Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on January 24, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCG HILLSBORO Cottage 2 Roof Replacement

Closed
31020PR230000082Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Department Of Commerce Nist

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 236210
New
Federal
Sources Sought - POST TEST LITHIUM BATTERY STORAGE
Solicitation # N00167-27-RFPREQ-CD-102-0002
The Naval Sea Systems Command Naval Surface Warfare Center Carderock Division is conducting a sources sought effort for the construction of a Post-Test Lithium Battery Storage Facility in West Bethesda, Maryland. This project, classified under NAICS code 236210 for Industrial Building Construction, involves the creation of a storage area featuring a non-flammable single-pitch sloped roof, a perimeter fence with a gate, 3-hour rated firewalls, and concrete walls for large battery storage. Additional requirements include low-voltage outlets, pole-mounted LED flood lighting, and a dedicated forklift access road. The effort must be completed within 210 days of the award and adhere to Unified Facilities Guide Specifications and other stringent technical criteria. This notice is not a request for proposal, and no award will be made directly from this notice. Interested small and large businesses must submit a capability statement and a Rough Order of Magnitude by 1700 EST on 18 November 2026 to Heather Valiga. The government will use these responses to determine the future acquisition strategy. Because the project is located on a secure military installation, all personnel must obtain proper clearances and credentials. Key deliverables include an Activity Hazard Analysis and a detailed schedule due within five days of the pre-construction meeting, as well as a personnel list provided seven days before the start date.
Nswc Carderock

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 236210
New
SLED
Arrowhead Regional Medical Center Lot 1 Parking Structure
Solicitation # 2026010330
The County of San Bernardino is soliciting the construction of the Arrowhead Regional Medical Center Lot 1 Parking Structure located at 400 North Pepper Avenue in Colton, California. The project consists of a post-tensioned, cast-in-place structure spanning up to 500,000 square feet across six levels, providing up to 1,600 parking spaces. Key design elements include a finished exterior with an architectural mesh facade on the first floor, two banks of two elevators, and the installation of photovoltaic panels on the top level. The facility will be restricted to employees via badge access and will feature security enhancements such as LED lighting, emergency call boxes, security cameras, and locked gates. The project must comply with the California Building Code, the Americans with Disabilities Act, the 2022 California Building Energy Efficiency Standards (Title 24), and the California Green Building Standards Code (CALGreen) for electric vehicle charging stations. Environmental mitigation includes a landscape plan to offset the removal of approximately 51 trees. To maintain parking capacity during construction, a temporary surface parking lot will be operated at 1351 West Valley Boulevard with shuttle services provided to the campus. The project has undergone CEQA review, resulting in a Mitigated Negative Declaration confirming that the project will not have significant environmental impacts provided mitigation measures are implemented.
San Bernardino County

POSTED

1 day ago

DEADLINE

N/A

General Info

Contract Value

$25,804.8

NAICS

236210 - Industrial Building Construction

Place of Performance

Hillsboro Beach, FL, 33062, USA

Set-Aside

SBA

Award Issued Date

Documents

2

SOW+HILLSBORO+Cottage+2+Roof+Replacement.docx

DOCX

Synopsis+Solicitation+Roof+Replacement+for+USCG+Hillsboro+Cottages.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base MIAMI(00028)
Contacts2 people available
OfficeMIAMI, FL, 33132, USA
Office AddressMIAMI, FL, 33132, USA

Full Description

Show more
This combined synopsis/solicitation for construction services prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued. The solicitation number is 31020PR230000082 Applicable North American Industry Classification Standard (NAICS) codes are: 236210 236210 - Industrial Building Construction, Size standard in Employees ($33.5) This requirement is for a fixed price contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, Best Value. When submitting your proposals, request a price breakdown of the following: a.Cost of materials and equipment b.Cost of labor Contract will be awarded to the vendor who can provide Best value which includes all labor, material, cost and equipment required within the SOW. Cost and Past Performance factors will also be considered when selecting the award. Anticipated award date: 10 business days after close of solicitation, OOA 22 Feb 2023 Quotes are to be received no later than close of business (3 p.m.) on Friday Feb 17 2023 and are to be sent via e-mail to Mehdi.Bouayad@uscg.mil Quotations sent via the US Postal Service or hand delivered should be sent to: Commanding Officer USCG Base Miami Beach (P&C) Attn: Mehdi Bouayad 909 SE 1st Ave, Room 512 Miami, FL 33131. Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will be issued in FEDBIZOPS (www.fbo.gov). Wage determinations: FL20230208 Last Revised 01/13/2023SCOPE OF WORK XI: SCOPE OF WORK: 1.Below work will be completed onboard United States Coast Guardproperty at Hillsboro Beach Cottages. 2.Contractor shall provide ALL labor and materials necessary tocomplete the project. 3.Contractor shall comply with submittal requirements detailedbelow. 4.Contractor shall replace the entire roof on Cottage 2. 5.Contractor shall place a tarp on the ground around the perimeterof cottage 2 to collect any debris from roof project. 6.Contactor shall clean roof of any loose debris or raised nails. 7.Contractor shall NOT use blowers of any kind. Roof must be sweptclean. 8.Contractor shall repair any broken or rotted sheathing. Sheathingmust be a min of 5/8 inches in thickness. 9.Contractor shall install self-adhesive underlayment. Please refer tosection 2.4 of the submittal page. 10. Contractor shall install glass- fiber reinforced asphalt shingles. Please refer to section 2.1 of the submittal page. 11. Contractor shall use stainless steel wire shank shingle nails. Please refer to section 2.3 of the submittal page. 12. Contractor shall install metal flashing and trim. Please refer to section 2.4 of the submittal page. 13. Contractor shall protect all equipment and merchandise in work locations. 14. Contractor shall be responsible for the removal of all trash and debris from project area upon completion. 15. All work must be approved by the Contracting Officer's Representative. XII: SUBMITTALS: Submittals shall be approved before procurement, fabrication, or delivery of items to the job site. Partial submittals will not be acceptable and will be returned without review. Submittals shall include the manufacturer's name, trade name, catalog model or number, nameplate data, size, layout dimensions, capacity, project specification and paragraph reference, applicable Federal, Military, industry and technical society publication references, and other information necessary to establish contract compliance of each item the Contractor proposes to furnish. Failure to furnish required submittals can be cause for rejection of the material. Approval of submittals shall not relieve the contractor his obligation to comply with the contract specifications and drawings. Lighthouse Point Shingle Roof Replacement 07311 - 1 SECTION 07311 - ASPHALT SHINGLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Asphalt shingles. 2. Underlayment. 3. Self-adhering Sheet Underlayment. 1.3 DEFINITION A. Roofing Terminology: See ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" for definitions of terms related to roofing work in this Section. 1.4 SUBMITTALS A. Product Data: For each type of product indicated. B. Samples for Initial Selection: For each type of asphalt shingle ridge and hip cap shingles and exposed valley lining indicated. 1. Include similar Samples of trim and accessories involving color selection. C. Samples for Verification: For the following products, of sizes indicated, to verify color selected: 1. Asphalt Shingle: Full size. 2. Ridge and Hip Cap Shingles: Full size. 3. Exposed Valley Lining: 12 inches square. 4. Self-Adhering Underlayment: 12 inches square. D. Qualification Data: For qualified Installer. E. Product Test Reports: Based on evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified testing agency, for asphalt shingles. F. Maintenance Data: For each type of asphalt shingle to include in maintenance manuals. G. Warranties: Sample of special warranties. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project. B. Fire-Resistance Characteristics: Where indicated, provide asphalt shingles and related roofing materials identical to those of assemblies tested for fire resistance per test method below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing agency. 1. Exterior Fire-Test Exposure: Class A; ASTM E 108 or UL 790, for application and roof slopes indicated. C. Pre installation Conference: Conduct conference at Project site. 1.6 DELIVERY, STORAGE, AND HANDLING A. Store roofing materials in a dry, well-ventilated, weather tight location according to asphalt shingle manufacturer's written instructions. Store underlayment rolls on end on pallets or other raised surfaces. Do not double stack rolls. 1. Handle, store, and place roofing materials in a manner to avoid significant or permanent damage to roof deck or structural supporting members. B. Protect unused underlayment from weather, sunlight, and moisture when left overnight or when roofing work is not in progress. 1.7 PROJECT CONDITIONS A. Environmental Limitations: Do not deliver or install asphalt shingles until spaces are enclosed and weather tight, wet work in spaces is complete and dry, and temporary HVAC system is operating and maintaining ambient temperature and humidity conditions at occupancy levels during the remainder of the construction period. 1. Install self-adhering sheet underlayment within the range of ambient and substrate temperatures recommended by manufacturer. 1.8 WARRANTY A. Special Warranty: Standard form in which manufacturer agrees to repair or replace asphalt shingles that fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. Manufacturing defects. b. Structural failures including failure of asphalt shingles to self-seal after a reasonable time. 2. Material Warranty Period: 25 years from date of Substantial Completion, prorated, with first five years non-prorated. 3. Wind-Speed Warranty Period: Asphalt shingles will resist blow-off or damage caused by wind speeds up to 150 mph for 10 years from date of Substantial Completion. 4. Algae-Discoloration Warranty Period: Asphalt shingles will not discolor 10 years from date of Substantial Completion. 5. Workmanship Warranty Period: 5 years from date of Substantial Completion. B. Special Project Warranty: Roofing Installer's Warranty, or warranty form at end of this Section, signed by roofing Installer, covering the Work of this Section, in which roofing Installer agrees to repair or replace components of asphalt shingle roofing that fail in materials or workmanship within specified warranty period. 1. Installer Warranty Period: (5) Five years from date of Substantial Completion. 1.9 EXTRA MATERIALS A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Asphalt Shingles: 100 sq. ft of each type, in unbroken bundles. PART 2 - PRODUCTS 2.1 GLASS-FIBER-REINFORCED ASPHALT SHINGLES A. Laminated-Strip Asphalt Shingles: ASTM D3462 and AC438, laminated, multi-ply overlay construction, glass-fiber reinforced, mineral-granule surfaced, and self-sealing. 1. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated below or comparable product (submit for approval): GAF TIMBERLINE OR EQUIVALENT 2. Butt Edge: Straight cut. 3. Strip Size: Manufacturer's standard. 4. Algae Resistance: Granules treated to resist algae discoloration. 5. Color and Blends: Match existing. 6. Wind-resistance tests: ASTM D7158, Class H (150 mph) 7. Fire-resistance test: ASTM E 108 or UL 790, Class A 8. Miami Dade NOA: Required 2.2 UNDERLAYMENT MATERIALS A. Felt: ASTM D 226, Type II, asphalt-saturated organic felts, non-perforated. 1. Acceptable Manufacturers: a. The Garland Company/Commercial Innovations: Viking AOB B. Self-Adhering, High-Temperature Sheet: Minimum 60 mils thick, consisting of slip-resisting polyethylene-film top surface laminated to layer of butyl or SBS-modified asphalt adhesive, with release-paper backing; cold applied. Provide primer when recommended by underlayment manufacturer. 1. Thermal Stability: ASTM D 1970; stable after testing at 240 deg F. 2. TAS 103 3. Low-Temperature Flexibility: ASTM D 1970; passes after testing at minus 20 deg F. 4. Acceptable Manufacturers: a. The Garland Company R-MER SEAL // MIAMI DADE NOA 18-0521.03 PAGE 2. 2.3 ACCESSORIES A. Asphalt Roofing Cement: ASTM D 4586, Type II, asbestos free. BASIS OF DESIGN: GARLA FLEX B. Roofing Nails: ASTM F 1667; stainless-steel wire shingle nails, minimum 0.120-inch- diameter, barbed shank, sharp-pointed, with a minimum 3/8-inch- diameter flat head and of sufficient length to penetrate 3/4 inch (19 mm) into solid wood decking or extend at least 5/8 inch through plywood sheathing. 1. Where nails are in contact with metal flashing, use nails made from copper or stainless steel#4. C. Felt Underlayment Nails: stainless-steel wire with low-profile capped heads or disc caps, 1-inch minimum diameter. 2.4 METAL FLASHING AND TRIM A. General: Comply with industry standards and Miami Dade requirements. 1. Metal: 20 Oz Copper B. Fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of the item. 1. Apron Flashings: Fabricate with lower flange a minimum of 5 inches over and 4 inches beyond each side of downslope asphalt shingles and 6 inches up the vertical surface. 2. Open-Valley Flashings: Fabricate in lengths not exceeding 10 feet with 1-inch- high, inverted-V profile at center of valley and equal flange widths of 12 inches. 3. Drip Edges: Fabricate in lengths not exceeding 10 feet with 4-inch roof-deck flange and 4-inch fascia flange with 3/8-inch drip at lower edge. C. Vent Pipe Flashings: ASTM B 749, Type L51121, at least 1/16 inch thick. Provide lead sleeve sized to slip over and turn down into pipe, soldered to skirt at slope of roof, and extending at least 8 inches from pipe onto roof. D. Gutters: Residential style gutters to be installed where gutters are currently present. All gutters and downspouts to be fabricated out of materials listed below. 1. 20 oz. Copper. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. 1. Examine roof sheathing to verify that sheathing joints are supported by framing and blocking or metal clips and that installation is within flatness tolerances. 2. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and completely anchored; and that provision has been made for flashings and penetrations through asphalt shingles. B. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 UNDERLAYMENT INSTALLATION A. General: Comply with underlayment manufacturer's written installation instructions applicable to products and applications indicated unless more stringent requirements apply. B. Install per NOA 18-0521.03 page 2. C. Single-Layer Felt Underlayment: Install on roof deck parallel with and starting at the eaves. Lap sides a minimum of 2 inches over underlying course. Lap ends a minimum of 4 inches. Stagger end laps between succeeding courses at least 72 inches. Fasten with roofing nails. 1. Install felt underlayment on roof deck. Lap sides of felt not less than 4 inches in direction to shed water. Lap ends of felt not less than 6 inches. 2. Install fasteners at no more than 6-inch o.c with tin tags. D. Self-Adhering Sheet Underlayment: Install, wrinkle free, on roof deck. Comply with low-temperature installation restrictions of underlayment manufacturer if applicable. Install at locations indicated on Drawings, lapped in direction to shed water. Lap sides not less than 4 inches. Lap ends not less than 6 inches staggered 24 inches between courses. Roll laps with roller. Cover underlayment within seven days. 1. Prime concrete and masonry surfaces to receive self-adhering sheet underlayment. 2. Sidewalls: Extend beyond sidewall 18 inches and return vertically against sidewall not less than 8 inches. 3. Dormers, Chimneys, Skylights, and Other Roof-Penetrating Elements: Extend beyond penetrating element 18 inches and return vertically against penetrating element not less than 8 inches. E. Metal-Flashed, Open-Valley Underlayment: Install two layers of 36-inch- wide Self-Adhering Sheet underlayment centered in valley. Stagger end laps between layers at least 72 inches. Lap ends of each layer at least 12 inches in direction to shed water, and seal with asphalt roofing cement. 1. Install metal valley according to recommendations in ARMA's "Residential Asphalt Roofing Manual" and asphalt shingle recommendations in NRCA's "The NRCA Roofing and Waterproofing Manual." 3.3 METAL FLASHING INSTALLATION A. General: 1. Install metal flashings according to recommendations in ARMA's "Residential Asphalt Roofing Manual" and asphalt shingle recommendations in NRCA's "The NRCA Roofing and Waterproofing Manual." B. Rake Drip Edges: Install rake drip edge flashings over underlayment and fasten to roof deck. C. Eave Drip Edges: Install eave drip edge flashings below underlayment and fasten to roof sheathing. D. Pipe Flashings: Form flashing around pipe penetrations and asphalt shingles. Fasten and seal to asphalt shingles as recommended by manufacturer.E. Gutters & Downspouts: All seams to be sealed with Tuff Stuff MS. Gutters are to slope to downspouts away from building. 3.4 ASPHALT SHINGLE INSTALLATION A. General: Install asphalt shingles according to manufacturer's written instructions, recommendations in ARMA's "Residential Asphalt Roofing Manual," and asphalt shingle recommendations in NRCA's "The NRCA Roofing and Waterproofing Manual." B. Install starter strip along lowest roof edge, consisting of an asphalt shingle strip with tabs removed at least 7 inches wide with self-sealing strip face up at roof edge. 1. Extend asphalt shingles 1/2 inch over fascia at eaves and rakes. 2. Install starter strip along rake edge. C. Install first and remaining courses of asphalt shingles stair-stepping diagonally across roof deck with manufacturer's recommended offset pattern at succeeding courses, maintaining uniform exposure. D. Fasten asphalt shingle strips with a minimum of six roofing nails located according to manufacturer's written instructions. E. Install per Miami Dade NOA 18-0521.03 END OF SECTION 07311 Addendum 7 DEC 2022 1.Include an orange fence around the perimeter. 2.Include daily clean up with a magnet 3.Include 8 sheets plywood base bid. 4.Include 100LF of 3 soffit in base bid. 5.Change all references from copper to aluminum 6.Prime and Paint all sides of soffit and fascia; 2 coats. 7.Davis Bacon Wage Rates are Required. Value Engineering: 1. Plywood deck replacement and Gutter Installation will be excluded from this proposal. 2. Aluminum flashings will be included in lieu of Copper. Location of Work: United States Coast Guard Property 907B Hillsboro Mile Hillsboro Beach, FL 33062 NTE $35K Performance Period: Performance of work is expected to commence NLT 10 days after award is made. Extension period must be approved by the Contracting Officer for any unforeseen delays. ***Site visit***: It is highly recommended and encouraged that interested party's contact Mr. Boris Abello for a site visit which will be held on Thursday Feb 2, 2023 at 10:00AM EST. For scheduling contact Mr. Boris Abello via email Boris.Abello@uscg.mil or via phone 786-486-7597 **All Questions and Answers will not be accepted after Friday 10 Feb 2023 at 2:00PM EST. APPLICABLE FAR CLAUSES FAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items). ATTACHED BY REFERENCE 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS 52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984) 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984) 52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995) Work hours: Monday through Friday, 0730 - 1800 (7:30 am - 6 pm) No weekends or Holidays authorized. See attached applicable FAR Clauses by reference. Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov. Request Company's tax ID information and Duns number. Vendors providing an offer must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an - ACTIVE status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS