must be registered and licensed in the State of Kentucky, verified through the SAM portal, and provide a minimum 90-day bid guarantee along with proof of ability to secure performance and payment bonding. Compliance with the Davis-Bacon Act and Certified Payroll Wage Rate requirements is mandatory, with weekly certified payroll and a signed Statement of Compliance required for invoice acceptance. All work must adhere to local codes, manufacturer specifications, OSHA, and EPA regulations. Quotes are due by October 30, 2026, and must include detailed labor and materials costs, a W-9, and a New Vendor Profile.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Roswell JCC – Male Dormitory Bldg. Water Source Heat Pump Replacement (20 units)
Solicitation # roswell-jcc-male-dormitory-bldg-water-source-heat-pump-replacement-20-units
Career Systems Development Corporation is soliciting proposals for the total replacement of twenty ceiling-mounted water source heat pumps at the Roswell Job Corps Center Male Dormitory Building 558 in New Mexico. The scope of work includes the removal and off-site disposal of twenty failed units and the installation of new Bosch 1-ton units or equivalent, including all necessary ducting, electrical, gas, thermostat wiring, flexible hoses, and pressure valves. Additionally, the contractor must install smoke dampers with fusible links in all vents leading into the plenum and ensure all materials used in the plenum are plenum-rated. All work must comply with NFPA 101, NFPA 70, and applicable plumbing, mechanical, and building codes, with performance scheduled between 7:00 am and 4:00 pm, Monday through Friday. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act Wage Determination NM20260014, requiring the submission and approval of weekly certified payroll reports prior to invoice payment. Proposals exceeding $100,000.00 require payment and performance bonding for 100% of the contract value. Submissions must include a safe work process, detailed costs for labor and materials, equipment cut sheets, warranty information, and a requested payment schedule. Final deliverables include the provision of operation manuals to the Facility Manager upon project completion.
Career Systems Development Corporation

POSTED

about 8 hours ago

DEADLINE

in 17 days

General Info

Contract Value

$22,468

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

Opa Locka, FL, 33054, USA

Set-Aside

SBA

Award Issued Date

Documents

2

20140PR240000100 Combined Synopsis/Solicitation

PDF, High priority: read this first12 pages · rfq
High

Scope of Work: Exchange Building HVAC Ducting and AHU Repair

PDF, High priority: read this first6 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base MIAMI(00028)
Contacts2 people available
OfficeMIAMI, FL, 33132, USA
Office AddressMIAMI, FL, 33132, USA

Full Description

Show more
This combined synopsis/solicitation for services prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued. The solicitation number is 20140PR240000100 Applicable North American Industry Classification Standard (NAICS) codes are: 238220 Plumbing, Heating, And Air-Conditioning Contractors This requirement is for a fixed price contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, Best Value. When submitting your proposals, request a price breakdown of the following: a. Cost of labor and supervision b. Cost of materials and equipment needed to perform the work. Prospective contractors shall also provide along with your proposal past performance documents which will be used to determine expertise to perform such work. Contract will be awarded to the vendor who can perform the work outlined in the provided SOW in the time frame needed by unit. Past Performance and Cost factors will also be used when selecting the award. Anticipated award date: 10 business days after close of solicitation, OOA 10 April 2024 Quotes are to be received no later than close of business (2 p.m.) on 01 April 2024. Quotes can be email to: Mehdi.Bouayad@uscg.mil Quotations sent via the US Postal Service or hand delivered should be sent to: Commanding Officer USCG Base Miami Beach (P&C) Attn: Mehdi Bouayad 909 SE 1st Ave, Room 512 Miami, FL 33131. Telephone requests of quotes, will NOT be accepted, a formal notice of changes (if applicable) will be issued in Beta.Sam.Gov (SAM.gov | Workspace) ***** SITE VISIT**** Thursday Mar 21 2024 AT 10:00am AT PROJECT SITE (Air Station Miami) POC: MK1 Andre Trinidad Email: Andre.G.Trinidad@uscg.mil Phone: 786-424-8312 POC: DCC Keegan Martin Email: Keegan.L.Martin@uscg.mil Phone: 360-244-0842 XI. SCOPE OF WORK: 2.1 SCOPE OF WORK: 2.1.1 Furnish all labor, materials, tools, and equipment necessary to complete scope. 2.1.2 Remove ceiling tiles and ceiling grid as necessary to perform work. 2.1.3 Coordinate with USCG Air Station personnel for the removal of any floor level obstructions. 2.1.4 Ducting Repairs for North AHU 2.1.4.1 Replace all 10 and 8 flex ducting that have been adversely affected by rodent infestation up to 150. 2.1.4.2 Encapsulate affected insulation including asbestos containing mastic around metal ducting not to exceed 100 linear feet using industry standard practices. 2.1.4.3 Properly seal and securely fasten insulation 2.1.4.4 Replace all supply and return grilles associated with the affected AHU approximately (7). 2.1.4.5 Affect repairs to transfer boxes as needed approximately (2). 2.1.5 Bearing and Shaft Replacement for Central AHU 2.1.5.1 Recover refrigerant from system. 2.1.5.2 Remove panels to access system interior. 2.1.5.3 Replace blower motor, wheel, shaft, and bearings. 2.1.5.4 Reinstall removed panels. 2.1.5.5 Install new drier. 2.1.5.6 Recharge system with refrigerant. 2.1.5.7 Conduct operational testing with Coast Guard representative. 2.1.6 Reinstall any and all ceiling tiles and grid removed during repairs. 2.1.7 Ensure the work is returned to its pre?work state and all dirt and debris associated with the work is removed and cleaned. 2.1.8 Conduct final walkthrough and inspection with Coast Guard representative. 3 SUBMITTALS AND OUTCOMES 3.1 Safety Plan (see 21.3) 3.2 The Contractor shall submit a work schedule including all milestones within seven (7) calendar days following contract award. 3.3 Provide list of chemicals used along with their SDS. Also submit licenses of any personnel providing pest control services at the unit. 4 PROJECT PERFORMANCE TIME The contractor must complete all work, deliverables, and outcomes within 10 calendar days after notice to proceed is given by the Government. If bearing and shaft replacement parts incur a longer wait time, conduct ducting repairs within 10 calendar days of notice to proceed and Center AHU repairs within 10 calendar days of parts receipt. 5 LOCATION All work shall take place at the following location: CG AIRSTA Miami 14750 NW 44th Ct. Opa Locka, FL 33054 6 POINT OF CONTACT The Government Point of Contact (POC) for this work is MK1 Andre Trinidad, (786) 424- 8312, Andre.G.Trinidad@uscg.mil or DCC Keegan Martin, (360) 244-0842, Keegan.L.Martin@uscg.mil. The Contractor shall coordinate with the POC to minimize interference with Coast Guard operations or personnel. All work shall be coordinated with other trades involved in the project and carefully laid out in advance. 7 WORK PHASING 7.1 All work shall be completed within ten days of contract award. 7.2 The facility shall remain in operation throughout the service. Contractor access to the service site shall be limited to the following: 7:00am to 7:00pm, Monday through Sunday, excluding holidays. Access to the site shall not be permitted on the weekends without prior approval from the Coast Guard (COR). 8 AVAILABILITY OF UTILITIES 8.1 Reasonable amounts of the following utilities will be made available to the Contractor without charge. 8.1.1 Electricity 8.1.2 Potable Water 8.2 The Contractor shall pay all costs incurred in connecting, converting, and transferring the utilities to the work. The Contractor shall be responsible for making connections including providing back flow preventer devices on connections to domestic water lines, providing transformers, and for disconnections. The POC shall designate the outlets available to the Contractor. 9 CONTRACTOR USE OF PREMESES The Contractor will be working on a Coast Guard operational military installation. Become familiar with and obey installations fire, traffic, and security regulations. Personnel shall not stray from the immediate area of work nor direct avenues of ingress and egress unless authorized in advance by the Government. 10 LAYDOWN AREA The Contractor will be provided with an uncovered lay-down area in the immediate vicinity of the work. The Contractor shall be responsible for restoring the area to its original condition at the completion of the work. The Contractor shall be responsible for repair of any damage incurred to buildings or pavement as a result of storage activities. 11 STORM PROTECTION Should warnings of extreme weather (such as storm surge, wind of gale force) be issued, the Contractor shall take every practicable precaution to minimize danger to personnel, the work and adjacent property. Precautions shall include, but not be limited to, closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing fencing, scaffolding and other temporary work. 12 ENVIRONMENTAL PROTECTION All Federal, State and local laws must be strictly adhered to. Chemical's used shall be documented including SDS, date/time, and location applied. 13 DELIVERY AND STORAGE Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations. Damaged or defective items shall be replaced. Location of storage and staging area shall be designated by the POC. The contractor will be responsible for security of all materials and equipment. 14 RECEIPT OF MATERIALS Shipment of equipment, materials, and supplies shall be addressed to the Contractor - not the Government. The Contractor must be on hand to accept shipments; the Government will not accept shipments. 15 CLEANUP The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials on a daily basis and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpsters. 16 UTILITY OUTAGES Before interrupting or shutting down any utility, make a request for the interruption to the POC at least two (2) working days before the anticipated interruption. Identify the utility, reason for interruption, proposed time of interruption, and duration of interruption. Do not interrupt utilities until authorized by the POC. 17 SECURITY 17.1 Working Personnel List. The Contractor shall provide the COR with a list of names of all personnel who will be working on the site. The Contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site. 17.2 Personnel Identification. All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual's driver's license, or a company issued ID. The identification must be laminated, and show facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises. 18 QUALITY Quality of Contractor Furnished Material. Materials supplied by the Contractor shall be of a quality conforming to applicable Federal specifications and lead and asbestos free. 19 WARRANTIES All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government. 20 FINAL INSPECTION AND ACCEPTANCE When the work is complete and ready for final inspection, submit a written request to schedule final inspection to the Government. Prior to such requests, all submittals must be complete and approved. Such requests shall allow a minimum of two (2) days notice prior to final inspection date. 21 SAFETY 21.1 General The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the service area, prevents damage to property and avoids work interruptions. The Contractor shall provide appropriate safety measures including but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules and regulations. 21.2 Compliance The Contractor is specifically required to comply with the requirements of the U. S. Army Corps of Engineers "Safety and Health Requirements Manual" (EM 385-1-1, latest version available) and the - Accident Prevention clause (FAR 52.236-13). Once accepted, this safety plan shall become part of the contract requirements. Note: This review/acceptance does not in any way relinquish the Contractor from responsibility for work site safety nor the obligation to comply with the OSHA regulations found in 29 CFR 1910 & 1926 or any other State or Local safety law, rule or regulation applicable to the contract work. The Coast Guard will cooperate fully with the Department of Labor (Occupational Safety and Health Administration) in their enforcement of OSHA regulations. 21.3 Safety Plan The Contractor shall submit a written safety plan within seven (7) calendar days following contract award. At a minimum, this plan shall describe the Contractor's general safety program and identify specific safety provisions for hazards incidental to the contract work such as elevated working surfaces, working over water, working from floating work platforms, overhead crane operations or similar conditions of the work. This Safety Plan shall be approved prior to commencing any work on site. LOCATION OF PROJECT: United States Coast Guard Air Station Miami 14750 NW 44TH CT OPA LOCKA, FL 33054 ***********Q&A's***********: Questions concerning the work requested must be sent to Mehdi.Bouayad@uscg.mil by COB Monday 25 March 2024. These Q&A's will be answered and posted to this solicitation as an amendment prior to close of solicitation. APPLICABLE FAR CLAUSES FAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items). ATTACHED BY REFERENCE 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS 52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984) 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984) 52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995) Work hours: Monday through Friday, 0730 - 1800 (7:30 am - 6 pm) No weekends or Holidays authorized. See attached applicable FAR Clauses by reference. Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov. Request Company's Tax ID information and UEI number. Vendors providing an offer must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an - ACTIVE status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS