Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Utility Box and Marker Resetting

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Utility Box and Marker Resetting, managed by DAS Procurement for the state of Connecticut, focuses on resetting utility access points for prime contractors on municipal projects within the City of Waterbury. The scope of work involves raising water service curb boxes to reconstructed grade and resetting sanitary sewer vents and utility marker posts. All work must utilize two-piece gray cast iron water curb boxes in accordance with Technical Specification 13.00 to ensure all access points are adjusted to the current grade. The opportunity was posted on September 24, 2026, with a response deadline of October 28, 2026, at 2:30 PM. Classified under NAICS code 237110, this project requires specialized utility adjustment services to maintain infrastructure accessibility during city reconstruction efforts.

General Info

Subcontract for resetting utility boxes and markers for municipal projects in Waterbury, Connecticut.

Documents

This scope was carved out of ITB 7328.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Lakewood Rd Sidewalk Reconstruction State Project L151-0001

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → DAS Procurement
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Resets utility access points for prime contractors on City of Waterbury municipal projects. Raises water service curb boxes to reconstructed grade and resets sanitary sewer vents and utility marker posts using two-piece gray cast iron water curb boxes per Technical Specification 13.00. Delivers utility access points adjusted to current grade.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive project involves the demolition of existing infrastructure and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC, plumbing, and testing facilities. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified disadvantaged, minority, and women-owned enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 12 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive water infrastructure installation managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope also encompasses electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. The project emphasizes the inclusion of minority, women, and disadvantaged business enterprises, offering assistance with bonding, insurance, and materials to maximize their participation.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 3 days
View Details

More opportunities from Connecticut → DAS Procurement

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS