Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on March 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCG STATION SAND KEY PARKING LOT REPAIR

Closed
30321PR250000004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 3 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2027022
Solicitation # 2027022
RFP 2027022 is a unit price solicitation issued by the Spartanburg County Government for the Tier 3 Subdivision Reclamation project focusing on Group 1, specifically the Timberlake and Wicklow areas in South Carolina. The scope of work involves road reclamation and paving, with core requirements including the installation of 2 inch Surface C and 8 inch CMRB Method B, as well as the application of temporary and thermoplastic pavement markings. Technical specifications require the use of a sloped edge longitudinal shoulder joint attachment per SCDOT Standard 401.3.19.2, with devices sourced from Qualified Products List 75. Additional project components include 8 inch full depth patching, removal and disposal of existing asphalt pavement for driveway tie-ins, maintenance stone, and as-needed wrecker services. The contract is administered as a unit price agreement where final payment is based on field-verified quantities of work performed. Proposers must maintain minimum insurance coverage, including 1 million dollars in general liability, and certify compliance with the Federal Civil Rights Act, the Americans with Disabilities Act, and the Drug Free Workplace Act. Proposals must remain valid for 60 days following the opening date. Payment for undisputed invoices is due upon receipt and considered past due after 30 days, with no interest accruing on late payments. All work must adhere to industry standards and SCDOT specifications, and the contract is subject to appropriation by the county.
Spartanburg County Government

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2026-40 Capital Connector Construction Project
Solicitation # 2026-40
The City of Charleston, West Virginia, is soliciting bids for the Capital Connector Project, a multimodal corridor improvement initiative funded by a federal RAISE grant. The project aims to transform the Kanawha Boulevard Bike and Walkway corridor into a complete street, encompassing approximately 3.25 miles of improvements along Kanawha Boulevard East (US Route 60) from Magic Island to the 35th Street Bridge, as well as 0.25 miles of safety upgrades on Greenbrier Street. Key deliverables include lane reductions, protected intersection improvements, signal modifications, the installation of bioswale systems, and the widening of shared-use paths. All work must adhere to 2023 WVDOH Standard Specifications, ADA Section 504, PROWAG standards, and the Build America Act and Buy America requirements. Eligible bidders must be listed on the West Virginia Division of Highways' Prequalified Contractors List and must not be delinquent in Business and Occupation taxes or owe more than 1,000 dollars to the state or its political subdivisions. The contract will be awarded to the lowest responsive and responsible bidder, with a performance period of 548 calendar days from the Notice to Proceed. Bids must be submitted electronically via BidExpress by December 3, 2026, and must include a bid bond for 5 percent of the total amount. Successful vendors are required to provide performance and labor/material payment bonds for 100 percent of the contract value, maintain commercial general liability insurance of at least 1,000,000 dollars per occurrence, and comply with Davis-Bacon prevailing wage standards.
City of Charleston

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
Federal
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
Solicitation # W912WJ27QA003
Solicitation W912WJ27QA003 is a firm-fixed-price construction contract issued by the Department of Defense, W2SD Endist New England, for the installation of approximately 250 linear feet of new pressure-treated wooden guardrail at the Mansfield Hollow Dam in Mansfield Center, Connecticut. The project requires the contractor to provide all necessary equipment, materials, and labor, ensuring posts are set three feet below and three feet above finished grade, spaced every six feet on center and secured with carriage bolts. The estimated magnitude of construction is between $25,000 and $100,000, with a period of performance of 210 calendar days from the receipt of the notice to proceed. Work is restricted to Monday through Friday, from 7:00 AM to 3:30 PM. This procurement is a total set-aside for small business vendors under NAICS code 237310. To be considered responsive, vendors must maintain an active registration in SAM.gov and submit comprehensive documentation covering technical capabilities, price, and past performance from the last three years. Key safety requirements include strict adherence to USACE EM 385-1-1 standards and the submission of an Accident Prevention Plan, Activity Hazard Analysis, and Site Safety and Health Officer Designation Letter within 21 days of the notice to proceed. No field work may begin until these pre-construction submittals are accepted. Award will be granted to the responsible vendor whose quotation is most advantageous to the government based on a comparative evaluation of price and technical factors.
W2SD Endist New England

POSTED

about 7 hours ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
Solano State Route 12 Pavement Preservation (04-0AA53)
Solicitation # 04-0AA53
The Solano State Route 12 Pavement Preservation project (EA 04-0AA53) is a Caltrans District 4 initiative located in Solano County, California, spanning State Route 12 between postmiles 14.10 and 20.68. With a total programmed cost of approximately 37.388 million dollars, the project focuses on comprehensive roadway improvements including pavement dig-outs, cold planing, asphalt concrete overlay, and the installation of AC dikes. Additional scope elements include shoulder widening, drainage improvements, the upgrade of metal beam guardrails, traffic signing panel updates, and the installation of centerline and shoulder rumble strips and pavement delineation. The project is governed by the 2025 Caltrans Standard Specifications, with specific requirements for job site management and the handling of hazardous waste and contamination. Environmental compliance is a primary focus, as evidenced by a Mitigated Negative Declaration under CEQA and the requirement for various permits, including a 1602 Lake and Streambed Alteration Agreement and a Section 401 Clean Water Act Permit. Strict protocols are in place for the delineation of Environmentally Sensitive Areas using high-visibility markings and the implementation of biological inspection measures for pipes, culverts, and open trenches. The project also adheres to Title VI of the Civil Rights Act and the Americans with Disabilities Act to ensure non-discrimination and accessibility.
Caltrans, District 4 - Bay Area/Oakland

POSTED

about 12 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

This contract involves a small business set-aside project for parking lot repair at the US Coast Guard Station Sand Key in Clearwater, Florida, with an anticipated award date approximately ten days after the solicitation closes on April 12, 2025. The scope of work includes milling, cleaning, applying tack coat, filling low areas, installing new asphalt with a surface course of approximately one inch, and re-striping the parking lot, which covers roughly 25,000 square feet. The project emphasizes quality, safety, and adherence to federal, state, and local regulations, with specific requirements for storm protection, material handling, site cleanup, and security measures for personnel and equipment. Contractors must submit detailed proposals including cost breakdowns for labor, supervision, materials, and equipment, along with past performance documentation to demonstrate capability. The solicitation specifies that proposals are due by 3 p.m. EST on April 2, 2025, and should be submitted via email or mailed to the designated USCG address. A site visit is scheduled for March 19, 2025, to allow prospective bidders to assess the project location. The contract will incorporate relevant FAR clauses related to construction, safety, site conditions, and wage requirements, and contractors are required to be registered and in active status in the System for Award Management (SAM). The project mandates strict compliance with safety protocols, proper handling and storage of materials, and security procedures for personnel identification and site access.

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Clearwater Beach, FL, 33767, USA

Set-Aside

SBA

Documents

3

Solicitation 30321PR250000004 - USCG Station Sand Key Parking Lot Repair

PDF, High priority: read this firstrfq
High

aerial+image+sand+key+parking+lot.png

PNG

SOW+Sand+Key+PARKING+LOT.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base MIAMI(00028)
Contacts2 people available
OfficeMIAMI, FL, 33132, USA
Office AddressMIAMI, FL, 33132, USA

Full Description

Show more
This combined synopsis/solicitation for services prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued. The solicitation number is 30321PR250000004 Applicable North American Industry Classification Standard (NAICS) codes are: 237310 Highway, Street, and Bridge Construction This requirement is for a fixed price contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, Best Value. When submitting your proposals, request a price breakdown of the following: Cost of labor and supervision Cost of materials and equipment needed to perform the work. Prospective contractors shall also provide along with your proposal past performance documents which will be used to determine expertise to perform such work. Contract will be awarded to the vendor who can perform the work outlined in the provided SOW in the time frame needed by unit. Past Performance and Cost factors will also be used when selecting the award. Anticipated award date: 10 business days after close of solicitation, OOA 12 April 2025 Quotes are to be received no later than close of business (3 p.m. EST) on Tuesday April 2, 2025. Quotes can be email to: Mehdi.Bouayad@uscg.mil Quotations sent via the US Postal Service or hand delivered should be sent to: Commanding Officer USCG Base Miami Beach (P&C) Attn: Mehdi Bouayad 16001 SW 117th Ave Miami, FL 33177 Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will be issued in Beta.Sam.Gov (SAM.gov | Workspace) ***** SITE VISIT**** Wednesday Mar 19, 2025 AT 10:00 AM EST AT PROJECT SITE (USCG Station Sand Key) 1375 Gulf Blvd, Clearwater FL, 33767 POC: BMC JAMES E. PINTO Email: James.E.Pinto@uscg.mil Phone: 352-346-4215 SCOPE OF WORK: United States Coast Guard Station Sand Key Parking Lot Repair to include. 1. Mill transition areas. 2. Power blow and broom loose dirt and debris from paving area. 3. Tack coat entire paving area with RC-70 tack coat. 4. Fill in low areas with asphalt. 5. Install new asphalt, HMAC Type S-3 surface course asphalt approximately 1 inch depth. 6. Roll and compact with Multi ton vibratory roller and vibratory plate compactor. 7. Sand entire lot to help with tire scuffing once paved. 8. Re -stripe to current layout. 9. The parking lot is approx. 25,000 sq ft Q&A's: Questions concerning the work requested must be sent to Mehdi.Bouayad@uscg.mil by COB (3 PM EST) on Monday 24 March 2025. These Q&A's will be answered and posted to this solicitation as an amendment prior to close of solicitation. STORM PROTECTION Should warnings of extreme weather (such as storm surge, wind of gale force) be issued, the Contractor shall take every practicable precaution to minimize danger to personnel, the work and adjacent property. Precautions shall include, but not be limited to, closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing fencing, scaffolding and other temporary work. DELIVERY AND STORAGE Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations. Damaged or defective items shall be replaced. Location of storage and staging area shall be designated by the POC. The contractor will be responsible for security of all materials and equipment. RECEIPT OF MATERIALS Shipment of equipment, materials, and supplies shall be addressed to the Contractor - not the Government. The Contractor must be on hand to accept shipments; the Government will not accept shipments. CLEANUP The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials on a daily and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpsters. SECURITY Working Personnel List. The Contractor shall provide the COR BMC James Pinto with a list of names of all personnel who will be working on the site. The Contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site. Personnel Identification. All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual's driver's license, or a company issued ID. The identification must be laminated, and show facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises. QUALITY Quality of Contractor Furnished Material. Materials supplied by the Contractor shall be of a quality conforming to applicable Federal specifications and lead and asbestos free. WARRANTIES All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government. FINAL INSPECTION AND ACCEPTANCE When the work is complete and ready for final inspection, submit a written request to schedule final inspection to the Government. Prior to such requests, all submittals must be complete and approved. Such requests shall allow a minimum of (3) days notice prior to final inspection date. SAFETY General The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the service area, prevents damage to property and avoids work interruptions. The Contractor shall provide appropriate safety measures including but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules and regulations. Compliance The Contractor is specifically required to comply with the requirements of the U. S. Army Corps of Engineers "Safety and Health Requirements Manual" (EM 385-1-1, latest version available) and the - Accident Prevention clause (FAR 52.236-13). Once accepted, this safety plan shall become part of the contract requirements. Note: This review/acceptance does not in any way relinquishes the Contractor from responsibility for work site safety nor the obligation to comply with the OSHA regulations found in 29 CFR 1910 & 1926 or any other State or Local safety law, rule or regulation applicable to the contract work. The Coast Guard will cooperate fully with the Department of Labor (Occupational Safety and Health Administration) in their enforcement of OSHA regulations. APPLICABLE FAR CLAUSES FAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items). ATTACHED BY REFERENCE 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS 52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984) 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984) 52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995) Work hours: Monday through Friday, 0730 - 1800 (7:30 am - 6 pm) No weekends or Holidays authorized. See attached applicable FAR Clauses by reference. Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov. Request Company's Tax ID information and UEI number. Vendors providing an offer must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an - ACTIVE status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS