Utility Potholing and Verification (QL-A)

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 49914.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Willow Lake Drainage Improvements, Phase 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → City of Hudson
ContactsNo contacts available
OfficeN/A
Organization / AgencyOhio → City of Hudson
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs subsurface utility verification for prime contractors on City of Hudson projects. Identifies exact location and depth of existing utilities via potholing. Uses vacuum excavation for gas or electric facilities. Removes and disposes of material and restores disturbed areas per Quality Level A (QL-A) standards. Delivers verified utility locations, depths, and restored surface areas.

Similar Contracts

Same NAICS industry code

More opportunities from Ohio → City of Hudson

Same awarding agency

NAICS: 237110
New
SLED
Willow Lake Drainage Improvements, Phase 2
Solicitation # 49914
The Willow Lake Drainage Improvements, Phase 2 project is a public works solicitation issued by the City of Hudson, Ohio, for comprehensive stormwater infrastructure upgrades. The scope of work involves the installation of new 30-inch and 48-inch RCP and HDPP storm sewers, manholes, and catch basins, alongside earthwork and grading to create a new ditch and expand an existing stormwater pond. Additionally, the project requires pavement replacement for roadways, sidewalks, curbs, and trails, as well as necessary restoration and tree care, including root pruning and branch cutting. All work must be completed by July 2, 2027, with substantial completion expected by May 28, 2027. The contract is governed by the City of Hudson's Engineering Standards for Infrastructure Construction and supplemented by Ohio Department of Transportation specifications. Key technical requirements include mandatory closed-circuit television (CCTV) inspections for all new main line sewers and strict adherence to OSHA confined space entry and ANSI tree care standards. Bidders must provide a notarized statement proving at least three years of experience and the successful completion of three similar projects. Award criteria include compliance with prescribed requirements, bidder qualifications, and subcontractor acceptability. The contractor is required to provide a bid guaranty, performance and payment bonds, and general liability, general conditions, and property insurance bonds, while adhering to prevailing wage rates.
Water and Sewer Line and Related Structures Construction

POSTED

about 5 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
SLED
48" Storm Culvert Addition & New Box Culvert (SR 303 to Existing Box Culvert at Rosewood Grill)
Solicitation # 49718
The City of Hudson, Ohio, is soliciting bids for the 48 inch Storm Culvert Addition and New Box Culvert project located on E. Streetsboro Street (SR 303). The scope of work includes the removal and replacement of an existing box culvert with a 4x6 precast concrete box culvert, the installation of 230 linear feet of 48 inch HDPP storm pipe, and the replacement or relocation of a 12 inch cast iron water main. Additional requirements include storm tie-ins, clearing, grubbing, pruning, and the restoration of the roadway and parking lots. All work must adhere to City of Hudson and ODOT standards, as well as OSHA regulations for confined space entry and tree trimming. This is a unit price contract with a phased completion schedule. Phase 1 must be completed by February 5, 2027, with final completion for Phases 2 and 3 due by April 30, 2027. A construction blackout period is mandated from December 21, 2026, to January 4, 2027. Liquidated damages for delays are set at 1,000 dollars per day. Bidders must submit their proposals electronically via Bid Express by November 17, 2026, and must provide a bid security of at least 10 percent of the bid price. Qualified contractors are required to have at least three years of experience in similar projects and must comply with Summit County prevailing wage determinations.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS