Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 19, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Utility Monitoring and Control Systems (UMCS)

Closed
W912DY-22-R-0032Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

541512 - Computer Systems Design Services

Place of Performance

AL

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil
Contacts2 people available
OfficeREDSTONE ARSENAL, AL, 35898-0000, USA
Office AddressREDSTONE ARSENAL, AL, 35898-0000, USA

Full Description

Show more
This notice is issued solely for informational and planning purposes and does not constitute a solicitation. The CEHNC intends to solicit and award a single indefinite delivery indefinite quantity (IDIQ) contract for its Utility Monitoring and Control Systems (UMCS), Heating, Ventilating, and Air Conditioning (HVAC) systems, and other automated control and monitoring systems using a proprietary Johnson Control Metasys Building Automation System. The authority for this acquisition is FAR 6.302-1 - Only one responsible source and no other supplies or services will satisfy agency requirements. The proposed sole source is a large business, Johnson Controls Building Automation Systems, Cage Code 4CWR3. Capability requirements are as follows: TECHNICAL REQUIREMENTS: 1. Assuming the Government owns and operates an existing Johnson Controls, Inc., Metasys UMCS at any Army garrison (Camp Swampy as example), is your company able to meet the following requirements? (a) As part of ongoing work at Camp Swampy the Government requires a prospective Contractor shall be licensed and trained in the configuration tool associated with the current Metasys System Extended Architecture (MESA) UMCS with the ability to: Download and restore the archive databases into the Metasys supervisory controllers/engines and UMCS servers, Integrate N1, N2, BACnet, LonWorks, and MODBUS TCP, and generate and simulate the system offline. Contractor shall have the ability to legally procure and install licensed upgrades to the current UMCS. Contractor shall integrate systems utilizing standard point naming conventions and graphics established for the UMCS. The Contractor shall prove capable to integrate existing building level controllers using native N1 and N2 protocol networks into the Metasys UMCS. Contractor shall be able to not only integrate to the existing UMCS but must also be able to configure the UMCS and DDC System in order to provide a fully functioning and operational system. Integration alone shall not be acceptable. 2. Assuming the Government owns and operates an existing Johnson Controls, Inc. Metasys (M5 version) UMCS at any Army Garrison (Camp Pistol as example), is your company able to meet the following requirements? (a) As part of modernization and renovation at Camp Pistol the Government wishes to upgrade the older non-MESA Metasys UMCS to current Metasys System Extended Architecture (assumed to be Version 5.0 or later). The Contractor shall possess the legal rights to the Johnson Controls, Inc. intellectual property (Metasys MESA rev 5.0 or later) which can legally be procured from Johnson Controls, Inc. sources, installed on Government furnished computing equipment (either hardware or virtual servers), configured so as to meet Army Information Assurance (IA) requirements meeting all DoD Information Assurance Certification and Accreditation Process (DIACAP) requirements. To provide a fully complete, usable, and legal installation of Metasys UMCS. The Contractor shall prove capable to integrate existing building level controllers using native N1 and N2 protocol networks into the Metasys UMCS. 3. Assuming the Government owns and operates an existing Johnson Controls, Inc. Metasys MESA UMCS at any Army Garrison (Camp Swampy as example), is your company able to meet the following requirements? (a) As part of ongoing Direct Digital Controls (DDC) upgrades at Camp Swampy, the Government may require new controls to be procured and installed complying with the BACnet Standardized Device Profile, BACnet Building Controller (B-BC), and support BACnet Interoperability Building Blocks (BIBBs) as required by the American National Standards Institute/American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ANSI/ASHRAE) Standard 135-2004, BACnet protocol. Supervisory Controllers/Engines shall be available with on-board I/O, in multiple sizes and capacities, and with LCDs which provide local access to I/O connected to the controller. Supervisory Controllers/ Engines shall be configured utilizing the same configuration tool as utilized for the UMCS. Contractor shall be licensed and trained in the configuration tool (System Configuration Tool) associated with the current Metasys System Extended Architecture UMCS with the ability to: Download and restore the archive databases into the Metasys supervisory controllers/engines and UMCS servers, Integrate N1, N2, BACnet, LonWorks, and MODBUS TCP, and Generate and simulate the system offline. 4. Assuming the Government owns and operates an existing Johnson Controls, Inc. Metasys MESA UMCS at any Army Garrison (Camp Pistol as example), is your company able to meet the following requirements? (a) DDC System controllers shall be configurable utilizing the Johnson Controls Controller Configuration Tool (CCT). Contractor shall be licensed and trained in the CCT. Configuration tool shall be able to configure, simulate, and commission DDC System controllers, expansion modules, application specific controllers, and supervisory controllers with on-board I/O on a Master-Slave/Toke-Passing (MS/TP) bus or wireless mesh network compliant with ZigBee standard. Configuration tool shall be available in a commissioning mode only version which shall be utilized for balancing contractors/ personnel. Configuration tool shall be compatible with a wireless commissioning tool which allows a laptop to communicate to the field bus through Bluetooth wireless communications. DDC System controllers shall be available in multiple sizes and point capacities with integral LCDs which provide local access to I/O and shall have available expansion modules for various I/O expansion levels. The Government is performing market research in order to determine if any other sources are available that possesses the capability to execute the kind of work identified above prior to issuing a request for proposal (RFP). Contractors are invited to review the above requirement and submit a capability statement (not to exceed 10 single-sided pages) that demonstrates capability to meet the requirements in Items 1, 2, 3, and 4 above. Potential contractors must be able to perform all of the duties in the PWS, or be able to form a team that can perform all of the duties in the PWS. Submit responses to this Sources Sought/Intent to Sole Source announcement only via E-mail to jill.m.lawrence@usace.army.mil and lasheena.t.bentley@usace.army.mil. DO NOT SUBMIT A PROPOSAL AT THIS TIME. Do not submit extraneous materials such as cover letters, company brochures, marketing material, or a SF-330. To be considered, submittals must be received via email no later than 1300 hours Central Time, 31 May 2022. Only email submittals will be accepted. Hard copy or fax submittals will not be accepted. The email subject line must be "Metasys SATOC Submittal". Responses will not be returned, nor will they be considered by the Government as offers. Instead, responses to this notice will only be used to determine capability/availability of sources and serve as a supplementary market research tool to determine acquisition strategy. Responders are solely responsible for all expenses associated with responding to this request for information. Task orders will be awarded for work performance through the Continental United States (CONUS), United States Territories, and Outside Continental United States (OCONUS).

More opportunities from Department Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil

Same awarding agency

NAICS: 236220
Federal
HQ USMC Phase 2 Relocatables Progressive Design Build OTA
Solicitation # CEHNC-HQUSMC-10072026
The U.S. Army Corps of Engineers, through the Engineering and Support Center Huntsville, is initiating a competition for the HQ USMC Phase 2 Relocatables project. This effort utilizes a Progressive Design Build approach under 10 USC 2808a Other Transaction Authority for Construction. The project involves the design and construction of ICD 705-compliant Secured Working Areas (SWA) capable of dual accreditation in accordance with ICD/ICS 705, DoD 5200.1, and NSA 94-106. Key technical requirements include 100% Fiber-to-the-Desk infrastructure, STC 50 acoustic attenuation for all interior spaces, and rigorous RF shielding verified through third-party Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT). The scope encompasses a turnkey solution including civil site development, environmental mitigation, life safety, and comprehensive interior design. The total period of performance is 630 calendar days from the Notice to Proceed, with specific timelines requiring site adaptation within 100 days, assembly within one week of delivery, and final hookup and furniture installation within 40 days of delivery. Facilities must be manufactured at the vendor's secure location and delivered to designated project sites. Key personnel, including the Site Superintendent, Site Safety and Health Officer, and Quality Control Representative, must be U.S. citizens. The government will conduct an Industry Day on October 27, 2026, to provide further details on the acquisition strategy and requirements, with RSVPs required by October 23, 2026. Design deliverables are structured around sequential submissions at 65%, 95%, 100%, and Issued for Construction milestones.
Commercial and Institutional Building Construction

POSTED

13 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS