Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 8, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USS Gunston Hall SSDG NR 2

Awarded
N5005420PR00679Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334511
New
Federal
Egyptian Navy Autonomous INTelligence System (AINTS) Platform Integration
Solicitation # N0003926RE014
The Naval Information Warfare Systems Command (NAVWAR) is soliciting proposals under RFP N0003926RE014 for the Egyptian Navy Autonomous Intelligence Systems (AINTS) Platform Integration. This Foreign Military Sales effort supports the Egyptian Navy by procuring the design, engineering, procurement, integration, testing, installation, training, and field service representative (FSR) services for AINTS platforms. The scope of work includes the delivery of specific hardware, including six V-BAT UAVs, six ESM (2-40 GHz) units, and six COMINT (2 MHz) units, along with unmanned surface vehicles (USVs) and spare parts. The contract is estimated for a three-year period of performance with an award window between June 2027 and June 2030. The acquisition utilizes a hybrid pricing structure consisting of Cost Plus Fixed Fee (CPFF) for labor, cost-reimbursement for travel and other direct costs, and Firm-Fixed-Price for materials and equipment. Award will be based on best value, where non-cost factors, specifically technical and management approaches, are significantly more important than cost. Due to the sensitive nature of the requirements, the Statement of Work is designated as Controlled Unclassified Information (CUI), requiring interested Department of Defense contractors to submit a signed Non-Disclosure Agreement to gain access. Proposals must be submitted via the PIEE SOL module and include detailed volumes covering contractual information, cost narratives, and technical capabilities.
Naval Information Warfare Systems

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 334511
New
PROCESSOR,DISPLAY A — 7010015222097 — N0038326QNB29
Solicitation # N0038326QNB29
Solicitation N0038326QNB29, issued by NAVSUP Weapon Systems Support Philadelphia, is a total small business set-aside for the teardown, evaluation, repair, and modification of LC Processors (NSN 7B22-01-522-2097). The scope includes an initial induction of 17 units with option pricing requested for up to 25 units over a three-year period, with a possible three-year extension. The contractor is responsible for providing all labor, facilities, and tooling to return units to a Ready For Issue condition, as the government will not provide manufacturing aids. Key technical requirements include the use of SAE-AS22759 series wire instead of MIL-W-81381 and compliance with MIL-STD-130 for markings and ISO 9001 or SAE AS9100 for quality management. The government will make a single award based on the most advantageous offer, prioritizing past performance over price. Award evaluation includes SPRS risk assessments for item, price, and supplier risk. Contractual terms include a one-year warranty after delivery, FOB Destination shipping, and a 90-day delivery window. Specific provisions are in place for Beyond Economical Repair and Missing on Induction determinations, both requiring DCMA concurrence. All work must be performed at the identified facility, and any changes to repair manuals or sources require approval from the Procuring Contracting Officer. Packaging must adhere to MIL-STD-2073-1, and electronic invoicing is required via the Wide Area Workflow system.
Navsup Weapon Systems Support

POSTED

about 16 hours ago

DEADLINE

in about 1 month

General Info

NAICS

334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

Place of Performance

Norfolk, VA, 23511, USA

Set-Aside

NONE

Documents

1

OTHER+THAN+FULL++OPEN+COMPETITION+UNDER+SAT+rev+1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Justification (J&A)

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Mid Atlantic Reg Maintenance Ctr
Contacts2 people available
OfficeNORFOLK, VA, 23511-2124, USA
Office AddressNORFOLK, VA, 23511-2124, USA

Full Description

Show more
Contractor shall complete remaining work on the attached SAP SSDG #2 Attached Lube Oil Pump, Injection Pumps and Nozzles, Attached Fuel Oil Pump, Generator Bearing Drain Pump, Attached Sea Water Pump, attached Jacket Water Pump, Air Start Distributor, Air Start Check Valves, Resilient Mounts, Exhaust Piping, Lube Oil Pre-lube Pump, Vertical Drive, Blower, Lube Oil Cooler, Jacket Water Cooler, Over-Speed Device, Piston and Liner Assemblies, Complete a flush of the entire lube oil system, Conduct the bearing run in, load testing for breaking in cylinders and post inspections with a load bank. - Justification for Sole Source are that OEM Fair Banks Morse (FME) has already completed 80 percent of the work on NR2 Ships Service Diesel Generator (SSDG). FME is also the original manufacture of the equipment. Government will mitigated all non-serviceable parts. Contractor shall provide to the Government, a report listing non-serviceable parts in the form of a hard copy or approved transferrable media. Government to provide isolating and tagging out of system, draining, disposal, filling and venting system fluids. Contractor shall install and remove temporary closure to prevent entrance foreign matters and maintain system cleanliness of Level II. Prior to starting, ensure no foreign material exists on adjacent surfaces that could contaminate the internal areas upon reassembly of piping joints. Inspect each fastener intended for reuse for wear and defects. Submit one legible copy, in hard copy or approved transferrable media of each enclosures to the Government. Equipment (NR 2 SSDG Located in Auxiliary Machinery Room Number One 5-43-0-E): Attached Lube Oil Pump Injection Pumps and Nozzles Attached Fuel Oil Pump Generator Bearing Drain Pump Attached Sea Water Pump Attached Jacket Water Pump Air Start Distributor Air Start Check Valves Resilient Mounts Exhaust Piping Lube Oil Pre-lube Pump Vertical Drive Blower Lube Oil Cooler Jacket Water Cooler Over-Speed Device Piston and Liner Assemblies Attached Lube Oil Pump Process Control Procedures (PCP) for planned availabilities, submission shall be no later than 14 days prior to start of the required process, or as otherwise approved by the SUPERVISOR. Attachment A shall be used for PCP development; ensure each element is contained within its respective section. Develop and submit one legible copy of a Process Control Procedure (PCP), in approved transferrable media, to the SUPERVISOR for approval the requirements of for the accomplishment of MS3112-OP-002-3, Enclosure 2, Section 3.7.2, step D thru P of ref b. Install the equipment in accordance with MS3112-OP-002-3, Enclosure 2, Section 3.7.2, step D thru P of ref b. Government shall witness each backlash in accordance with MS3112-OP-002-3, Enclosure 2, Section 3.7.2, step D and M of ref b. Accomplish an operational test of the equipment at 100 percent engine load at normal operating system temperature and pressure in accordance with MS3112-OP-002-3, Enclosure 2, Section 3.8 of ref b, and under the direction of the Diesel Engine Inspector (DEI). Allowable leaks, abnormal noise or vibration at normal operating pressure and temperature: None, Repair any leaks found. Submit one legible copy, in hard copy or approved transferrable media, of a report listing the result of the requirements of MS3112-OP- 002-3, Enclosure 2, Section 3.10, Examination, Test, and Repair Action Record of 2.2, including each inspection, torque value, and reading required to the SUPERVISOR. Injection Pumps and Nozzles Accomplish an operational and tightness test of the injections pumps and nozzles, using Chapter 2 of ref a, and under the direction of the Diesel Engine Inspector (DEI). Final testing shall be completed at 100 percent engine load. Allowable leaks, abnormal noise or vibration at normal operating pressure and temperature: None, Repair any leaks found. Attached Fuel Oil Supply Pump Develop and submit one legible copy of a Process Control Procedure (PCP), in approved transferrable media, to the SUPERVISOR for approval the requirements of for the accomplishment MS3112-OP-002-4, Enclosure 2, Section 4.6.3, step A thru G of ref b. Install the equipment in accordance with MS3112-OP-002-4, Enclosure 2, Section 4.6.3, step A thru G of ref b. Accomplish an operational test of the equipment at 100 percent engine load at normal operating system temperature and pressure in accordance with MS3112-OP-002-4, Enclosure 2, Section 4.8 of ref b, and under the direction of the Diesel Engine Inspector (DEI). Allowable leaks, abnormal noise or vibration at normal operating pressure and temperature: None, Repair any leaks found. Bearing Drain Pump Develop and submit one legible copy of a Process Control Procedure (PCP), in approved transferrable media, to the SUPERVISOR for approval the requirements of for the accomplishment MS3112-OP-002-5, Enclosure 2, Section 5.6.3, step A thru G of ref b. Install the equipment in accordance with MS3112-OP-002-5, Enclosure 2, Section 5.6.3, step A thru G of ref b. Accomplish an operational test of the equipment at 100 percent engine load at normal operating system temperature and pressure in accordance with MS3112-OP-002-4, Enclosure 2, Section 5.8 of ref b, and under the direction of the Diesel Engine Inspector (DEI). Allowable leaks, abnormal noise or vibration at normal operating pressure and temperature: None, Repair any leaks found. Attached Seawater Pump Develop and submit one legible copy of a Process Control Procedure (PCP), in approved transferrable media, to the SUPERVISOR for approval the requirements of for the accomplishment of MS3112-OP-002-1, Enclosure 2, Section 1.7.2, step D thru P of ref b. Install the equipment in accordance with MS3112-OP-002-1, Enclosure 2, Section 1.7.2, step D thru P of ref b. Government shall witness each backlash in accordance with MS3112-OP-002-6, Enclosure 2, Section 1.7.2, Step F and Step J of ref b. Accomplish an operational test of the equipment at 100 percent engine load at normal operating system temperature and pressure in accordance with MS3112-OP-002-1, Enclosure 2, Section 1.7 of ref b, and under the direction of the Diesel Engine Inspector (DEI). Allowable leaks, abnormal noise or vibration at normal operating pressure and temperature: None, Repair any leaks found. Submit one legible copy, in hard copy or approved transferrable media, of a report listing the result of the requirements of MS3112-OP- 002-1, Enclosure 2, Section 1.10, Examination, Test, and Repair Action Record of ref b, including each inspection, torque value, and reading required to the SUPERVISOR. Attached Jacket Water Pump Develop and submit one legible copy of a Process Control Procedure (PCP), in approved transferrable media, to the SUPERVISOR for approval the requirements of for the accomplishment of MS3112-OP-002-2, Enclosure 2, Section 2.7.2, step E thru T of ref b. Install the equipment in accordance with MS3112-OP-002-2, Enclosure 2, Section 2.7.2, step E thru T of ref b. Government shall witness each backlash in accordance with MS3112-OP-002-2, Enclosure 2, Section 2.7.2, Step H and Step J of ref b. Accomplish an operational test of the equipment at 100 percent engine load at normal operating system temperature and pressure in accordance with MS3112-OP-002-2, Enclosure 2, Section 2.7 of ref b, and under the direction of the Diesel Engine Inspector (DEI). Allowable leaks, abnormal noise or vibration at normal operating pressure and temperature: None, Repair any leaks found. Submit one legible copy, in hard copy or approved transferrable media, of a report listing the result of the requirements of MS3112-OP- 002-2, Enclosure 2, Section 2.10, Examination, Test, and Repair Action Record of ref b, including each inspection, torque value, and reading required to the SUPERVISOR. Air Start Distributor Develop and submit one legible copy of a Process Control Procedure (PCP), in approved transferrable media, to the SUPERVISOR for approval the requirements of for the accomplishment ref a, section 6-6.34.4, step A thru F. Install the equipment in accordance with ref a, section 6-6.34.4, step A thru F. Government shall witness the timing in accordance with ref a, 6-6.34.4 step D. Accomplish an operational and tightness test of the air start distributor, using Chapter 2 of ref a, and under the direction of the Diesel Engine Inspector (DEI). Allowable leaks, abnormal noise or vibration at normal operating pressure and temperature: None, Repair any leaks found. Air Start Check Valves Accomplish an operational test of the equipment listed at 100 percent engine load at normal operating pressure and temperature, using ref a for guidance. Allowable leakage: None, Repair any leaks found. Resilient mounts Accomplish visual inspection and verify height using ref g for guidance. Government MARMC code 264 Diesel Inspector shall witness height inspection. Exhaust piping Align exhaust piping to exhaust elbows and bellows, replace exhaust gaskets. Accomplish an operational test of the equipment at 100 percent engine load at normal system pressure and temperature, using ref a for guidance. Allowable leakage: None, Repair any leaks found. Lube Oil Pre-lube Pump Accomplish an operational test of the equipment at normal operating temperature and pressure in accordance with MS3112-OP-002-7, Enclosure 2, Section 7.8 of ref b. Government MARMC code 264 Diesel Inspector shall witness inspection. Allowable leakage: None. Repair any leaks found. Ensure pump discharge pressure is 50 PSIG at 130 degrees Fahrenheit. Vertical Drive Accomplish an operational test of the equipment listed at 100 percent engine load at normal operating pressure and temperature, using ref a for guidance. Conduct a post operational inspection of the equipment listed, in accordance with ref a, 4-3.10. Blower Accomplish an operational test and certification of the equipment listed at 100 percent engine load at normal operating pressure and temperature, using ref a for guidance. Allowable leakage, abnormal noise or vibration at normal operating pressure and temperature: None, Repair any leaks found. Lube Oil Cooler Accomplish an operational test of the equipment at 100 percent engine load at normal system pressure and temperature, using ref f for guidance. Allowable leakage: None, Repair any leaks found. Jack water Cooler Accomplish an operational test of the equipment at 100 percent engine load at normal system pressure and temperature, using ref f for guidance. Allowable leakage: None, Repair any leaks found. Over-Speed Device Accomplish a test of engine over-speed device after the loaded run in is completed, using ref a for guidance. Government MARMC code 264 Diesel Inspector shall witness Over-speed. Make adjustments as required. Flexible Drive Gear Train Accomplish a post 100 percent loaded run in inspection on the flexible drive gear train and a post run inspection of equipment listed using ref a for guidance. Government MARMC code 264 Diesel Inspector shall witness inspection. Timing Chain Accomplish a post 100 percent loaded run in on equipment listed, and a post run inspection to verify tension on the timing chain, using ref a for guidance. Government MARMC code 264 Diesel Inspector shall witness inspection. Adjust as required to attain proper tension. Piston and Liner Assemblies Fill and flush out jacket water system with distilled water provided by ships force to ensure there is no debris prior to engine start. Accomplish the alignment of engine block and generator using ref h as guidance. Couple and torque engine to generator coupling using ref h as guidance. Government MARMC code 264 Diesel Inspector shall witness alignment and coupling torque. Develop and submit one legible copy of a Process Control Procedure (PCP), in approved transferrable media, to the SUPERVISOR for approval the requirements of for the accomplishment of ref C for a Hot Lube Oil Flush. All check points shall be witnessed by government MARMC code 264 Diesel Inspector. Maintain and submit completed copies of enclosures 1 through 7 of ref C upon completion of hot lube oil flush. Develop and submit one legible copy of a PCP, in approved transferrable media, to the SUPERVISOR for approval the requirements of the bearing run in, load testing for breaking in cylinders and post inspection of NR 2 SSDG in accordance with ref d, paragraph 6-2.2.1, steps A through H and table 6-1b. All inspections shall be witnessed by government MARMC code 264 Diesel Inspector. Provide a load bank for load testing NR 2 SSDG at 100 percent load. Make a temporary access cut for the routing of the load bank cables. Submit one legible drawing or sketch of a temporary access cut to the ship structure for the load bank testing cables to the SUPERVISOR 3 days prior to making the cuts or removing the bolted/riveted access. Include a copy of the weld procedure or approved weld procedure number with the proposed access sketch. Prior to cutting access in the ship/vessel's structure and after layout checkpoint, accomplish positive verification by drilling a pilot hole in the path of the cut to be accomplished. Accomplish welding on temporary access cut in accordance with MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure, paragraph 13, joint design shall be in accordance with MIL-STD-22, Welded Joint Design, workmanship requirements MIL-STD-1689, paragraphs 12 and 14, and final weld inspection shall be in accordance with MIL-STD-1689, paragraphs 6, 7, and 8 / MIL-STD-2035, paragraph 4 / T9074-AS-GIB-010/271, paragraph 8. Accomplish a completion air test of welds on temporary access. Air hose nozzle shall be placed at less than 3 inches, but greater than zero inches, from the area to be tested and pressure directed at the structure under test in a manner most likely to disclose leaks. The minimum nozzle diameter shall be 3/8 inch and the nozzle pressure shall be 90 plus or minus 5 PSIG as monitored at the nozzle. Apply a soapy solution to the opposite side of the structure, associated tank piping, overflow and air escape piping, and inspect for leaks. Government shall witness air test. Restore System Reconnect piping to each component. Piping shall be supported independently and not be pulled or forced into place in such a manner as to impose a strain on connected piping, machinery, equipment and bolting material. Install new piping joint gaskets and fasteners. New materials shall conform to requirements of MIL-STD-777. Allowable leakage: None. Restore the systems to operational status and accomplish an operational test of # 2 SSDG to include testing of components repaired under this SOW, using component tech manual, TME guidance, ship's procedures to prove proper operation and tightness of new and disturbed joints. Allowable external leakage: None References: a: S9311-EK-MMA-010 Rev 3, 1600 KW/900 RPM Diesel Engine Generator Set, LSD 41 Class Ships SSDG Midlife Model Number 38ND8-1/8 b: S9311-DM-HBK-010 Rev 1, US Navy Diesel Engines Fairbanks Morse, 38D 8 1/8 Opposed Piston LSD 41/49 Class Ships c: S9233-DM-HBK-010-002, Flush LSD-41/49 Class Fairbanks Morse 38ND 8-1/8 Diesel Generator Engine Lubricating Oil System and Engine d: S9312-AH-MMA-020 Rev 7, Generator Set Emergency Diesel Submarine e: MIL-STD-777, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships f: S9311-BT-MMC-010, Operation and Maintenance for Heat Exchanger (Alfa Laval), "A", "M", "P" and "V" Series Units g: S9311-B9-TRS-020 Rev 1, FFG-7 Class Series 149 Diesel Engines h: 301-8328931 Rev B, 1600 KW Gen-Set Alignment, Drawing

More opportunities from Department Of Defense → Mid Atlantic Reg Maintenance Ctr

Same awarding agency

NAICS: 332321
New
Federal
Watertight Hatch
Solicitation # N5005427Q0012
Solicitation N5005427Q0012 is a combined synopsis and solicitation issued by the Mid-Atlantic Regional Maintenance Center (MARMC) for the procurement of a new quick acting watertight hatch and coaming assembly for the USS Arlington. This is a total small business set-aside under NAICS code 332321, utilizing Simplified Acquisition Procedures in accordance with FAR Part 13. The required item must be new, as refurbished or used parts are strictly prohibited, and must comply with drawing 167-7317993 REV C and work specification items 168-11-001. Delivery is required by October 10, 2027, with shipping terms set as FOB Destination to DLA Distribution Norfolk RMC PROJ in Norfolk, Virginia. The government will award the contract based on a best value determination, evaluating quotes based on technical capability and price. To be eligible for award, offerors must receive an acceptable technical rating. Submissions must include a detailed unpriced technical quote, a capabilities statement, and lead time for the parts. Responses are due by 4:15 PM on October 27, 2026, and should be emailed to Ariana Seawell. This procurement incorporates specific DFARS requirements for cybersecurity and item unique identification, and requires Joint Certification Program (JCP) certification for accessing technical data. Funding is currently contingent upon the availability of appropriated funds.
Metal Window and Door Manufacturing

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS