This Subcontract opportunity from Massachusetts was posted on September 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Utility Pole Installation and Circuit Transfer

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project requires the installation of emergency shut-off switches on power tools within the Facility Engineering Storage/Maintenance Shop in Edinburgh, Indiana. Specifically, the contractor must provide and install two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel featuring a 60A shunt-trip main circuit breaker. All work must comply with OSHA, EPA, FNC guidelines, and applicable state and local building codes. The procurement is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. A mandatory site visit was scheduled for November 10, 2026, with a proposal deadline of November 20, 2026. Bidders must submit a single lump sum contract bid on company letterhead, including a detailed cost breakdown, a timeline for completion, and a 90-day bid guarantee. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Contractors must hold a valid Indiana state contractor's license and provide proof of automobile liability, general liability, and workers compensation insurance. Compliance with Davis-Bacon Act wage rates is required. Deliverables include the installed hardware, a one-year workmanship guarantee, and manufacturer warranties. Payment terms are Net 30. Final acceptance is contingent upon a successful walk-through, the correction of punch list items within 14 days, and the submission of a completed SF 1413 and certified payroll records.
Atterbury Job Corps. – Adams & Associates

POSTED

about 8 hours ago

DEADLINE

in 14 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections on energized transformers under typical load, installing standardized external oil sampling devices to improve safety and access, and performing comprehensive oil testing analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems, provide on-site training for up to 20 agency staff members on inspection tools, and develop standard operating procedures for oil replacement and maintenance. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with infrared inspections performed by ASNT Level 1 certified technicians or higher. The agency intends to make a single award to the most capable offeror based on their past performance, staffing plan, personnel availability, fee structure, and any exceptions taken to contract terms. Qualified bidders must have completed at least two similar projects within the last five years, including at least one for a utility or industrial facility. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and various required forms such as a non-collusion statement and workers compensation certificate. The resulting contract will utilize fixed pricing with a not-to-exceed total cost, and payments will be processed electronically via ACH within 30 days of invoice approval by the Project Manager.
Inland Empire Utilities Agency

POSTED

about 8 hours ago

DEADLINE

in about 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, testing, repairing, and certifying emergency lighting systems to ensure proper illumination along egress paths in compliance with NFPA 101, NFPA 70, and OSHA standards. Key deliverables include a full inventory of fixtures, functional testing via simulated power outages, the application of durable tracking labels to each fixture, integration of maintenance requirements into the facility's Computerized Maintenance Management System, and the provision of hazardous material disposal certificates. The estimated contract value ranges from $25,000 to $100,000, with a performance period of 30 business days following the written Notice to Proceed. Bids are due by December 1, 2026, and must be submitted to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids of $25,000 or more, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. The award will be based on overall best value. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, FAR 52.222-4 for overtime and safety, and the provision of one hour of paid sick leave for every 30 hours worked per EO 13706. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and a completed supplier onboarding packet.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

This subcontract for the Town of Marblehead Electric Light involves the installation of seven new utility poles and associated pole-top hardware, along with the transfer of two 23kV circuits. The project requires the contractor to maintain at least one circuit live throughout the process to ensure service continuity. All work must be performed by Qualified Line Workers using bucket trucks and 23kV rated tools to deliver fully installed poles with active circuits. The project is located on Commercial Street in Marblehead, Massachusetts, under NAICS code 238210. Interested parties must submit their responses by the deadline of October 9, 2026.

General Info

Install seven utility poles and transfer two 23kV circuits in Marblehead by 10/09/2026.

Place of Performance

Commercial Street Marblehead, MA, 01945, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1293-MAR15-MAR15-133096.

The full solicitation package (54 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

23KV POLE REPLACEMENT AND TRANSFER

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → MAR15 - Electric Light
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation of poles and circuit transfers for prime contractors on Town of Marblehead Electric Light projects. Installs seven new poles and pole-top hardware, and transfers two 23kV circuits while maintaining at least one circuit live for service continuity. Utilizes bucket trucks and 23kV rated tools. Requires Qualified Line Worker certifications. Delivers installed poles with active circuits.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS