This Award Notice opportunity from Department Of Agriculture was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
USFS Swim Dock Replacement - Sullivan Lake Campground, Washington
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The U.S. Forest Service is awarding a firm-fixed-price contract for the removal and replacement of a swim dock at Sullivan Lake Campground in Metaline Falls, Washington, under solicitation number 1240BD26Q0026, with proposals due by April 2, 2026. The contract is a total small business set-aside, requiring all offerors to self-certify as small businesses and remain eligible throughout performance. The new dock must be either a 15’x15’ to 16’x16’ metal frame structure using aluminum or galvanized steel with composite decking, or an HDPE modular system, featuring non-slip surfaces, black edging, detachable swim ladders, and a flexible anchoring system capable of securing the dock in up to 30 feet of water over rocky or sandy substrates. Materials must be UV-stabilized and thermally durable to withstand freeze/thaw cycles, and all work must be completed by September 1, 2026, with coordination to align with optimal lake water levels. The contractor is responsible for full removal and environmentally compliant disposal of the existing dock, installation of the new structure, and delivery of all components to the site under FOB Destination terms, bearing all transportation costs and risks. Contract performance is governed by a comprehensive set of FAR clauses, including mandatory compliance with the Buy American Act for domestic content, labor standards under the Service Contract Labor Standards, and requirements for paid sick leave and minimum wage under Executive Orders. Offerors must also certify compliance with anti-discrimination, whistleblower rights, and anti-trafficking mandates, along with SAM.gov registration and maintenance obligations. Evaluation is based on a trade-off approach, prioritizing technical acceptability—verified through submitted manufacturer spec sheets, material certifications, and demonstration of non-slip surfaces and compliance with dimensional and safety requirements—followed by price reasonableness and regulatory compliance. All proposals must be submitted electronically by email to Mindy Hickman, the contracting officer, and must include a delivery schedule, complete pricing for three CLINs covering the dock, installation, and removal, and supporting documentation such as product literature and project timelines. Acceptance occurs on-site at the campground upon final inspection by the Contracting Officer’s Representative, requiring submission of a Final Inspection Report and invoices via IPP.gov within 10 days of acceptance. No packaging, preservation, or marking requirements beyond origin labeling for Buy American compliance are specified, and no options, key personnel
General Info
Contract Value
$44,100Place of Performance
Set-Aside
Award Issued Date
Potential End Date
September 1, 2026Documents
2AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- AMC-0166 CRW ASR Public AnnouncementOpen now, due in 32 days
- MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 5 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Combined Synopsis
Contract was awarded
Organization & Contact Information
Full Description
This solicitation replaces the previously cancelled notice 1240BD26Q0003. Upon review of the market and initial offers, the Government has determined that HDPE modular structures are a technically acceptable and highly advantageous alternative to metal-frame construction. To ensure maximum practicable competition and provide all capable vendors—including those whose previous offers did not meet the original metal-only specification—an opportunity to bid on this revised requirement, the Government is re-soliciting this project.
(i) This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice.
(ii) Description of Requirement: The USDA Forest Service, Colville National Forest, requires the removal and disposal of an existing swim dock and the furnishing and installation of a new replacement at Sullivan Lake Campground.
- Technical Choice: Offerors must select and quote only ONE material option:
- Option 1 (Metal Frame) or
- Option 2 (HDPE Modular).
- Location: Sullivan Lake Campground, Metaline Falls, WA.
Evaluation: Award will be made to the responsible offeror whose quote, conforming to the solicitation, is the most advantageous to the Government, price and other factors considered. The Government will use comparative evaluation procedures per FAR 12.602.
More opportunities from Department Of Agriculture → Csa Northwest 2 Usda-Fs
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
