Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Utilidor Installation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Eielson AFB, AK, USA

Set-Aside

NONE

Documents

This scope was carved out of W911KB279A007.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

EIE490 Microreactor Synchronization, Eielson AFB, Alaska

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Alaska
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs a utility tunnel system (utilidor) for prime contractors on USACE Alaska District projects at Eielson AFB. Performs trenching and installation of pre-cast or cast-in-place concrete utilidor sections, including sealing and waterproofing for high-water table conditions. Requires heavy lifting equipment for pre-cast sections and specialized subsurface waterproofing. Delivers 4,400 linear feet of installed utilidor.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is set aside for small businesses, including certified DBE, MBE, and WBE firms, across a wide range of NAICS codes related to heavy and specialty construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this solicitation is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 4 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the provision of all necessary materials, tools, and equipment. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for quotations is October 19, 2026, at 1:00 PM. This opportunity is specifically set aside for DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging maximum participation through economically feasible task breakdowns or consortia. Eligible subcontractors must possess a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All selected subcontractors must execute the standard subcontract agreement and meet general insurance requirements.
W.A. Rasic Construction Company

POSTED

about 4 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Department Of Defense → W2SN Endist Alaska

Same awarding agency

NAICS: 237130
New
Federal
EIE490 Microreactor Synchronization, Eielson AFB, Alaska
Solicitation # W911KB279A007
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence through a Request for Information for the EIE490 Microreactor Synchronization project at Eielson Air Force Base, Alaska. This initiative involves the design and construction required to install a 45MWth/5 Mwe nuclear microreactor, specifically focusing on extending water, power, communications, and heating systems to support plant operations. A primary objective is the synchronization of the nuclear microreactor and the Combined Heat and Power Plant with the base electrical and steam heating distribution grids. The project is funded via MILCON with a target budget of approximately 135 million dollars. The project timeline indicates that planning and development began in December 2025, with a planned construction award in fiscal year 2028, substantial completion by October 2030, and fiscal closeout in fiscal year 2031. Key site challenges include a high water table and likely soil contamination, including PFAS. The government is currently evaluating the most effective contracting vehicle, considering options such as a standard FAR-based Firm-Fixed-Price contract or an Other Transaction Authority approach like Construction Manager at Risk. This RFI is voluntary and intended for market research under NAICS code 237130 to determine industry capabilities and the optimal project delivery method.
Power and Communication Line and Related Structures Construction

POSTED

about 20 hours ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS