Valve & Appurtenance Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Valve and Appurtenance Installation is issued by the Municipal Utilities and Engineering Department of the City of Redlands in California. The selected contractor will be responsible for supplying and installing various water system valves for prime contractors on city water pipeline projects. The scope of work includes the installation of 8 inch gate valves with valve cans, as well as 16 inch and 24 inch butterfly valves and ball valves. The contractor is required to deliver fully operational valve assemblies installed in-place, which involves performing saw cutting of pavement, trenching, and bedding in accordance with Sections 15108 and Appendix F. This opportunity falls under NAICS code 238110, with a response deadline set for November 16, 2026.

General Info

City of Redlands subcontract for water valve installation, due November 16, 2026.

Documents

This scope was carved out of 501071.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2026 CIP Water Pipeline Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Municipal Utilities and Engineering Department of City of Redlands
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs water system valves for prime contractors on City of Redlands water pipeline projects. Installs 8" gate valves with valve cans, 16" and 24" butterfly valves, and ball valves. Performs saw cutting pavement, trenching, and bedding per Sections 15108 and Appendix F. Delivers fully operational valve assemblies installed in-place.

Similar Contracts

Same NAICS industry code

More opportunities from California → Municipal Utilities and Engineering Department of City of Redlands

Same awarding agency

NAICS: 237110
New
SLED
2026 CIP Water Pipeline Replacement Project
Solicitation # 501071
The 2026 CIP Water Pipeline Replacement Project (Project No. 501071) for the City of Redlands, California, involves the installation and replacement of approximately 3,500 linear feet of ductile iron water pipeline ranging from 8 to 24 inches. The scope of work includes furnishing and installing pipes, fittings, valves, and fire hydrants, as well as managing traffic control, utility location, pavement removal and repair, earthwork, and the restoration of all areas to pre-construction conditions. The project must be completed within 100 working days from the issuance of the Notice to Proceed and adheres to the 2021 Greenbook Standard Specifications and Municipal Utilities and Engineering Department standards. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Eligible bidders must hold a Class A or Class C-34 license and provide a qualification statement documenting three similar projects completed within the last two years. Required bid security is a bond or check for 10% of the bid price, and the successful awardee must provide performance and labor and material bonds for 100% of the bid amount. Compliance with California Labor Code prevailing wage requirements and the City of Redlands Contractor Safety Program is mandatory. Final acceptance is subject to inspection by the Engineer, with a one-year warranty period for the correction of defective materials or workmanship.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
SLED
REDLANDS WASTEWATER TREATMENT PLANT UPGRADES - PHASE 2 - REBID
Solicitation # 521006
The City of Redlands Municipal Utilities and Engineering Department is soliciting proposals for the Redlands Wastewater Treatment Plant Upgrades Project - Phase 2, Project No. 521006. Located at 1950 Nevada St. Redlands, CA, the scope of work requires the contractor to provide all project management, labor, materials, tools, and equipment necessary for comprehensive plant improvements. Key technical deliverables include headworks improvements such as new airflow monitoring, washer-compactors, and washer-classifiers; ventilation upgrades for the Primary Sludge Pump Station; and the installation of SolarBee solar powered mixers and redundant pipelines for peak ponds. The project also involves SCADA interfacing, electrical code remedies, and the construction of a new precast concrete building for MCC replacement. The contract will be awarded to the responsible bidder offering the lowest total bid price. Bids must be submitted by November 12, 2026, at 2:00 p.m. via PlanetBids and delivered to the City Clerk's office. Requirements for submission include a bid bond equal to 10 percent of the bid, a non-collusion affidavit, and a qualification and experience statement. The selected contractor must commence work within ten calendar days of the Notice to Proceed and adhere to strict regulatory standards, including Federal Davis-Bacon wage requirements, the Build America, Buy America Act, and ADA Title III accessibility regulations. Quality assurance is emphasized through the requirement of a dedicated Quality Control Manager with at least three years of experience and mandatory factory inspections of equipment prior to shipment.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS