USNS MT WHITNEY SSTG ROTOR REFURBISHMENT

Awarded
N40442-10-T-5063Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, solicitation N40442-10-T-5063, tasks a contractor with the comprehensive refurbishment of the USNS MT Whitney ship service generator rotor. The scope of work includes the transportation of the rotor from a Norfolk, Virginia warehouse to the contractor's shop for complete disassembly, cleaning, and inspection. Key technical requirements involve the removal and replacement of collector rings and leads, a wet rewind of field coils using specific manufacturer standards, and vacuum impregnation treatment with Class H insulating varnish. The contractor must also address known shaft run-out and flange perpendicularity issues, with any necessary corrections subject to a change order. Rigorous testing and quality assurance are mandatory, including NDT on the shaft, Megger readings, static impedance tests, and Polarization Index testing. The rotor must undergo dynamic and high-speed balancing, including a 12-hour run at rated speed, to ensure stability. Upon completion, the contractor is responsible for reassembling the unit, crating it for international shipment using certified treated wood, and returning it to the MSC Warehouse in Norfolk. A final comprehensive report in English detailing all findings, tests, and corrective actions must be submitted.

General Info

Contractor will refurbish, test, and return the USNS MT Whitney ship service rotor.

Contract Value

$143,734.2

NAICS

332710 - Machine Shops

Place of Performance

Location/Quantity: Rotor is available for survey at the Military Sealift Fleet Support Command warehouse located in Building LP, NORFOLK, VA, 23511, USA

Set-Aside

NONE

Award Issued Date

Documents

5
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityspecifications
Low
ZIP
RTF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jul 12, 2010 to Jul 23, 2010. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 23, 2010 to Jul 12, 2010. The notice description changed.

Deadline changed

Response deadline changed from Jul 12, 2010 to Jul 23, 2010.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Military Sealift Flt Supp Command Norf
Contacts2 people available
OfficeNORFOLK, VA, 23511, USA
Office AddressNORFOLK, VA, 23511, USA
Contacts
Melanie A. BarrettContracting Officer
Eddrian LoganCONTRACT SPECIALIST

Full Description

Show more
7.0 STATEMENT OF WORK REQUIRED 7.1 Provide all labor, material, equipment, and transportation. Coordinate performance of required inspections with ABS Surveyor and provide certification of work accomplished. 7.2 Remove ship service generator rotor and crate from warehouse to shop. 7.3 Completely disassemble the rotor and thoroughly clean and examine all parts. Protect machined surfaces. 7.4 The rotor was treated with Vacuum impregnation treatment (VPI) at time of reconditioning. It is expected that 70% of the retainer rings and other fasteners will break upon removal. Contractor is to take this into consideration when estimating for retainer rings removal (with necessary removal of broken fasteners, drilling, tapping, provision of new fasteners, and reinstallation of same). 7.5 The following work must be accomplished prior to fabrication and installation of coils. a. Inspect and dimensionally measure shaft, and flanges. It is known that the shaft has a run out exceeding maximum allowance and flange may be out of perpendicularity. b. Perform NDT on shaft flange and journal. c. Submit as found condition report and technical proposal for recommended repairs. d. Correction (If Required) of shaft and flange distortion, shaft finishing, coupling dressing will be subject to issuance of a change order. 7.6 Remove, manufacture and replace collector rings assemblies. 7.7 Manufacture, replace collector leads. 7.8 Completely strip and clean the field coils in accordance with paragraph 6.26.5 of reference 2.1. 7.9 Wet Rewind using new wire of proper size/type and wrapping as specified by the generator manufacturer in reference 2.1 or equivalent. The rotor has been modified to accept an additional two bridges per pole (Total of 18) to preclude the bulging of rotor windings in the future. 7.10 Windings and armature shall be vacuum impregnated (VPI) with Class H thermal capability insulating varnish (DURAGUARD or equivalent) and baked in accordance with IEEE 45 (or equivalent international standard) requirements. Cure according to manufacturer's specifications. 7.11 Take (Megger) reading for insulation resistance and grounds. Record and provide readings. 7.12 Perform Static impedance test / Volt drop test across each field coil. Compare to determine that there are no short turns in any of the field coils. Each reading shall be within 2% of the source voltage. Record and provide readings. 7.13 Perform Polarization Index (PI) test. Minimum PI readings is 2.0. 7.14 Perform Rectifier diode test meg-ohm for complete rotor circuit 7.15 Perform coil resistance test for imbalance between phases 7.16 Dynamically balance the rotor. Final unbalance shall not exceed the manufactur'er's specifications for a new unit or, in the absence of this, the value determined by: 4 x weight of rotor (lbs.) Unbalance (ounce inches) = -------------------------- Max. operating RPM of unit 7.17 Accomplish a High Speed Balance of the rotor. Run the rotor a Rated speed for 12 Hours. Upon the completion of the 12 hour run time accomplish the requirements of Paragraph 7.16 to ensure that the rotor is Dynamically Balanced prior to shipment. Repeat the requirements of this paragraph until the angle and amplitude remains consistant. 7.18 Completely reassemble the rotor. Inspect. Crate for shipment using Certified Treated Wood required for International Shipment. Use of existing shipping container is acceptable as long as it's condition is acceptable for reuse. 7.19 Return rotor to MSC Warehouse located in Building LP-26 on Naval Operations Base, Norfolk Virginia. 7.20 Submit a comprehensive report in English stating condition(s) as found, test(s) performed with relative results, technical recommendations made and corrective action taken and "as released" condition. Technical Manual S9311-BP-MMM-010 is now attached for download if needed. Zip file of pictures is also attached with several shots of each end of the Rotor as well as the sides.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS