Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on February 25, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USNS Miguel Keith Berthing Modules

Closed
N3220521Q0047Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332311
New
Federal
Solicitation_S-280C/G Vehicle Mounted Shelter
Solicitation # W912CH-26-R-A096
The Army Contracting Command - Detroit Arsenal is soliciting proposals for a five-year, Firm-Fixed-Price, Indefinite Delivery/Indefinite Quantity contract for the manufacture and delivery of four variants of the S-280C/G Vehicle Mounted Shelter. These lightweight tactical shelters, available in shielded and unshielded configurations with or without mobilizer adapter kits, are designed to protect personnel and sensitive electronic equipment from demanding field environments and electromagnetic interference. The contract has a minimum guaranteed value of 100,000 dollars and a maximum estimated ceiling of 4,000,000 dollars. This is a 100 percent small business set-aside under NAICS 332311. Award will be based on a best-value tradeoff process, weighing technical factors and price with approximately equal importance. Technical evaluation focuses on EMI shielding design and manufacturing processes. Mandatory requirements include First Article Testing and strict adherence to the government-owned Technical Data Package and ASTM E1975-22 standards. The contractor must also provide technical publications and provisioning data. Deliveries are FOB Destination, with an estimated distribution of 75 percent CONUS and 25 percent OCONUS, and a maximum sustained production rate of 20 shelters per month. Proposals must be submitted electronically by October 30, 2026.
W6QK Acc- Dta

POSTED

about 10 hours ago

DEADLINE

in 10 days

General Info

NAICS

332311 - Prefabricated Metal Building and Component Manufacturing

Place of Performance

VA

Set-Aside

SBA

Documents

4

670-8614092+MILCREW+MODIFICATION+OF+SOF+TEU.pdf

PDF

MGK+Berthing+Modules+-+Vendor+Questions+%2820210222+Final%29.docx

DOCX

N3220521Q0047.docx

DOCX

Vendor+Questions+2+-+MGK+Berthings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Mschq Norfolk
Contacts2 people available
OfficeNORFOLK, VA, 23511-2313, USA
Office AddressNORFOLK, VA, 23511-2313, USA

Full Description

Show more
This item requires Contractor support for the fabrication of a commercially available Portable Accommodation Module(s) (PAM) to be used as additional berthing and sanitary space aboard T-ESB class ships. The PAM will need to be modified slightly to ensure it meets the Government's berthing and sanitary requirements. The required delivery date is 30 Sept 2021. See the attached solicitation for PWS. Amendment 01 issued 26 January 2021 to respond to a bidder question. Bidder Requirements: - This specification is written for a Contractor that has a previous ABS approved PAM design(s) for USCG inspected vessels which, when modified, will meet the outfitting needs of this contract. This previously approved design or design details will be referred to as the parent design. Contractor shall return the following information with bid: Q: Is this Solicitation put out for a certain company? Most companies are not going to have a design approved in hand. A: There were companies (not just one) responding to the initial RFI that were able to earmark past productions that were ABS approved, PAM designs. These past productions would allow the government to reference the design maturity of future design work needed to produce these berthing module(s) for USNS MIGUEL KEITH. The contractor should be able to provide proven history of design and the ability to comply with the needed services and US Naval structural requirements. Amendment 02 to add Enclosures. See attached. Amendment 03 is to extend the due date for quotes. Quotes will now be due via email 26 Feb. 2021 at 12 noon EST. Amendment 04 is to post bidder questions. See attached. Please email Tiffany.L.Allen@navy.mil for the APL Example (Enclosure 02). Amendment 05 is to post bidder questions and to extend due date for quotes. Quotes will now be due via email 2 March 2021 at 12 noon EST. **Cutoff for all questions will be Friday 26 Feb. 2021 at 10 am. EST.

More opportunities from Department Of Defense → Mschq Norfolk

Same awarding agency

NAICS: 483111
New
Federal
US EAST COAST/GULF COAST JONES ACT TANKER (EXTENDED TERM CHARTER)
Solicitation # SS-27-005
The Military Sealift Command is conducting a sources sought request for information under solicitation SS-27-005 to identify the availability and estimated pricing for an extended term charter of one clean, U.S. flag Jones Act compliant tanker. The vessel must be capable of carrying at least 280,000 BBLs of clean product, such as F76, JP5, JP8, or JA1, with a laden draft not exceeding 12 meters and a minimum speed of advance of 13 knots in moderate weather. While the primary operating area is the US East Coast and Gulf Coast, the vessel must possess worldwide capability. The proposed charter period begins on December 9, 2027, consisting of a base year and four subsequent option years, extending through November 6, 2032. Technical requirements include the installation of three CONSOL stations within six months of delivery and one Fuel Delivery Station on the port side within one year of award. The Fuel Delivery Station must comply with NTTP 4-01.4, IEC60533 electrical standards, and Federal Specification RR-W-410 for spanwires, with the ability to operate continuously in Sea State 5 conditions. Interested parties must provide company history, security clearance status, and estimated pricing for the daily charter rate, station installations, and FDS maintenance. The procurement is managed by the Strategic Sealift Program Support Office in Norfolk, Virginia, with delivery occurring on the US Gulf Coast and redelivery at the charterer's option across the East, Gulf, or West Coasts.
Deep Sea Freight Transportation

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details
NAICS: 488390
New
Federal
Underwater Inspection in Lieu of Dry-docking (UWILD) of the USNS SACAGAWEA
Solicitation # N3220527Q7018
Solicitation N3220527Q7018 is a request for quotation for commercial diving services to perform an Underwater Inspection in Lieu of Dry-docking (UWILD) for the USNS SACAGAWEA in Guam. Issued by the Department of Defense via Mschq Norfolk, this firm-fixed-price contract requires the contractor to conduct inspections as an alternative to a standard dry-docking survey, adhering to specific NAVSEA drawings for capacity, docking, and shell expansion. The period of performance is scheduled from November 16, 2026, to November 26, 2026. Key deliverables include electronic PDF condition reports for any discovered deficiencies, which must be submitted within 24 hours of discovery. The acquisition is not set aside for small businesses, though a HUBZone price evaluation preference is available. Award will be based on best value, determined through an overall comparative analysis of technical capability and past performance. All quotes must be submitted via the Procurement Integrated Enterprise Environment (PIEE) portal by October 26, 2026, with an anticipated award date of November 6, 2026. Compliance requirements include the execution of a non-disclosure agreement, adherence to high-voltage safety protocols, and the use of the Wide Area WorkFlow (WAWF) system for electronic invoicing.
Other Support Activities for Water Transportation

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS